About this file
This sources sought notice and related federal contract opportunity document provide information for the J. Percy Priest North Murfreesboro Greenway Phase 2 project. The U.S. Army Corps of Engineers, Nashville District is seeking capability statements from contractors by January 4, 2021 to build an approximately 8,458 foot long, 10 foot wide multi-use paved trail along an existing equestrian trail in Murfreesboro, Tennessee. The estimated value of the construction contract is between $1,000,000 to $5,000,000. Respondents are asked to provide details of relevant past experience, bonding capacity, and whether they intend to submit a bid. The information collected will be used to determine contractor interest and qualifications to decide on an appropriate acquisition strategy, such as an unrestricted solicitation or small business set-aside. An official solicitation is expected to be issued on April 9, 2021.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT
The Government is issuing this Sources Sought to determine a competitive basis for the procurement described. This is not a solicitation. No reimbursement will be made for any costs associated with providing information in response to this survey.
This survey is for market research purposes only. Only contractors capable of performing this type of work should respond to this Sources Sought.
Requirement
The U.S. Army Corps of Engineers (USACE), Nashville District, anticipates a requirement for a firm fixed-price construction contract for J. Percy Priest North Murfreesboro Greenway Phase 2 project. The estimated magnitude of this project is between $1,000,000 and $5,000,000.
The Contractor will be responsible for the following activities/items under the proposed contract:
The purpose of this project is to build a multi-use paved trail along an existing equestrian trail at Central Valley Trailhead in Murfreesboro, TN. The greenway is estimated to be 8,458 feet long and 10 feet wide. The greenway will have a variable cross slope to support positive drainage towards the East Fork Stones River not exceeding 2% slope. The equestrian trail and the greenway will be separated by a 3-rail wood fence when spacing between the two trails is under 15’ from the edges to ensure proper distance between pedestrians and horses. At the end point the greenway will loop the trail back into itself.
The contractor will be required to provide all plant, labor and materials to complete the project.
*Please note that this description is subject to change.
The anticipated NAICS code is 237990 – Other Heavy and Civil Engineering Construction with a size standard of $39.5 million.
Survey The Government is issuing this notice to determine a competitive basis. This is not a solicitation and the items listed herein are subject to change or eliminated from the requirement. This survey is for market research purposes only. Only contractors capable of performing this type of work should respond to this Sources Sought.
Your response to this survey is requested by 11:00 AM Central Time, January 4, 2021. Please send by email to Cierra Mendoza at Cierra.R.Mendoza@usace.army.mil
1) Name of your firm:
2) CAGE:
3) Point of Contact, Phone number and EMAIL address:
4) Please provide responses to the following:
1) List three (3) projects completed within ten (10) years of the date of this notice that demonstrates experience, as a prime contractor or subcontractor.
(a) Project Name:
Contract Number (if applicable):
Year Completed:
Prime Contractor or Sub-Contractor:
Type and percentage of work self-performed (based on contract value):
Dollar Amount:
General Description of project:
(b) Project Name:
Contract Number (if applicable):
Year Completed:
Prime Contractor or Sub-Contractor:
Type and percentage of work self-performed (based on contract value):
Dollar Amount:
General Description of project:
(c) Project Name:
Contract Number (if applicable):
Year Completed:
Prime Contractor or Sub-Contractor:
Type and percentage of work self-performed (based on contract value):
Dollar Amount:
General Description of project:
5) Are you a Small Business classified under the above NAICS code? If so, do you fall into a sub-category (e.g. HubZone, 8(a), SDVOSB, WOSB, etc.)?
6) For this requirement, what percentage of this work would you subcontract (reference FAR 52.219-14, Limitations on Subcontracting, Class Deviation 2019-O0003)?
7) Do you plan to subcontract to only small businesses?
8) If the answer to question 7 is “yes”, are these small businesses with a sub-category (e.g. e.g. HubZone, 8(a), SDVOSB, WOSB, etc.)
9) What is your bonding capacity per contract?
10) What is your aggregate bonding capacity per contract?
11) If this requirement is advertised, do you anticipate submitting a bid?
12) Please provide any additional information you feel is necessary: