This solicitation requests responses for a radar system and related materials and labor in support of the Fort Eustis Harbor Master. The 633rd Contracting Squadron at Joint Base Langley-Eustis seeks a BRAND-NAME OR EQUAL FURUNO marine radar system along with all items identified in solicitation FA480024QA011 and the attached Statement of Requirement. All items must be new. This is a 100% small business set-aside solicitation issued by the Department of the Air Force Air Combat Command. Responses are due based on the dates provided in solicitation FA480024QA011 for the radar system, materials, and labor to support the Fort Eustis Harbor Master operation.

View the file

Other files for this federal contract opportunity

Other files attached to Radar System - Ft Eustis Harbor Master, newest first.
File Type Posted
AMENDMENT TO RADAR SYSTEM FA480024QA011 (as of 03.07.24).docx DOCX document
SOR Harbor Master Radar REVISED 03.07.24.docx DOCX document
AMENDMENT TO RADAR SYSTEM FA480024QA011.docx DOCX document
Combo Solicitation - FA480024QA011 Harbor Master Radar.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF REQUIREMENT

Procurement and Installation of Harbor Master Radar System 733 LRD Harbor Master Office, Ft Eustis, Virginia

1.0 OBJECTIVE. Procurement and installation of BRAND NAME OR EQUAL Furuno harbor master radar system for the HMO tower located on Ft Eustis, VA.

2.0 SCOPE.

2.1 The contractor shall furnish all materials, equipment, tools, labor and incidentals as required for the procurement and installation of a new BRAND NAME OR EQUAL Furuno marine radar system, to include removal or the existing system. Upon removal and completion of installation, existing system and any pertinent manuals for the new system will be turned into the Harbor Master office.

2.2 Execution of work shall be IAW the applicable contract documents, clauses, and any installation requirements.

2.3 Any individual performing technician services shall have up-to-date certifications or training on the installed system(s). The contractor shall provide a list of the personnel performing the work and documentation of their certifications to the On-Site Representative.

2.4 Work Area Requirements. The contractor shall clean up all debris and discarded materials resulting from their operations at the end of each workday. All waste materials shall be disposed of off FT Eustis unless otherwise approved.

2.5 There shall be no deviations or substitutions without prior approval from the Contracting Officer. The contractor shall not comply with any order, direction, or request of any government personnel unless it is issued in writing and signed by the Contracting Officer.

3.0 SECURITY.

3.1 All work shall be performed during hours as coordinated with an on-site representative. The on-site representative will ensure the Contractor employees and subcontractors have access to the site five days a week, 0600 to 1700, as a minimum, excluding US Federal holidays. The on-site representative will also ensure access at other times, including weekends and after-duty hours after receipt of a service call.

3.2 The Contractor shall be responsible for safeguarding all government equipment, information, and property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

4.0 MATERIALS.

4.1 Requested Radar System Materials: Furuno BRAND-NAME OR EQUAL

Part Number/Part Name/Quantity Requested

1. FAR2228BB RADAR, Qty: 1

2. XN20CF/6.5 ARRAY, Qty: 1

3. 001-259-830-00 15M CABLE, Qty: 1

4. MU192HD MARINE MONITOR, Qty: 1

5. 001-523-270-00 CHART PCB, Qty: 1

6. SCX21 SATELLITE COMPASS, Qty: 1

7. POLE MOUNT, Qty: 1

8. RAIL MOUNT, Qty: 1

9. LABOR for removal of existing system and installation of new radar system:

a. Removal of existing x7 Furuno Radar

b. Installation of FAR2228BB Gearbox, processor, display and controller unit

c. Installation of SCX21 on rail mount assembly

d. Integration of SCX21 to FAR radar assembly

e. Installation of radar plotter board in processor

f. Removal and installation of new radar cable assembly

g. Hook-up existing sensors previously connected to x7 radar into new FAR2228BB (does not include additional cable runs to hookup new sensors except for SCX21).