SOLICITION W911N2-24-R-0006.pdf
PDF 896 KB Posted
- Attached to
- CNC Punch Machine Federal contract opportunity
- Solicitation number
- W911N2-24-R-0006
About this file
This is a solicitation for a CNC Punch Machine. The Army Materiel Command Contracting Command Redstone Arsenal is seeking to purchase a Computer Numerically Controlled Punch System to be installed at Letterkenny Army Depot. The system must be able to cut materials up to 1/2 inch thick with positioning accuracy of +/-0.004 inches and repeatability of +/-0.0012 inches. Offerors must provide all equipment, installation, and training services. The closing date for offers is 1:00 PM on February 16, 2024. The contract will be a firm fixed price award made to the responsible offeror providing the lowest priced technically acceptable proposal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOLICITION AMENDMENT W911N2-24-R-0006 0004.pdf | ||
| SOLICITION AMENDMENT W911N2-24-R-0006 0003 conformed copy.pdf | ||
| SOLICITION AMENDMENT W911N2-24-R-0006 0004 conformed copy.pdf | ||
| SOLICITION AMENDMENT W911N2-24-R-0006 0003.pdf | ||
| SOLICITION AMENDMENT W911N2-24-R-0006 0002 conformed copy.pdf | ||
| SOLICITION AMENDMENT W911N2-24-R-0006 0002.pdf | ||
| SOLICITION AMENDMENT W911N2-24-R-0006 0001.pdf | ||
| SOLICITION AMENDMENT W911N2-24-R-0006 0001 CONFORMED COPY.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
( No Col lect Cal ls )
W911N224R0006 16-Jan-2024
b. TELEPHONE NUMBER
717-267-8357
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 16 Feb 2024
5. SOLICITATION NUM BER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
( SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t . Use Only)
23.
CODE 10. TH IS ACQUISI TION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911N29. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAM E
JONATHAN K. CARROLL
2. CONTRACT NO. 3 . AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLI CI TATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52. 212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRI ATION DATA
1. REQUISITION NUMBER
20.
ADDI TIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25G1Q331900ST
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52. 212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDI NG ANY ADDITI ONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO I TEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THI S DOCUMENT AND RETURN
% FOR:SET ASI DE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTI NG OFFICE - ACC
1 OVERCASH AVENUE CCAM-DSL BLDG 2S
CHAMBERSBURG PA 17201-4150
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W25G1Q 16. ADMINISTERED BY
12. DI SCOUNT TERMS11. DELIVERY FOR FOB DESTI NA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLIC ITATION
RFQ IFB RFPX
INSTALLATION SUPPLY DIVISION
LETTERKENNY ARMY DEPOT
1 OVERCASH AVENUE
CHAMBERSBURG PA 17201-4150
TEL: 717 267- 9488 FAX: 717 267-9713
717-2679834FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
333517
X
OFFER DATED
29. AW ARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWI SE IDENTIFI ED ABOVE AND ON ANY
COPI ES TO ISSUI NG OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN- OWNED
SM ALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF44
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEI VED INSPECTED
32b. SIGNATURE OF AUTHORI ZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATI VE
32e. MAILI NG ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORI ZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FI NALPARTIALCOMPLETE
36. PAY MENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHI P NUMBER
PARTI AL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAY MENT
41b. SIGNATURE AND TITLE OF CERTIFYI NG OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC 'D (YY/ MM/DD) 42d. TOTAL CONTAI NERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911N224R0006
Section SF 30 - BLOCK 14 CONTINUATION PAGE
SOLICITATION NOTES
1. System for Award Management (SAM): In accordance with FAR 4.1102, Offerors shall be registered in the SAM database in order to be eligible for contract award. No award will be made to an Offeror not registered.
Registration can be accomplished at https://sam.gov/content/entity-registration. Registration in this database shall remain active. There has been a recent SAM requirement for submission of notarized letters for all new vendor registrants, and for renewals of existing registrations. Please check your SAM registration and if the registration is due for renewal in the next few months, it is important to start that process immediately. For additional information on notarized letters, visit:
https://www.fsd.gov/gsafsd_sp?id=kb_article_view&sysparm_article=KB0016652&sys_kb_id=8cfe46491b1cb8909 ac5ddb6bc4bcbbb&spa=1.
2. Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. Registration in this database shall remain active and can be accessed at https://sam.gov/content/entity-registration.
3. Questions: Questions regarding this solicitation shall be submitted to the Contracting Officer, in writing, at least 5 calendar days prior to the closing date. Questions submitted after this time will be answered at the discretion of the Contracting Officer. The Contracting Officer for this action is Wanda F. Williams, Wanda.f.williams35.civ@army.mil. The Contract Speialist for this action is Jonathan K. Carroll, jonathan.k.carroll.civ@army.mil.
4. Award without Discussions: The Government intends to award without discussions, offerors should submit their best prices in their initial offer. If FAR Provision 52.212-2, Evaluation-Commercial Items, is included, Offerors must submit all information requested therein in order for the Government to determine technical acceptability.
5. Amendments: The Offeror shall submit to the Contracting Officer signed copies of all amendments issued to this solicitation. Failure to comply may cause your proposal to be rejected.
6. Payment: Payment for this action will be made by Electronic Funds Transfer (EFT) through the Defense Finance and Accounting Services (DFAS) utilizing Wide Area Work Flow (WAWF). See 252.232-7006 for more information.
7. Period for Acceptance of Offers: The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.
8. Type of Contract: The type of contract resulting from this solicitation is specified in FAR Provision 52.216-1, Type of Contract for a Firm Fixed Price Contract.
9. Proposals: Proposals shall be signed by an authorized individual in accordance with FAR 4.102, Contractor’s Signature. Failure to comply may cause your proposal to be rejected. Offerors should mark each page of their proposal as "Proprietary Information" if they want it treated as Proprietary Information under the Procurement Integrity Act.
10. Set- Aside: The proposed contract is 100% set-aside for small business concerns.
11. FOB Destination: Unless otherwise stated in the solicitation, Offerors shall provide FOB Destination prices.
12. Site Visit: Site Visit: Site visit attendance is urged but is not mandatory; however, failure to attend a site visit shall not be a reason for price increases to the contract after contract award. Submit the names of all attendees to Jonathan K. Carroll, email: jonathan.k.carroll.civ@army.mil, phone (717) 267-8357 no later than 26 January 2024, 12:00 PM Eastern Daylight Time. A date and time of the site visit is to be determined. Once the site visit is determined the Offerors are required to obtain a visitor’s pass from the Main Gate prior to arriving at Building 2 South, located beside the Contracting Office, prior to arriving at the Contracting Office. Please allow at least 45 minutes for this process. You must provide a current picture identification, vehicle registration and proof of insurance to obtain a pass. The documentation you receive with your visitor pass must remain with you during the site visit and returned after the site visit and prior to departure of the Depot. **NOTE: FOR THIS SITE VISIT, PLEASE WEAR STEEL TOED SHOES, HEARING PROTECTIONS AND SAFETY GLASSES.
13. Insurance (Fixed Price): Pursuant to the requirements of FAR clause 52.228-5 Insurance-Work on a Government Installation, the contractor shall obtain and maintain at least the following kinds of insurance and minimum liability coverage during any period of contract performance:
a. Workmen's Compensation and occupational disease coverage as required by law except that, if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workmen's Compensation Insurance shall extend to cover employers' liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
b. Comprehensive General Liability Insurance in the minimum limit of $500,000 per occurrence for bodily injury liability.
c. Comprehensive Automotive Liability Insurance with minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury, and a minimum limit of $200,000 per occurrence for property damage.
14. AMC-Level Protest Program: Prior to submitting an agency protest, it is preferable that you first attempt to resolve your concerns with the responsible contracting officer. However, you may also file a protest to the Headquarters (HQ), Army Materiel Command (AMC). The HQ AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accountability Office (GAO), or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 35 calendar days from filing. To be timely, protests must be filed within the periods specified in Federal Acquisition Regulation 33.103. If you want to file a protest under the HQ AMC-Level Protest Program, the protest must request resolution under that program and be sent to the address below.
Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Fax: (256) 450-8840 or email usarmy.redstone.usamc.mbx.protests@mail.mil
The AMC-level protest procedures are found at:
www.amc.army.mil/amc/commandcounsel.html
If internet access is not available, contact the contracting officer or HQ, AMC to obtain the AMC-Level Protest Procedures.
Section SF 1449 - CONTINUATION SHEET
PURCHASE DESCRIPTION
1. SCOPE: This specification establishes the minimum requirements for the purchase of a Computer
Numerically Controlled (CNC) Punch System. The system shall be Contractor installed at Letterkenny Army Depot. The Contractor shall provide all professional architectural, engineering and construction services for the preparation of all necessary drawings, specifications, calculations, cost estimates and related design, permits, fabrication, construction, installation and testing services for the completion of this project.
1.1 DESIGN: The equipment furnished shall be new and of the latest proven model and design. Any equipment incorporating untried methods shall be subject to rejection at the discretion of the Contracting officer. The equipment shall be designed, fabricated, and installed by a manufacturer regularly engaged in the production of this type of equipment and shall be in stock or producible within a reasonable period of time. The supplier of this equipment shall have previously successfully made and installed this type of equipment to industry, other than for his own use. All parts and materials used in the manufacture of this equipment shall be new and unused. All parts and mechanisms subject to periodic adjustment, replacement, or servicing shall be readily accessible.
1.2 SYSTEM DESIGN DEVIATIONS: The following requirements are presented to serve as a guideline to the prospective Contractor and are not intended to discourage creativity. However, deviations from the prescribed guidelines shall be accompanied with a justification of the varying approach.
2. APPLICABLE DOCUMENTS: The following documents are mandatory and the CNC Punch System machine and associated components shall meet all applicable requirements at the date of manufacture.
Supplements or amendments to these publications may be issued during the construction of the equipment and shall be considered to be effective immediately upon receipt by the Contractor.
2.1 GOVERNMENT DOCUMENTS
U.S. Department of Labor:
CFR Title 29, Chapter XVII, Part 1910 – Occupational Safety and Health Regulations (copies may be obtained from http://www.osha.gov/) General Industry, OSHA Safety Health Standards (21 CFR Subpart J)
(copies may be obtained from http://www.osha.gov/)
2.2 NATIONAL FIRE PROTECTION ASSOCIATION
NFPA Standard 70 – National Electric Code NFPA Standard 79 – Electrical Standard for Industrial Machinery (copies may be obtained from http://www.nfpa.org/)
2.3 LEAD REGULATIONS
LEAD Pamphlet No. 385-4 – Requirements for Security, Safety, and Fire Prevention for Contractors Performing Work on Letterkenny Army Depot (copies may be obtained from Letterkenny Army Depot Contracting Office) LEAD Regulation No. 385-1 – Safety & Occupational Health Program (copies may be obtained from https://www.letterkenny.army.mil/Info/Visitors-Information/ “LEAD Safety and Occupational Health Program” Safety Bulleting 23-02 (copies may be obtained from Letterkenny Army Depot Safety Office, 717-267-5253) LEAD Regulation 285-1, Ch 27-2, 17-3
2.4 UNIFIED FACILITIES CRITERIA
UFC 3-600-01 - Fire Protection Engineering For Facilities (copies may be obtained from http://www.nfpa.org/)
3. REQUIREMENTS:
3.1 GENERAL REQUIREMENTS:
3.1.1 SURFACE COATING: All surfaces to be coated shall be cleaned of all foreign matter. The equipment shall be painted not less than one coat of primer and one coat of finish color, or powder coated. All coatings processes and applications shall be IAW standard commercial practice and industry standards.
3.1.2 LUBRICATION: Means shall be provided to ensure adequate lubrication to all moving parts. All oil holes, grease fittings, and filler caps shall be easily accessible.
3.1.3 ENERGY EFFICIENCY: All equipment that directly consumes energy in normal operation shall be designed and constructed for the highest degree of energy efficiency as governed by the latest developments available within industry.
3.2 ENVIRONMENTAL REQUIREMENTS
3.2.1 COMPLIANCE WITH ENVIRONMENTAL LAWS AND REGULATIONS: The Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulations and policies. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR), as well as to the Chief, Environmental Management Division (EMD).
3.2.2 COMPLIANCE WITH LICENSE AND CERTIFICATION REQUIREMENTS: Compliance with
License and Certification Requirements and local permits and approvals: The Contractor shall obtain all licenses and certifications required by Federal, State, and Local environmental laws and regulations necessary and ensure such licenses and certifications remain current throughout the duration of the contracted work to adhere to the specifications of this contract The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority or agency as necessary to adhere to the specifications of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws or regulations shall be considered a contract deliverable upon award. It is the responsibility of the Contractor to identify and obtain all of the installations' required permits and approvals prior to commencement of any of the work specified under this contract and to meet all stipulated conditions and requirements at all times while performing any work. Contractor shall abide by all local and installation requirements and provide a site specific environmental plan as part of the deliverables. Appropriate and detailed notification shall be provided by the Contractor to the Chief of the EMD prior to excavating or conducting any kind of hot work anywhere on the installation where the work is to be performed.
3.2.3 GENERATION OF SOLID WASTE: The Contractor shall remove from the installation and dispose of all solid waste that is generated through their contracted work, and which cannot be recycled, to an approved and permitted off-post disposal facility.
3.2.3.1 The Contractor shall submit in writing the quantities of waste removed and quantities recycled to the
Chief of the EMD or designee on a monthly basis and at the expiration of the contract. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and each of the quantities of materials disposed of and recycled by weight.
3.2.3.2 The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.
3.2.3.3 The Contractor shall make maximum effort to reduce and prevent waste and comply with Executive
Order 13693 and the installation's waste management requirements. Upon completion of the contracted work, the Contractor shall conduct final clean-up of the work site, containerize any debris, and haul it away for appropriate disposal at no additional cost to the Government. The COR or an EMD Representative shall be contacted for approval of the final clean-up work.
3.3 GENERATION OF HAZARDOUS WASTE: The Contractor shall abide by the guidelines stipulated in LEAD EMSP 21-17, Waste Management and shall assign all hazardous waste management responsibilities to the appointed ECD. Contractor shall contact the Chief of the EMD to obtain technical assistance from the installation's Hazardous Waste Program Manager who will assist the ECD with achieving and maintaining compliance with hazardous waste storage and disposal requirements. The EMD will provide hazardous waste drums for the Contractor to containerize hazardous waste generated through the contracted work. Where liquid hazardous waste is to be stored, the Contractor shall provide appropriate secondary containment and ensure containers are properly bonded and grounded where the chemical waste requires it. In addition, the Contractor shall be responsible for maintaining an appropriate spill response and control kit at all times. All spills are reportable and shall be coordinated with the COR and the Chief of the EMD. Contractor shall accumulate hazardous waste prior to disposal shipment in a satellite accumulation point at or near the point of generation, or in a less-than-90-day site, in accordance with Federal, State, Army, and installation regulations or policies. The Government is responsible for removal of all hazardous waste.
Contractor shall contact the Hazardous Waste Program Manager for assistance. The Contractor shall provide a 24-hour notification to the Hazardous Waste Program Manager or designee that hazardous waste containers are ready for pick up and turn in by the EMD. The EMD will remove and dispose of manifested hazardous waste generated by contract activities from the installation to an approved, off-post, permitted hazardous waste disposal facility. The Contractor shall coordinate appropriately with the COR and the Hazardous Waste Program Manager the management of all hazardous waste to include profiling and final disposal. The Contractor shall perform a daily walk-through to ensure all hazardous material and all hazardous waste is properly secured and segregated by compatibility.
Contractor shall reference section 5 of this checklist to ensure compliance with Federal, State and local laws and regulations.
3.4 USE OF HAZARDOUS MATERIALS: The Contractor shall contact the Directorate Hazardous
Material Coordinator to obtain technical assistance with achieving and maintaining compliance with hazardous materials management guidelines, to include requesting and obtaining a Hazardous Materials Approval Group (HMAG), labeling, storage, secondary containment, issue, use, and disposal requirements. Contractor shall submit to the COR or Directorate Hazardous Material Coordinator a hazardous material inventory for any materials to be used in the performance of the contracted work.
The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days and 15 days prior to commencement of work for contracts requiring under 180 days of consecutive work. The inventory list shall contain the hazardous material type and maximum quantities of materials anticipated to be used and stored on-site. The hazardous material shall be properly identified and labeled to include any applicable identification number, such as National Stock Number or Special Item Number and include any applicable hazardous materials management guidelines found on LEAD-R 385-1, Safety Bulletin 23-02 and all applicable hazardous communication (hazcom) requirements or as required. Contractor shall ensure all hazardous materials are properly secured and segregated by compatibility and kept under his or her control at all times. No expired hazardous materials shall be used or stored at the installation. Where applicable, and prior to bringing or removing hazardous materials on, at, or from the facilities where the contracted work is to be performed, the Contractor shall submit copies, preferably in electronic form, of Global Harmonization System (GHS) compliant Safety Data Sheets (SDSs) for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an AMC installation that are listed on EPA toxic chemical list without prior written approval from Chief of the EMD. During the performance of the contracted work, the Contractor shall ensure that hazardous material containers remain under the control of the user at all times and that containers are properly closed when the material is not in use. The Contractor shall not bring into a Government installation any non-approved hazardous materials for use in the performance of their work. Where liquid materials are to be stored, the Contractor shall provide appropriate secondary containment. Upon completion of the contracted work, the Contractor shall conduct final clean-up of the work site, containerize any hazardous material/waste debris, and coordinate with the EMD for pick up and turn in for disposal. Any unused hazardous material and any non-ozone depleting substances or refrigerants brought in by the Contractor shall be recovered and removed from the installation by the Contractor prior to vacating the work site.
3.5 PREVENTION OF SPILLS: The Contractor shall follow LEAD's Integrated Contingency Plan (ICP) which includes the Spill Prevention, Control, and Counter Measure Plan (SPCCP) Plan and reference the LEAD SPCCP and ICP if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. The Contractor shall ensure secondary containment is in place any time liquid materials are stored on-site and shall provide his or her own spill response supplies and have them readily available at each work site. In case of a spill, the person in control of the spill site, or their designated representative, shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department) by dialing 911, the COR and the Chief of the EMD. Contractors storing 1,320 gallons or more of any oil-based product in an aboveground storage tank at a construction site shall follow LEAD's ICP. The Contractor shall immediately respond to actual emergencies and accidents, prevent or mitigate associated adverse environmental impacts, and contact the installation's Fire and Emergencies Services.
3.6 CORRECTIVE ACTION FOR NONCOMPLIANCE: The Contractor shall take immediate corrective action when given a verbal or written notice of environmental noncompliance or nonconformance by the COR or the Chief of the EMD. Failure or refusal by the Contractor to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken by the Contractor.
3.7 INSPECTIONS OF WORK SITES: The Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality. Typical environmental work site inspections are conducted in less than 30 minutes with an approximate frequency of one inspection every two months.
3.8 SAFETY REQUIREMENTS:
3.8.1 EQUIPMENT HAZARDS: Hazards inside the Punch Machine shall be guarded against unauthorized access. Clearly visible signs and symbols shall warn personnel in the area, and interlocks, safety mats and redundant deactivation systems shall guard against accidental access to the tooling. Guards shall be easily removable to facilitate inspection, maintenance, or repair. As part of the applicability of engineering controls, all equipment with rotating and moving parts at point of operation shall comply with LEAD 385-1 Chapter 17-3 machine guarding requirements.
3.8.2 The Contractor is reminded that LEAD maintains a Safety Management System (SMS) and is ISO 45001 certified, AS9100 and AS9110 certified.
3.8.3 LEAD’s safety policy and safety program (LEAD-R 385-1 and Safety Bulletins) can be found at https://letterkenny.army.mil/visitors-Information.
3.8.4 It is the Contractor’s responsibility to be familiar with these documents and to comply with their contents.
3.8.5 The Contractor/Subcontractor will conduct work on Letterkenny Army Depot in compliance with the most current version of 29 CFR 1910 and 29 CFR 1926 (where applicable). The Contractor/subcontractor will be familiar with the types of work they are expected to perform and each particular phase of the operation and associated hazards. All worksites will be free of recognized hazards (per LEAD-R 385-1 27-2).
3.8.6 Each worksite will be assessed for hazards prior to the start of work. All training certifications and an
Activity Hazard Analysis (AHA) will be on hand at the job site.
3.8.7 Any and all on site work at LEAD shall be completed in accordance with applicable OSHA, DoD, Army, and LEAD Safety requirements. As a federal installation, additional requirements other than OSHA apply to Contractors performing work at LEAD. Examples include full conformance to all applicable NFPA standards, ANSI standards, and other consensus standards for the industry covered by the subject contract. It is the responsibility of the Contractor to be familiar with all applicable standards prior to starting work. Additionally, the Contractors shall make themselves familiar with and comply with LEAD's local safety regulation LEAD-R 385-1, AR 385-10, and LEAD-R 420-13 prior to the start of any work at LEAD.
3.8.8 In case of a conflict among these laws and regulations, the most stringent law or regulation shall apply.
It is the responsibility of the Contractor to be familiar with all applicable standards prior to starting work.
3.8.9 A list of all hazardous materials will be maintained at all times. All Safety Data Sheets (SDS) will be present and maintained at all worksites. A copy of all SDS’s will be provided to the Safety Office at the beginning of all projects.
3.8.10 The Contractor shall ensure all employees and all associated sub-Contractor’s employees possess all required licenses for operating any equipment used in the performance of this contract. The Contractor must ensure that any personnel performing under a contract are fully trained, licensed, certified, and qualified for the position in which they shall be serving.
3.8.11 All Contractor personnel shall wear the appropriate PPE when in the following work areas: industrial buildings, at construction sites, test sites and test facilities. Failure to wear/use PPE may cause removal from the job site and/or seizure of non-compliant equipment/items.
3.8.12 If Contractor personnel determine a procedure is unsafe, they shall discontinue work immediately and contact their Program Manager who shall notify safety personnel and the COR. As soon as LEAD Safety Office personnel determine that the unsafe conditions have been corrected, the COR will notify the Contractor Program Manager that personnel may resume work.
3.8.13 The Contractor shall comply with reporting requirements of 29 CFR Part 1904 and AR 385-40 and
APGR and shall report accidents resulting in injury or death and accidents resulting in damage to Government property, supplies, and equipment to the COR promptly of the occurrence. In case of injury/accident, the Contractor shall complete an injury/accident investigation report and submit it to the COR with a copy to the LEAD Safety Office within 24 hours of the event, regardless of if the event is reported to another Safety Management System (SMS).
3.8.14 All safety messages or recalls related to the safe use of products provided by the Contractor will be provided to the LEAD POC for the Contract within 5 days of Contractor’s awareness of the message or notice.
3.8.15 The Contractor will submit SDS for all chemicals including lubricants, coolants, cutting fluid, and oils to be used in the operation of the equipment. The chemicals will not be allowed onsite until they are approved by Letterkenny. All SDSs will be submitted within 30 days after award.
3.8.16 The Contractor will also submit SDS for all chemicals that they bring with them onsite in the execution of the contract requirements such as installation, rigging, offloading, setup, and training. These chemicals will not be allowed onsite until they have been approved by Letterkenny. All SDSs will be submitted within 30 days after award.
4. SPECIFICATIONS: The following specifications cover the major system components of the CNC
Punch System.
4.1 CUTTING CAPABILITY AND ACCURACY: The system shall be capable of cutting ferrous and non-ferrous materials up to and including ¼” thickness. The CNC Punch Machine shall provide the following minimum accuracies over the entire cutting area:
Positioning +/- 0.004” Repeatability +/- 0.0012”
4.2 WORK ENVELOPE: The CNC Punch System shall have a single worktable with the ability to accommodate and work a sheet of material with the minimum size of 60” x 120” without repositioning. The machine shall have a minimum of 20 tons of punch force and be able to hold a work piece with the minimum weight of 330 lbs.
4.3 CONTROL SYSTEM: The CNC Punch controls shall be PC based with a minimum of the latest industry processor and Windows 10 Operating System. All machine functions shall be set through machine code input into the control. The control system shall have adequate program memory (minimum of 1 gigabyte) and hard drive capacity to store current machine software, and capacity to expand, not to impede or degrade the CNC Punch’s speed, accuracy, or performance. The controls shall have at minimum a 19” color monitor, touch screen display, and network capability. Control software shall have the ability to download and process drawing files in “DWG,” “DXF,” and other equivalent formats. The control software shall have the function of part nesting on and offline of the machine. The controls shall have the capability of manual part programming at the machine.
Emergency “E-stop” buttons shall be placed at the machine for quick and easy access. Control software must be compatible with the latest version of TruTops software and the Contractor must supply an applicable post with the machine.
4.4 MACHINE FEATURES: The machine shall include the following:
A maximum 25.5’ x 25.5’ machine footprint.
Programmable presser foot.
Vacuum slug removal system with container Programmable part chute, minimum 16”x24”part size, with sorting capability with two (2) part containers.
A parts chute and part flap.
Tool length compensation Punch spray lubrication Ball transfer table A material table with at minimum three (3) clamping locations (not included with the tool locations).
A beam safety perimeter for the work area
4.5 TOOLING: The system shall have the following tooling capabilities:
Tool magazine shall be able to hold a minimum of 21 tools at one time.
Magazine shall be a rail type, able to use single and multiple tooling/dies in all tooling stations.
Rotational tooling shall be able to be installed in any and all of the magazine storage positions.
All tooling stations shall hold tooling that will punch a minimum of 3” diameter in a single stroke.
Machine shall have capability of forming height of 0.5 inches.
Machine shall be compatible to use existing Trumpf punch tooling.
Machine shall have a rotating single punching head capable of 360 bi-directional rotation of all tooling during the punching action.
Machine shall have a punching head with both punch and retract actions electrically controlled.
Machine shall be accompanied by one (1) complete set of all necessary cartridges/holders and stripper plates for compatibility of existing Trumpf tooling.
Machine package shall include a tool setting gage for proper off machine tool adjustments.
4.7 ACCESSORIES: The CNC Punch will include the following accessories and functions:
Shearing function with tool and die Engraving function with tool and die Part chute sensor Warped Sheet detection Tool Setting quick setting function
4.8 AUTOMATIC LUBRICATION: The system shall include lubrication reservoirs to automatically provide lubricant to critical components.
5. WARRANTY: The Contractor shall submit a statement of warranty of a two (2) year warranty with 2
Preventative Maintenance (PM) visits. The Contractor shall provide commercial warranties for any subcontracted components that will be underwritten. The warranty shall include spare parts, labor, freight, and travel. The warranty shall be effective beginning immediately after, and not before, final acceptance of the CNC Punch.
6. PRESERVATION, PACKING, AND SHIPPING: The Contractor shall utilize standard methods for preservation and packaging appropriate for the components and acceptable to commercial carriers. As a minimum, all areas susceptible to damage from exposure to the elements shall be preserved and/or packed to prevent damage. The Contractor shall be responsible for ensuring that the equipment is delivered to Letterkenny Army Depot in good condition.
7.0 INFORMATION TECHNOLOGY (IT) INDUSTRIAL SYSTEM REQUIREMENTS:
7.1 OPERATING SYSTEM (OS) SPECIFICATIONS:
7.1.1 If applicable, the system’s OS must be Microsoft Windows 10, Windows Server 2012R2, or Red Hat
Linux v6.X. Any OS supplied with the system must contain all service packs, updated patches, and hot fixes. All patching and fixes will be current as of a predefined date agreed upon by the vendor and the Government.
7.1.2 Defense Information System Agency (DISA) Security Technical Implementation Guides (STIGS) are configuration standards for the Department of Defense and contain technical guidance to lock down information systems and software applications that might otherwise be vulnerable to malicious attacks.
The Contractor shall be responsible for ensuring all appropriate STIGs are implemented and their software runs acceptably while secure.
7.1.3 The Army Golden Master (AGM) is a collection of security settings for Microsoft Operating systems which must be applied to all Army computer systems. LEAD will supply the AGM to the Contractor who shall ensure their software functions as intended, when installed on top of the AGM.
7.2 PROGRAMMABLE LOGIC CONTROLLERS (PLC): If a PLC is to be installed within the system, it shall be manufactured by a Government approved source and shall provide an Ethernet adapter to allow for connection to the Industrial Network if required. If an Ethernet connection is used to interconnect the PLC to peripheral equipment, an additional Ethernet port shall be provided.
7.3 SYSTEM SOFTWARE SPECIFICATIONS:
7.3.1 SOFTWARE INSTALLATIONS: If installing application code at LEAD, the Contractor shall install the code within a standard container (E.g., Program Files) and located in a volume separate from the standard System Files. Interactive applications are required to run as services and daemons and any time WEB services are used, file types (E.g., XML and HTML) must be separated.
7.3.2 SOFTWARE LICENSING: When installed, the software licensing for computers, control units and other IT systems will be surrendered to the Information Technology Configuration Manager and will become the property of the Government upon acceptance of the system.
7.3.3 If software has been customized for LEAD’s use or is any software other than Commercial Off The
Shelf (COTS); the Contractor shall provide copies of all source code, firmware and software used in the system, as well as one set of backup and configuration software for PLC’s, control and communication computers, and data acquisition. All programs shall be tested and fully operational before acceptance. All acceptance testing will adhere to common User Acceptance Testing (UAT) standards as defined by the Government.
7.3.4 If any special programming software or programming software interface devices such as hardware
"keys", dongles or "PIC" modules, are required to access software, these programs and devices shall be provided to LEAD along with the necessary registration information. If custom application software was written and provided, a copy of the required compiler and compiler license shall also be provided.
At acceptance, all items shall become property of the Government. Software and hardware purchased for this project shall be registered to Commander, Letterkenny Army Depot, Chambersburg, PA 17201.
7.4 SYSTEM ENVIRONMENT SPECIFICATIONS:
7.4.1 All supplied software must be capable of operating in a multi-user environment and data which contains permissions information shall be hidden from view and inaccessible to those with less than administrator level access. Shared accounts shall not be used, and users shall only be authorized the minimum security rights to operate the application software. Users will not have access to system or software configuration items (e.g., Control Panel, software and hardware installation). Under no circumstances will the intended end user log in using the Administrator or Root account for routine operation of the equipment. The use of these accounts will be restricted to only administrative activities which will be carried out by LEAD Information Technology personnel. All software products shall employ a minimum of three permission based levels of access.
7.4.1.1 ADMINISTRATOR - Full control at root level, restricted to LEAD IT personnel and when required, the Contractor.
7.4.1.2 MAINTENANCE - Mid-level control required to perform maintenance and alter control parameters as needed.
7.4.1.3 OPERATOR - Minimum control necessary to perform the routine operation of software. The Operator shall not be able to alter the programming of software, make changes to executable files, or modify control parameters.
7.4.2 APPLICATION INTEROPERABILITY: If an application will interfere with the operation of the industrial system, E.g., (McAfee Anti-Virus), the Contractor shall provide a written statement to the LEAD IT Directorate explaining the technical restrictions placed upon them.
7.4.3 AUDITING: If applicable, the Contractor shall enable audit files and data logs for access by LEAD
Cybersecurity personnel to audit access and actions on the equipment.
7.4.4 USER ACCEPTANCE TESTING (UAT): LEAD Cyber Security Personnel will have the ability to conduct validation testing with approved security tools prior to equipment being introduced to the shop floor. This testing will also satisfy any UAT requirements. A UAT Plan will be furnished prior to testing and all equipment documentation will be made available for review during the test. If discrepancies are discovered the Contractor shall remediate identified issues prior to Government acceptance.
7.5 DOCUMENTATION REQUIREMENTS:
7.5.1 A complete set of instruction manuals containing all of the information necessary to operate, maintain, and reinstall all software and hardware contained within the system shall be provided by the Contractor. These manuals shall include step-by-step instructions which facilitate the rebuilding of the system in the event of a fatal system crash.
7.5.2 If networked, the Contractor shall provide the system’s network design drawings to the Information
Technology Directorate. These drawings should include complete directional data flow diagrams that include all ports and protocols in use.
7.5.3 The Contractor shall provide to Industrial Automation at least two electronic copies of all control unit programs. These copies should include description files of the ladder logic and any cabling required to connect to the control systems. No control units will be password protected and no other form of lockout measure shall be implemented by anyone other than LEAD IT employees. The Contractor shall also provide electrical wiring diagrams for all installed control systems to this LEAD Industrial Automation group.
7.5.4 Certificate of Networthiness: Certificate of Networthiness (CoN) certification ensures Automated
Information Systems (AIS) utilizing the Army Network are developed in compliance with the Clinger Cohen Act and are secure, supportable, sustainable, and compatible with the Army Enterprise Infrastructure (AEI) (as defined in AR 25-1). All new AIS capabilities and all capability modifications and upgrades must be assessed to validate their Networthiness (network security, network impact, compatibility with the infrastructure, infrastructure requirements, spectrum support, security policy compliance, Joint Technical Architecture –Army (JTA-A) standards compliance, communications and information manpower, training, logistics support, schedule, and funding). If software is installed within the system, the Contractor shall work with LEAD Directorate of Information Management (DOIM) personnel to check for CoN availability and when not available, ensure a CoN is requested and all documentation is submitted.
7.6 PROPOSAL DEVIATIONS:
7.6.1 Proposals or specifications that deviate from those described herein shall be coordinated for specific approval or rejection by the LEAD Information Technology representatives prior to shipment, installation, or acceptance of the equipment.
8. INSTALLATION REQUIREMENTS
8.1 DESIGN AND INSTALLATION: The Contractor shall provide all parts, labor, and services for the design, fabrication, and installation of the CNC Punch and associated equipment. The Contractor shall provide competent English speaking personnel to place the system in operation and to conduct the acceptance tests and training of depot personnel. The Contractor, through his service personnel, shall be fully responsible for the offloading, installation, activation, and testing of the system and the service personnel shall remain until system activation and testing has successfully been completed. Under no circumstances should the Contractor plan on gratuitous Depot assistance for diagnosis, troubleshooting, or repair of the system during installation, activation, and testing.
8.2 SECURITY, SAFETY, AND FIRE PREVENTION: The Contractor shall comply with LEAD P 385-
4, Requirements for Security, Safety, and Fire Prevention for Contractors Performing work on Letterkenny Army Depot.
8.3 BADGES: Identification badges will be issued for admittance of personnel before performing work or service on this contract. The identification badge is the property of the US Government and must be returned upon termination or demand. The Contractor/vendor agrees that he will ensure all badges issued to employees are returned to the Badge and Identification Section, Security Division, Letterkenny Army Depot promptly on termination of need or on expiration, which occurs first. The badge room is located in Bldg 2, phone # 717-267-5301. Hours of operation are 7:30 AM to 3:30 PM, Monday thru Friday, exclusive of Federal Holidays.
8.4 HOURS OF WORK: All work shall be performed between the hours of 7:00 AM and 3:30 PM, Monday Thru Friday, exclusive of Federal Holidays. Other hours, weekend and holiday work will be considered separately as requested by the Contractor with advanced notice and approved by the Contracting Officer.
8.5 FEDERAL HOLIDAYS: The following is a list of Federal Holidays:
Martin Luther King’s Birthday, Presidents Day, Memorial Day, Juneteenth, July 4, Labor Day, Columbus Day, Veterans Day, Thanksgiving, Christmas Day, and New Years Day.
8.6 FIRE EXTINGUISHERS: The LEAD R 385-1 designates the type and number of fire extinguishers required to perform the contracted work. The LEAD Fire Department will not provide any extinguisher support. The Contractor can gain the above information through a pre-construction conference, visiting the fire department, or phone 717-267-7108.
8.7 USE OF PORTABLE GAS OR ARC EQUIPMENT: The Contractor shall obtain a permit, from the
LEAD Fire Department, to use portable gas or arc equipment for cutting, welding or open flame operations. The Fire Department will require one day advance notice to permit necessary inspection before actually starting work, and notification when work is finished to allow for re-inspection. The Fire Department can be notified by calling ext. 717-267-7108. The Contractor shall take necessary precautions to prevent fires IAW NFPA Standard No. 51B and LEAD R 420-13.
8.8 SPILLS: Any spills or releases of materials or wastes must be reported immediately to the site supervisor, the LEAD Fire Department, and the LEAD Environmental Office per the LEAD Installation spill Contingency Plan (ISCP). Any such spills or releases generated by the Contractor shall be contained, cleaned and disposed of by the Contractor per the direction of the LEAD on-scene coordinator.
9. GOVERNMENT RESPONSIBILITIES:
9.1 SITE PREPARATION: Letterkenny Army Depot will provide a clear area for installation of the CNC
Punch.
9.2 UTILITIES: LEAD will provide adequate utilities for the installation and operation of the CNC Punch within 50’ of the equipment disconnect.
9.3 TESTING MATERIALS: LEAD will provide a supply of material for use during the performance tests and training. The material shall include mild steel, aluminum, and other ferrous and non-ferrous materials of varying thicknesses up to and including the maximum recommended capacity of the system.
9.4 DELIVERY AND STORAGE: The Government will not be responsible for accepting, signing for, loading or unloading, or providing covered storage for materials or equipment as part of this contract.
10. CONTRACTOR RESPONSIBILITIES:
10.1 INSTALLATION SCHEDULE: A proposed construction and installation schedule shall be submitted by the Contractor within 60 days after receipt of the purchase order.
10.2 UTILITY REQUIREMENTS: The Contractor shall provide certified utility requirements within 15 days after receipt of the purchase order.
10.3 FIELD VERIFICATION: It shall be the responsibility of the Contractor to verify, in the field, all measurements, locations of structures and utilities, and any other physical conditions which would affect the progress, or quantity of work. Any errors by the Contractor, due to omission of field verification, shall not be the basis for any increase in contract price. Where existing utilities or other obstructions interfere with the progress of the contract, the Contractor shall provide all materials and labor to relocate all obstructions as required and approved by the Contracting Officer.
10.4 SPECIAL FOUNDATION: The Contractor shall be responsible for determining if the equipment requires a special foundation to meet the requirements of this specification. If it is required, the Contractor shall inspect the installation site; prepare certified drawings of the proposed foundation including all calculations. The drawings shall bear the seal and signature of a professional engineer and shall be approved by LEAD prior to any work being performed on the depot.
10.5 CONCRETE TRENCH REPAIR: N/A
10.6…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .