Sole Source_Crew Mess Air Handler Replacement_Redacted.pdf

PDF 160 KB Posted

Attached to
USNS HUMPHREY AIR HANDLER UNIT-SOLE SOURCE Federal contract opportunity
Solicitation number
N3220523Q2205
Issued by
Department of the Navy Military Sealift Command

About this file

This memorandum documents a sole source justification for an acquisition under the simplified acquisition threshold. The U.S. Navy seeks to replace the crew mess air handler on one T-AO 187 Kaiser Class vessel with a unit manufactured by DRS Marlo Coil Company. The required unit matches proprietary drawings owned by DRS Marlo Coil Company. All fifteen Kaiser Class vessels currently use the same make and model of air handler. The justification cites standardization and brand name as reasons for restricting competition. Delivery is required by March 18, 2024. The associated solicitation seeks the air handler unit from DRS Marlo Coil Company on a sole source basis for an urgent repair.

View the file

Other files for this federal contract opportunity

Other files attached to USNS HUMPHREY AIR HANDLER UNIT-SOLE SOURCE, newest first.
File Type Posted
USNS HUMPHREY AIR HANDLER Q2205 SOLICITATION.pdf PDF
USNS HUMPHREY AIR HANDLER Q2205 SOLICITATION.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Ver 2.0 (01 July 2018)

Date: July 13, 2023

MEMORANDUM

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER

THE SIMPLIFIED ACQUISITION THRESHOLD

Ref: (a) PR Number(s): N2141931724159 / 1301094441

I. BACKGROUND:

1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

1. Provide a description of the item or service required, to include

a) The name of the required source or brand name:

DRS Marlo Coil Company.

b) The required delivery date/period of performance and RDD is 03/18/2024

c) Its intended use.

AFT Crew's Mess Air Handler Replacement.

2. List the source(s) or known vendor(s) who are able to provide the above described item or service.

DRS Marlo Coil Company.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. X Only one responsible source (select all that apply):

1. X RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

Proprietary rights on manufacturing drawing DWG #1043-00-C

b. If drawings are included, who is identified as “owning” the drawings.

DWG #1043-00-C DRS Marlo Coil Company

2 Ver 2.0 (01 July 2018)

2. X EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

DRS Marlo Coil Company is the original equipment manufacturer of this equipment, built from proprietary drawings that cannot be published publically.

b. Identify the distributor / authorized technical representative for the item or service.

Provide evidence of the exclusive licensing agreement as an attachment to this document.

(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)

3. X OTHER REASON:

a. _____ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number: ___________________________

b. X STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.

i. Identify Make / Model Number(s): FSL-301043-00-C

ii. Identify other vessels with this Make / Model:

All 15 T-AO 187 Kaiser Class vessels.

c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

ii. Describe how the equipment must be compatible with the existing configuration.

d. __ OTHER:

3 Ver 2.0 (01 July 2018)

4. UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified:

b. Required delivery date / Period of Performance:

c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.

d. Estimated production lead time:

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)

f. CASREP Number:

IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT:

V. CERTIFICATIONS AND APPROVALS:

Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

File details come from the government source that posted it. Updated .