- REPLACE TIMBER CURB & SIDEWALK PARK LOTS Federal contract opportunity
- Solicitation number
- 140P6321B0010
About this file
This sources sought announcement seeks information from vendors interested in replacing deteriorated timber curbing and walkways at ten parking lots within Badlands National Park. The project involves removing approximately 6,049 feet of timber curbing and 4,259 feet of asphalt walkways, and installing approximately 6,049 feet of concrete curbing, gutters, and 4,259 feet of concrete sidewalks. All new sidewalks, curbs and gutters must meet ADA and ABA accessibility regulations. Interested vendors must provide company information and capabilities statement by email no later than April 12, 2021. The total value of the project is estimated between $250,000 to $500,000. The NAICS code is 237310 for highway, street, and bridge construction.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT (MARKET SURVEY)
Replace Deteriorated Timber Curbing and Walkways (Reference 140P6321B0010)
The National Park Service (NPS) is conducting a market survey to determine the interest and capability of vendors for a possible upcoming project. All costs associated with providing information in response to this market survey shall be the responsibility of the firm. Any information submitted is voluntary. The Contracting Officer will make an acquisition strategy decision based on the results of this market survey and a future solicitation may be issued as unrestricted without further consideration.
This is not an invitation for bid (IFB) or request for proposal (RFP) and does not constitute any commitment by the Government to issue any solicitation. All interested firms must respond to future solicitation announcements separately from responses to this market survey. Any solicitation that may be issued will be posted on FBO/beta.sam.
Magnitude: Between $250,000 and $500,000
Background: Badlands National Park has 10 Parking lot areas/walkways with timber curbing, and asphalt walkways for accessibility and safety for park visitors that has deteriorated due to repeated use and harsh weather conditions. The goal of this project is to upgrade from timber curbing and asphalt walkways to concrete in order to be in compliance with American with Disabilities (ADA) and Architectural Barriers Act (ABA) and reduce tripping hazards for park visitor safety.
Project Location: Badlands National Park Interior, South Dakota 57750- Exit 131 off Highway Route 90. 10 Park parking lots located along Badlands National Park Loop Road (Rt 240) Locations: Big Badlands Overlook, Door/Window Trails, Cliff Shelf, White River Valley Overlook, Panoramic Point Overlook, Prairie Winds Overlook, Burns Basin Overlook, Homestead Overlook, Conata Basin Overlook, and Pinnacles Overlook.
Project Description: The work for this project consists of removing approximately 6,049 feet of deteriorated wood timber (6-inch x 6-inch) curbing, and approximately 4,259 feet of asphalt walkway in ten parking lot areas throughout the park. The project would also consist of installing approximately 6,049 feet of 6-inch concrete curbing, gutters, and 4259 feet by 6 feet wide concrete sidewalks. All sidewalks, curbs, and gutters will slope to the parking lots. All sidewalks and handicap walks and parking spaces shall meet ABA regulations. Cliff shelf trail has a bump out of asphalt currently being used for a walkway and will need replaced with concreate see picture below. When installing new curb/gutter a cut no more than 5 foot away from where curb/gutter are going to be installed should be made into the parking lot. The new curb/gutter shall tie into the new asphalt. The new asphalt will then tie into the existing asphalt in the parking lot. Not more than 2 sites will be closed off at one time. Contractor should not move to put a new site under construction until the work at one or both sites under construction is complete and ready for vehicle use.
Performance Period: The performance period is expected to be 120 days.
On-site work hours: Work is expected to be performed during normal business hours of 6 a.m. to 4:30 p.m., Monday through Thursday. Work on Fridays, Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the Contracting Officer
The associated NAICS code is 237310, Highway, Street, and Bridge Construction. The small business size standard is $39.5 million.
Interested firms must submit the information on the last page of this document.
Name of Firm
Address
Phone Number
Email Address
DUNS Number
Size status/SBA certifications. Mark all that apply. See FAR Part 19, Small Business Programs.
☐ Small Business (meets size standard for NAICS) ☐ Women Owned Small Business (WOSB) ☐ HUBZone ☐ Service-Disabled Veteran Owned Small Business (SDVOSB) ☐ 8(a) ☐ Other Than Small
Capability statement - A brief summary of capabilities:
All responses must be submitted via email not later than 12:00 Noon MST, April 12, 2021. Email address: BRIAN_L_PECK@nps.gov. Include the reference number (140P6321B0010) in the subject line.