Sources Sought Questionnaire.pdf
PDF 189 KB Posted
- Attached to
- Replace Piping Under Housing Unit- FPC Bryan Federal contract opportunity
- Solicitation number
- 15B50425PR000049
About this file
This is a Sources Sought questionnaire issued by the Federal Bureau of Prisons Field Acquisition Office for replacing piping under housing units at the Federal Prison Camp (FPC Bryan) in Bryan, TX. The project requires a contractor to replace all utility piping under slab for two housing units, including domestic water, sewer waste, and chilled/heating water systems, with an estimated project value between $500,000 and $1,000,000.
The project has a 140-day performance period and falls under NAICS code 238220 with a $19 million small business size standard. Responses to the questionnaire are due by February 5, 2025, to pford@bop.gov. The work includes removing and installing new boiler burners, gas lines, wiring, and control systems for two boilers. Contractors must obtain necessary permits and follow manufacturer recommendations. The subsequent solicitation will be posted on sam.gov, and contractors must be registered in SAM to be considered for award. The questionnaire asks about business size, socioeconomic status, subcontracting plans, and ability to meet the timeline requirements.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Justice Federal Bureau of Prisons Field Acquisition Office
U.S. Armed Forces Reserve Complex Grand Prairie, Texas 75051
January 30, 2025
Sources Sought Questionnaire Field Acquisition Office Building and Facilities Section (B&F) Federal Correctional Complex Pollock Sources Sought 15B50425PR000049
The Federal Bureau of Prisons is conducting market research in accordance with Federal Acquisition Regulation, Part 10. A single solicitation will be issued for Replace Piping Under Housing Unit. The Federal Bureau of Prisons (FBOP), Federal Prison Camp (FPC Bryan) located at 1100 Ursuline Avenue, Bryan, TX 77803, intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to replace piping under housing unit. The contractor is responsible replace all utility piping under slab for two housing units including domestic water, sewer waste, and chilled/heating water. It is the contractor’s responsibility to obtain permitting, should it be required. All manufacturer’s recommendations will be required to be implemented.
This sources sought questionnaire is for information purposes only. The described requirement may or may not be included in the subsequent solicitation.
A summary of the requirements is as follows: The contractor will remove existing and install new of following for two boilers: boiler burners, gas lines, wiring, and control system.
Please answer the following questions:
1. Can your firm provide Replace Piping Under Housing Unit at the institution specified above?
__________ Yes ___________ No
2. If you answered “No” in Question 1 above, what construction requirements can your firm provide?
3. The North American Industrial Classification System (NAICS) code for Plumbing, Heating, and Air Conditioning Contractors is 238220, which sets the small business standard at $19.0 million.
Based on this standard, what is your business size, small or large?
__________ Small ___________ Large
4. What level of subcontracting, if any, would your fir utilized to provide the listed requirement?
5. Are you eligible for participation in one of the following small business programs? If so, please indicate the program.
__________ “8(a)” Program __________ Women-Owned Small Business concern __________ Economically Disadvantaged Women-Owned Small Business concern __________ HUBZone Small Business concern __________ Veteran-Owned Small Business concern __________ Service-Disabled Veteran-Owned Small Business concern
6. The Performance Period estimated for this project is 140 calendar days. Does this time frame appear to be suitable for your firm to complete the requirement?
________Yes ________No
If not, what time frame in calendar days would it take your firm to complete?
___________Calendar Days
7. How many calendar days does your firm need to prepare a proposal resulting from this solicitation?
_____________ 45 days _____________ 60 days
8. If awarded a contract, how many calendar days after the award could you begin construction?
Please note that all individuals working on site at the institutions must undergo a security clearance investigation. This investigation may take 30 calendar days or longer to complete.
________ Calendar days after Contract Award
9. Please furnish the following information in reference to your firm:
Name:
Address:
Point of Contact:
Telephone Number:
E-mail Address:
Please e-mail your responses to pford@bop.gov. Responses must be received no later than February 5, 2025 mailto:pford@bop.gov
A few notes regarding all FBOP requirements:
1. The resulting solicitation will be distributed solely through the General Services Administration Federal Business Opportunities website at sam.gov. Hard copies of the solicitation are not available. The website provides download instructions to obtain all documents relating to the solicitation. All future information concerning this acquisition, including the pre-solicitation notices, solicitation, and any subsequent amendments, will be distributed solely through the website. Interested parties are responsible for monitoring the website to ensure they have the most current information about the acquisition.
2. Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in the System for Award Management (SAM) at www.sam.gov. In order to qualify for award, your business size metrics information entered in your SAM registration must be less than or equal to the size standard specified above. You must also have the NAICS code stated.
Each bidder's SAM registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement and the stated NAICS code is listed. All bidders are urged to double check their SAM registration and update as necessary, including the size metrics information and NAICS code.
https://beta.sam.gov/
| Check Box1: Off |
| Check Box2: Off |
| Text3: |
| Text4: |
| Check Box5: Off |
| Check Box6: Off |
| Text7: |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Text16: |
| Check Box17: Off |
| Check Box18: Off |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
File details come from the government source that posted it. Updated .