SOR Fuel Pump Draft.pdf

PDF 170 KB Posted

Attached to
Sources Sought_Civil Air Patrol_Fuel Pump_Maxwell AFB, AL Federal contract opportunity
Solicitation number
FA330023S0003
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought_Civil Air Patrol_Fuel Pump_Maxwell AFB, AL, newest first.
File Type Posted
Civil Air Patrol SAM Sources Sought.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Requirements Fuel Tank and Pump Installation – CAP-USAF

1.0 PURPOSE. CAP-USAF requires a fuel tank and pump system capable of distributing 100 Low Lead

(LL) Aviation Grade gasoline. The current system run and maintained by the 42 FSS is in the middle of the disposal process.

2.0 DESCRIPTION OF ITEMS. The following items are required for performance under this contract:

All items below are described in generic terms.

2.1 4000 gallon above-ground double-walled fuel tank and required filter system.

2.2. 25 gallon/minute 12V Aviation Fuel Transfer Pump

2.3. Digital Meter

2.4. Electronic Hose Retraction Wheel with 50 ft hose

2.5. Over-wing aircraft fueling nozzle.

3.0 DELIVERY REQUIREMENTS:

3.1 No special delivery requirements. All outdoor work.

3.2 Delivery will be made in front of Hangar 843.

4.0 INSTALLATION REQUIREMENTS: Installation will require pouring of an approximate 300 sq.

ft. concrete pad and necessary electrical work.

5.0 TRAINING REQUIREMENTS: CAP-USAF will ensure all training is completed prior to installation.

5.1. Steel Tank Institute Inspection Training

5.2. Spill Management

6.0 STANDARD WARRANTY: The contractor shall provide any Original Equipment Manufacturer (OEM) standard commercial warranty applicable to the products being purchased at no additional cost to the Government.

6.1 Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, CDs and DVDs and other documentation on all equipment.

6.2 Prior to project acceptance, the contractor shall provide written procedures, points of contact within company, and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty equipment.

7.0 GENERAL INFORMATION: Items must be brand new. Refurbished items are not authorized.

File details come from the government source that posted it. Updated .