Solicitation signed copy PC W912CH25R0050.pdf

PDF 245 KB Posted

Attached to
Solicitation_Forward Assist Assembly Federal contract opportunity
Solicitation number
W912CH-25-R-0050
Issued by
Department of the Army

About this file

This document is a federal solicitation (RFP) issued by the U.S. Army Contracting Command - Detroit Arsenal for a Firm-Fixed Price, one-time buy of Forward Assist Assembly (NSN: 1005-01-442-0160, Part No. 9349086). The solicitation is a 100% 8(a) Small Business Set-Aside with a total potential quantity of 30,999 units, including a 100% option quantity. The procurement is for a military component related to the M16 rifle series, with a Technical Data Package (TDP) that is export-controlled and requires Joint Certification Program (JCP) certification to access.

Key solicitation details include a proposal submission deadline of August 18, 2025, at 4:00 am, with delivery schedules ranging from 150-210 calendar days after contract award depending on the contract line item. The solicitation requires military packaging at Level B and includes special packaging instructions. Potential offerors must be registered in the System for Award Management (SAM), have a valid 8(a) certification, and comply with specific export control and small business subcontracting requirements. The procurement is specifically for manufacturing small arms components, using NAICS code 332944 with a small business size standard of 1,000 employees.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W912CH-25-R-0050

X

2025AUG18

2025SEP1704:00am

DOA5

2025AUG18 SEE SCHEDULE

W912CH

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

PAMELA CUNHA

(520)942-7019

CCTA

PAMELA.CUNHA.CIV@ARMY.MIL

1 74

X 1

X 5 X 12

X 15 X 17 X 20

X 26

X 28

X 52

X 53

X 66

X 72

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: PAMELA CUNHA

Buyer Office Symbol/Telephone Number: CCTA/(520)942-7019

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Rifle, 5.56mm, M16 Series w/Bipod, Firin

*** End of Narrative A0000 ***

A.1 DESCRIPTION OF THE ACTION

A.1.1 This solicitation is intended to result in the award of a single one-time buy with 100% option Firm-Fixed Price (FFP) contract for the procurement of National Stock Number (NSN) 1005-01-442-0160 Forward Assist Assembly.

A.1.2 This solicitation is set aside for 8(a) Businesses per IAW FAR Clause 52.219-17.

A.1.3 There is a Technical Data Package (TDP) associated with this procurement. The TDP is distribution code F", which limits access to

U.S. Government agencies and its contractors. The TDP is marked with Distribution Statement F, which limits distribution only as directed by Rusty Brown, Configuration Management Officer, Small Caliber Systems Branch, Configuration Management Division, FCDD-ACE-

SCS, Rock Island Arsenal, DSN 323-713-9272, Russell.s.brown7.civ@army.mil or higher DoD authority. Rusty Brown, Configuration Management

Officer, Small Caliber Systems Branch, Configuration Management Division, FCDD-ACE-SCS, Rock Island Arsenal, DSN 323-713-9272, Russell.s.brown7.civ@army.mil or higher authority must be consulted before the material can be distributed. Please refer to Section C.1 for additional information.

A.1.4 The Government will utilize North American Industry Classification System (NAICS) code 332944 Small Arms, Ordnance, and Ordnance

Accessories Manufacturing for this procurement. [This NAICS code will also be assigned to any subsequently awarded delivery orders for the resulting contract.]

A.1.5 Failure to register in the System for Award Management (SAM) for the corresponding NAICS code identified in paragraph A.1.4 prior to submitting a proposal for this solicitation may preclude an award made to your company. Offerors should be award of how U.S. Small

Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) part 219, and 13 CFR 121

Small Business Size Regulations. Offerors are advised to review 13 CFR 121.103 How does SBA determine affiliation, if applicable to this solicitation. All proposals received in response to this solicitation shall remain valid for a minimum of 120 calendar days.

A.1.6 Offerors shall follow Section L for Instructions, Conditions, and Notices to Offerors for proposal submission and Section M for

Evaluation Factors

A.2 Electronic Contracting

A.2.1 All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website

(https://www.SAM.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, are embedded in the solicitation as separate attachments or links.

A.2.2 Please pay close attention to the Issued By block location on the cover page of the solicitation closing date/time. The solicitation closing date/time is based on the local time of the location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting any proposal, modification or revision/amendment, so as to be received by the Government office designated in the solicitation by the time specified.

A.2.3 It is the responsibility of the offeror to ensure any proposal, modification, or revision/amendment is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208(b), if any proposal, modification, or revision/amendment was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal, modification, or revision/amendment is defined to mean ALL volumes or parts required in the solicitation and included in the electronic submission.

Note: Any proposal, modification, or revision/amendment size and content may impact the time it takes for submission. Therefore, offerors are strongly cautioned that adequate time should be allowed when submitting any proposal, modification, or revision/amendment.

A.2.4 Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, offerors will no longer be able to submit electronic responses.

A.2.5 Any award issued as a result of this solicitation will be distributed electronically. In the event of a Freedom of Information Act

(FOIA) (5 USC 'a7 552) request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released. In addition, in accordance with Executive Order 12600 (June 23, 1987), please

2 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

be advised it is the Governments intention to also release the unit price(s) in response to any request under FOIA. Unit price is defined as the contract price per unit, or item purchased as it appears in Section B of the contract. Unit price does NOT refer to, nor does it include Cost or Pricing data or information. If an offeror objects to the release of the unit price(s) in the contract or contract modifications in the event of a FOIA request, the offeror must notify the Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection, consistent with the provisions of FOIA. A release determination will be made in accordance with FOIA based on the rationale provided.

A.2.6 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the APEX

(formerly Procurement Technical Assistance Center (PTAC)) website at http://www.miapex.org/ to locate a regional center.

A.3 ACKNOWLEDGEMENT OF AMENDMENTS

A.3.1 Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

A.4 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/ombudsperson .

(Best viewed using Google Chrome or Microsoft Edge)

A.5 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

A.5.1 This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act

(Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

A.5.2 To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily

Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's

Section C Technical Data Package instructions.

A.5.3 Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

A.5.4 Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the

TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

A.6 ALL OR NONE

A.6.1 Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

A.6.1.1 ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

A.6.1.2 OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.

A.7 Questions and Answers

A.7.1 Contractors may submit questions regarding this solicitation up until 13 June 2025. Please submit all questions to pamela.cunha.civ@army.mil. Any late questions may not be addressed by the Government.

3 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE A0001 ***

4 74

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 FORWARD ASSIST ASSE

NSN: 1005-01-442-0160

Mfr CAGE: 19200

Mfr Part Number: 9349086

0001AA FORWARD ASSIST ASSEMBLY 30999 EA $ $ _______________________ ______________ __________________

COMMODITY NAME: FORWARD ASSIST ASSE

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH4C0671EH PRON AMD: 02

AMS CD: SM2B1100000

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 9349086:19200

DATE: 29-MAY-2024

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENTS LISTED IN SECTION D

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W52H094108021V W562RP J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 30,999 0210

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

5 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 FORWARD ASSIST ASSE

NSN: 1005-01-442-0160

Mfr CAGE: 19200

Mfr Part Number: 9349086

0002AA UNEXERCISED OPTION QUANTITY 30999 EA $ $ ___________________________ ______________ __________________

COMMODITY NAME: FORWARD ASSIST ASSE

PRON: EH4C0671EH PRON AMD: 02

AMS CD: SM2B1100000

OPTION QUANTITY, PURSUANT TO FAR CLAUSE 52.217-7,

OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED

LINE ITEM.

The quantity stated for the option CLIN DOES NOT form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.

The failure of the offeror to insert a unit price applicable to the option quantity must mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offeror will be evaluated for award accordingly.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENTS LISTED

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W52H094108021V W562RP J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 30,999 0180

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

6 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ANNISTON,AL,36201-4199

7 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003 FORWARD ASSIST ASSEMBLY

0003AA FIRST ARTICLE TEST REPORT 1 LO $ _________________________ __________________

SERVICE REQUESTED: FORWARD ASSIST ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

A First Article Test Report is required in accordance with the clause entitled First Article Approval

Contractor Testing, 52.209-3, and section E.4, (End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0150

0100 CONTRACT DATA REQUIREMENTS LIST _______________________________

A001 CDRL A001 EGNINEERING CHANGE PROPOSAL 1 LO $ ** NSP ** _____________________________________ __________________

SERVICE REQUESTED: EXHIBIT A

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423, A001

Engineering Change Proposal (ECP).

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

8 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A002 CDRL A002 REQUEST FOR VARIANCE (RFV) 1 LO $ ** NSP ** ____________________________________ __________________

SERVICE REQUESTED: EXHIBIT A

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423, A002 Request for Variance (RFV).

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A003 CDRL A003 NOTICE OF REVISION (NOR) 1 LO $ ** NSP ** __________________________________ __________________

SERVICE REQUESTED: EXHIBIT A

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423, A003 Notice of Revision (NOR).

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A004 CDRL A004 ACCEPTANCE INSPECTION EQUIPMENT (AIE) _______________________________________________

REPORT 1 LO $ ** NSP ** ______ __________________

9 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SERVICE REQUESTED: EXHIBIT A

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423, A004

Acceptance Inspection Equipment Report.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A005 CDRL A005 TEST PROCEDURE HEAVY PHOSPHATE COATING 1 LO $ ** NSP ** ________________________________________________ __________________

SERVICE REQUESTED: EXHIBIT A

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423, A005 Test

Procedure Heavy Phosphate Coating.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A006 CDRL A006 CERTIFICATE OF COMPLIANCE 1 LO $ ** NSP ** ___________________________________ __________________

SERVICE REQUESTED: EXHIBIT A

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare and deliver data

10 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423, A006

Certificate of Compliance.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A007 CDRL A007 CERTIFICATE OF COMPLIANCE 1 LO $ ** NSP ** ___________________________________ __________________

SERVICE REQUESTED: TARP

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423, A007

Certificate of Compliance.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

11 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 TECHNICAL DATA PACKAGE INFORMATION

C.1.1 The following Xd item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov ) associated with this solicitation number:

W912CH-25-R-0050

C.1.2 To access the data through SAM:

C.1.2.1 Log on to the SAM web site: HYPERLINK "https://SAM.gov"https://SAM.gov.

C.1.2.2 Search for the solicitation number.

C.1.2.3 Click on the attachment you would like to view.

C.1.2.4 If the attachment is restricted, request access to the document.

C.1.2.4.1 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C. Sec 2751, et.

seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App 2401 et. seq. (Section 2751 of Title 22, United States

Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).

C.1.2.4.2 Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its

Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level

C.1.2.4.3 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with

Defense Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.

C.1.2.4.4 Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

C.1.2.5 If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract

Specialist and Contracting Officer at Army Contract Command Detroit Arsenal (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.

C.1.2.6 If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

C.1.2.7 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and

Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.

12 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.2 CONFIGURATION MANAGEMENT DOCUMENTATION

C.2.1 The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

C.2.2 The Configuration Change Management section of SAE EIA-649-1 (current revision) Configuration Management Requirement for Defense

Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); and the second sentence of paragraph 3.3.1.8.1(1).

C.2.3 Furnished item(s) shall conform to the approved configuration requirements/revision unless an RFV is processed and approved as provided by Paragraph e. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

C.2.4 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1

(current revision) and should be referred to Section I Clause 52.248-1 VALUE ENGINEERING. C.2.5 All ECPs submitted will be deemed routine. The Contractor must include justification for an ECP it considers emergency or urgent in the submittal and include all supporting documentation.

C.2.6 For ECPs, RFVs, and NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/NOR without processing.

C.2.6.1 for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001 Engineering Change Proposal.

C.2.6.2 for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002 Request for Variance

C.2.6.3 for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003 Notice of Revision.

C.2.7 The Governments acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Governments sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

C.2.8 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO), copy to the Administrative Contracting Officer (ACO).

C.2.9 The submission of an ECP/RFV/NOR does not affect the required delivery date of the contract.

C.3 CONTRACTOR EMPLOYEES WHO REQUIRE ACCESS TO GOVERNMENT INFORMATION SYSTEMS

All contractor employees shall be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services and must successfully complete the DoD Information Assurance Awareness training prior to access to the information system, and annually thereafter.

C.4 ARMY INFORMATION SYSTEM (IS) SECURITY REQUIREMENT

CONTRACTOR INVESTIGATION/CLEARANCE. Reference AR25-2, AR 380-67, DoD 5200.2-R and Final Credentialing Standards for Issuing Personal

Identity Verification Cards under HSPD-12 (31 Jul 2008). All contractors and consultants that access government owned or operated automated information systems, networks, or databases and to safeguard controlled unclassified information shall have a favorable background investigation as required above references positions designated as IT-I, IT-II or IT-III to perform functions stipulated in contract scope of work. The minimum investigative requirements are as follows: ADP-I (AKA: IT-1 or Privileged Access) = Tier 5 (T5)

13 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

/Tier 5 Reinvestigation (T5R)(AKA: Single Scope Background Investigation (SSBI), Single Scope Periodic Reinvestigation (SSPR) or Phased

Period Reinvestigation (PPR)); ADP-II (AKA: IT-2 or Limited Privileged Access) = Tier 3 (T3) / Tier 3 Reinvestigation (T3R)(AKA : Access

National Agency Check with Written Inquiries and Credit Check (ANACI) or National Agency Check with Law and Credit Check (NACLC)); or

ADP-III (AKA: IT-3 or (Non-Privileged Access) = Tier 1 (T1) / Tier 2 with Subject Interview (T2S) or Tier 2 Reinvestigation with Subject

Interview (T2RS) (AKA: National Agency Check with Inquiries (NACI)). A Common Access Card (CAC) may be issued on an interim basis based on favorable T1 or a Federal Bureau of Investigation (FBI) National Criminal History Check (fingerprint check) adjudicated by appropriate approved automated procedures or by a trained security or human resource (HR) specialist, and successful submission to the investigative service provider (ISP) of a T1 investigation or an investigation greater in scope than a T1. Investigations will be coordinated with the G2, TACOM LCMC (AMSTA-CSS / 586-282-6262) and investigations will be through the Personnel Security Investigations

Portal Center of Excellence (PSIP COE). Non-U.S. citizens shall be Permanent Resident Aliens with requisite investigation. All personnel shall receive and certify to an Information Systems Security Briefing.

C.5 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN

(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government

OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.

(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is

OPSEC Level I.

C.6 OPSEC TRAINING REQUIREMENT

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

https://securityawareness.usalearning.gov/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer's Representative (COR), if assigned to the contract, or the Procuring

Contracting Officer (PCO).

C.7 THREAT AWARENESS REPORTING PROGRAM

(a) All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counter

Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and

Reporting Program (TARP). The in-person training is the preferred method and is available by contacting the local CI Office to arrange for the conduct of training.

(b) The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete

Contractor shall provide certificates/proof of completion of training to the Contracting Officer's Representative (COR), if assigned to the contract, or to the Procurement Contracting Officer (PCO) within (10) days of completion.

(c) The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b).In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management

System (ALMS) at: www.lms.army.mil.

*** END OF NARRATIVE C0001 ***

14 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D.1. Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the TDP.

PRESERVATION: MILITARY

LEVEL OF PACKING: B

QUANTITY PER UNIT PACKAGE: 001

SPI NUMBER 9349086, DATED15 JUL 14, REV B

D.2 Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

D.3. Marking: In addition to any special markings called out on the SPI;

D.3.1. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause

252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide and Supplier Implementation Plan.

If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.

D.4. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

D.5 This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the

SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 calendar days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 calendar days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

D.6 Hazardous Materials (as applicable):

D.6.1 Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

D.6.2 Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:

International Air Transport Association (IATA) Dangerous Goods Regulations

International Maritime Dangerous Goods Code (IMDG)

Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

Joint Service Regulation AFMAN24-604/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).

15 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

D.6.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

D.6.4 When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

SUPPLEMENTAL INSTRUCTIONS: N/A

*** END OF NARRATIVE D0001 ***

16 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

Title Number Date Tailoring Quality Management Systems_____________________________________________________________________

ISO 9001:2015 21 OCT 2025 Tailored by excluding paragraph 8.3

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.1 Inspection and Acceptance: Origin

E.1.1 The Government's inspection of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility, or subcontractor's facility, where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: ORIGIN

a. NAME

b. CAGE

c. ADDRESS, CITY, STATE, ZIP

ACCEPTANCE POINT: ORIGIN

a. NAME

b. CAGE

c. ADDRESS, CITY, STATE, ZIP

FIRST ARTICLE TEST REPORT (FATR) ACCEPTANCE: DESTINATION

The Government's acceptance of the First Article Test Report (if required) offered under this order shall take place at DESTINATION.

E.2 Rework and Repair

E.2.1 Rework and Repair are defined as follows:

E.2.1.1 Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

E.2.1.2 Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

E.2.2 Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the

Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

E.2.3 Repair procedures shall be documented by the Contractor and submitted on a Request for Variance, DD Form 1694, to the Contracting

17 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Officer for review and written approval prior to implementation.

E.2.4 Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

E.2.5 The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data

Package requirements and shall in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

E.3 Acceptance Inspection Equipment (AIE)

E.3.1 The contractor shall use a calibration system with traceability to a national or international standard for the AIE used on this contract.

E.3.2 The contractor shall provide all AIE (except for any AIE listed as available in Section H or Appendix I) necessary to assure conformance of material to the contract requirements.

E.3.3 AIE shall be available for use on the First Article (FA) submission, if FA is required, or prior to use for acceptance of production material on this contract.

E.3.4 Contractor furnished AIE shall be made (i) to the AIE designs specified in Section C, or (ii) to any other design provided the contractor's proposed AIE design is approved by the Government. Contractor's proposed AIE design for inspection of characteristics listed as "Critical, Special or Major" shall be submitted to the Government for review and approval as directed on the Contract Data

Requirements List, DD Form 1423. Government approval of AIE design shall not be considered to modify the contract requirements.

E.3.5. When the contractor submits its proposed AIE on commercial off the shelf equipment, the contractor shall include the manufacturer's name and model number, and sufficient information to show capability of the proposed AIE to perform the inspection required. When submitting proposed AIE design documentation on commercial computer controlled test and measuring equipment include information on (1) test program listing (2) flowcharts showing accept and reject limits and computer generated test stimuli (3) calibration program listing (4) sample of the printout of an actual test and calibration (5) test plan to verify accuracy of inspection and correctness of accept or reject decision (6) identification of the equipment by model name and number.

E.3.6 Resubmission of the contractor's proposed AIE design for Government approval on a follow on Government contract is not required, provided the inspection characteristic parameters specified in the technical data package and the previously Government approved AIE designs have not changed. In this situation, the contractor shall provide written correspondence in the place of the AIE designs that indicates the prior Government approval and states that no changes have occurred.

E.3.7 The Government reserves the right to disapprove, at any time during the performance of this contract, any AIE that is not accomplishing its intended use in verifying an inspection or test characteristic.

E.3.8 If the contractor changes the design after the initial approval, the modified design must be submitted for approval prior to use.

E.4 First Article Test (FAT) (Contractor Testing)

E.4.1 The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality

Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

E.4.2 The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

E.4.3 The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

E.4.3.1 Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

E.4.3.2 Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

E.4.3.3 Corrosion resistance tests over 10 calendar days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 calendar days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.

E.4.3.4 Life cycle tests over 10 calendar days in length provided that the same or similar items manufactured using the same processes

18 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.

E.4.3.5 Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.

E.4.4 Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

E.4.5. A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to USARMY RIA CCDC AC Mailbox RDAR-QEP: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil.

E.4.6. Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .