Text version
Sheet1
1. Is your firm interested this project as a prime contractor? If yes, please complete the details in #2 below, and submit a capability narrative.
| 2. Please complete a line for each individual from your company that you wish to receive correspondence from your firm. If you do not have a NCAGE or SAM registration, please leave blank. | |||||
| Company Information | Primary Point of Contact (POC) Information | ||||
| (Firstname Lastname) | Interest in the Project | ||||
| Company Name | Country of Incorporation | CAGE/ |
NCAGE
| Code | SAM UIE Code | SAM Registered? | |||||||
| (Yes or No) | Primary Point of Contact (POC) | ||||||||
| (Firstname Lastname) | POC Title | ||||||||
| (President, Proposal Manager, Etc.) | POC Email | POC Phone | |||||||
| (including +XXX country code) | Prime, Joint Venture, or Sub-contractor? | ||||||||
| If sub-contractor, what type? | |||||||||
| Company Name | Germany, etc. | 12345 | 123456789 | Name 1 | Engineer | name@domain | +49… | Prime | |
| Company Name | Germany, etc. | 12345 | 123456789 | Name 2 | President | name@domain | +49… |
| 3. Provide a minimum of three (3) recent OCONUS ICD-705 construction projects, in receding order based on date of completion, of similar size, scope, and complexity your firm has performed as the Prime Contractor. Recent is defined as having been 100% successfully completed within the last ten years. |
| The SOC can be described on this form or under a separately labeled document submitted with this form. |
4. Describe three (3) critical construction project risks encountered on the top three (3) listed SOC projects, and mitigation steps taken to minimize or remove the risk.