SOURCES SOUGHT
FOR
CONSTRUCT NEW BULKHEAD, HUGO LAKE, OKLAHOMA
This is a SOURCES SOUGHT announcement; a market survey for information only, to be used for preliminary acquisition planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought announcement or any follow up information requests. Respondents will be notified upon request following the sources sought evaluation results.
The U.S. Army Corps of Engineers (USACE) - Tulsa District (SWT) is conducting market research for an anticipated Design-Bid-Build contract and intends to solicit proposals on or about July 2025. The type of set-aside decision(s) to be issued will depend upon the responses to this Sources Sought announcement and associated market research.
The work is located at Hugo Lake, approximately as indicated. The exact storage and work locations will be shown by the Contracting Officer. Final delivery of the bulkhead segments will be within 5 miles of 3107 US Hwy 70 E, Sawyer, OK 74756.
Provide a new segmental Bulkhead Assembly that is used to block water from flowing through the tainter gate bays while the tainter gates are being serviced or inspected. The Bulkhead Assembly is comprised of six individual 51-foot-long hollow steel tubular segments, which are assembled in the reservoir to create a single bulkhead. The assembled floating bulkhead will be ballasted with water using mechanical pumps and rotated to a vertical orientation for placement against the tainter gate piers.
Provide a crane pad to allow for closer access to the lake for deployment and retrieval of the segmental bulkhead.
The Bulkhead can be assembled and disassembled in the water. Bulkhead segments can be removed and stored out of the water when not in service.
The work includes the fabrication, shipment, field assembly, testing of a segmental bulkhead and incidental related work, and the construction of a crane pad.
Optional Work: Contractor must remove and dispose of the existing bulkhead
The purpose of this Sources Sought is to gain knowledge of the interest, capabilities and relevant experience of all business size standards to provide construction for work assigned to USACE Southwest Division (SWD) as well as USACE national initiatives, international, & interagency support. The Government must ensure there is adequate interest and competition among the potential pool of responsible firms. Interested Small Business, Section 8(a), Historically Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB), Service-Disabled Veteran Owned Small Business (SDVOSB) Concern, and Large Businesses are highly encouraged to respond to this Sources Sought.
The total contract capacity is estimated between $5,000,000.00 and $10,000,000.00.
The North American Industrial Classification System (NAICS) Code for this procurement is 237990, Other Heavy and Civil Engineering Construction, which has a small business size standard of $45M.
Small Business firms are reminded under FAR 52.219-14(e)(4), Limitations on Subcontracting, that at least 15 percent of the cost of contract performance incurred for personnel shall be expended for employees of a similar concern.
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting, that a firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85% subcontract amount that cannot be exceeded.
Large Businesses must comply with the FAR 52.219-9 by submitting a Small Business Subcontracting Plan should this action be solicited as Full and Open Competition and an award is made to a large business firm.
Note that Firms must be registered in the System of Award Management (SAM) to be eligible for award of Government contracts.
Contractors responding to this Sources Sought must provide an Experience/Capabilities Statement (not to exceed 5 pages).
EXPERIENCE / CAPABILITIES STATEMENT CRITERIA:
1. The Experience/Capabilities Statement is limited to 5 pages and shall be submitted in PDF format with the following file name convention: ACME_SS W912BV24RCR03_EXP STATEMENT.
2. Provide Firm's name, address, point of contact, phone number, e-mail address and business CAGE Code, as well as Unique Entity Identifier (UEI).
3. Provide any general information on the Firm's Experience/Capabilities as they pertain to wall replacement into a permanent structure construction and self-performance requirements.
4. Provide the Firm's Teaming Arrangement, Joint Venture and/or Mentor-Protege information, as applicable.
5. Provide up to three examples of construction projects performed within the past 3 years relevant to this Sources Sought. Include the customer agency/installation name, project title, project location, contract number, project description, construction contract amount, and period of performance for each example project provided. If proposing as a Teaming Arrangement, Joint Venture and/or Mentor-Protégé, the three examples provided must be submitted as a team and not as separate firms.
Questions concerning this Sources Sought should be e-mailed to the Contract Specialist, Mr. Clinton J.
Yandell at clinton.j.yandell@usace.army.mil; phone number (918) 669-4920.
PERSONAL VISITS FOR THE PURPOSE OF DISCUSSING THIS SOURCES SOUGHT WILL
NOT BE ENTERTAINED.
Email your Experience/Capabilities statement to clinton.j.yandell@usace.army.mil.
NO HARDCOPY OR FACSIMILE SUBMISSIONS WILL BE ACCEPTED.
THIS SOURCES SOUGHT CLOSES ON 24 March 2025 at 1100 CST.
Place of Contract Performance: Denison Powerhouse, Denison, Texas