This scope of work document outlines requirements for supplies to support rehabilitation efforts at El Morro grounds within San Juan National Historic Site in Puerto Rico. The National Park Service seeks to procure approximately 10,000 cubic yards of soil mix containing 80% sand and 20% organic matter for depressions and re-grading, 2,500 cubic yards of sand for topdressing, and 92,500 square feet of sod for reinforcing weak and road areas. Detailed specifications are provided for the required soil and sod materials. The purpose of the rehabilitation work is to support the parks mission of protecting, preserving, and interpreting natural, cultural, and historical resources for public benefit and education.

View the file

Other files for this federal contract opportunity

Other files attached to MATERIALS FOR REHAB EL MORRO GROUNDS, newest first.
File Type Posted
Sol_140P5421R0038_Attach__002-_Core_Sample_Testing_Results.pdf PDF
Sol_140P5421R0038.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAN JUAN NATIONAL HISTORIC SITE

OLD SAN JUAN, PUERTO RICO

Scope of Work

SUPPLIES FOR REHABILITATION OF EL MORRO

GROUNDS

PMIS 312849

NATIONAL PARK SERVICE

SOUTHEAST REGION

SOUTH MAJOR ACQUISITION BUYING OFFICE

1. Background:

San Juan National Historic Site is one of the over 400 parks of the National Park Service. It includes Castillo San Felipe del Morro, Castillo San Cristóbal, most of the city walls, the San Juan Gate and Fort San Juan de la Cruz just across the entrance to the bay. The parks mission is to protect, preserve, and interpret the natural, cultural, and historical resources for the benefit and inspiration of present and future generations. There are over 1.5 million visitors annually.

2. Required Services:

The San Juan National Historic Site (SAJU) is going to procure topsoil, sand, and sod for the restoration of the El Morro grounds. The purchase is going to consist of:

10,000 Cubic Yards of Soil Mix – For Depressions and Re-grading 2,500 Cubic Yards of Sand – For topdressing 92,500 Square Feet of Sod – For fixing “weak” and “road” areas

3. Detailed requirements and specifications:

Soils:

Use a mix with 80% sand and 20% organic matter. The mix should not contain more than <5% fine gravel and <10% silt + clay or 2-5% very fine sand, 2-5% silt, 2-5% clay.

All soil and sand provided shall meet U.S. Golf Association (USGA) and International Sports Turf Research Center (ISTRC) guidelines.

All soil and sand shall meet the expanded ISTRC guidelines in the SAJU ISTRC System Report, dated July 31, 2018, Lab ID 18060060.

Soil to contain enough available nitrogen, phosphorus, potassium, calcium, and magnesium to support normal plant growth. In the event of nutrient inadequacies, provisions shall be made to add required materials to overcome inadequacies prior to planting.

Soils amendments shall be added per the soil tests provided.

The contractor shall furnish all materials, labor, equipment required to supply materials described herein in strict accordance with the terms of the contract.

Soil shall not have a mixture of subsoil and shall contain no slag, cinders, stones, lumps of soil, sticks, roots, trash or other extraneous materials larger than 1.5 inches (40 mm) in diameter.

Soil must also be free of viable plants or plant parts of common bermudagrass, quackgrass, johnsongrass, nutsedge, poison ivy, Canada thistle, or others as may be specified.

All soil shall be well mixed prior to delivery. No soil characteristics shall show greater than 5% variability.

All soil shall be tested by a reputable laboratory for pH and soluble salts.

If needed, pH correction material shall be applied at a rate sufficient to correct the pH to a range of 6.0 to 7.0.

Soluble salts shall not be higher than 500 parts per million

Table 1. Soil and Sand Recommendations

Material Use Characteristics and Application Tips

Soil All When soil modification is not needed the existing soil or one similar in texture can be used. Pull cores, allow cores to dry on the surface and then drag to have soil fill in aeration holes.

Sand L,C,P

Sand: Use 100% sand should be angular or medium coarse.

Make sure the sand source will be available for future use.

Soil Mix: Use a mix with 80% sand and 20% organic matter. The mix should not contain more than <51% fine gravel (Concrete Sand) and <10% silt + clay or 2-5% very fine sand, 2-5% silt, 2- 5% clay.

After applying the topdressing material, first pull the drag mat making small circles then in large ovals so the material can filter into the aeration holes and also provide a level field.

Compost All Shall be mature, screened, have a fine particle size, be within the pH range of 6.5-8.0 and have a low salt content. Compost should be tested. Apply no more than ¼ inch per application.

Crumb Rubber

Shall have a small particle size: 0.05-2.0 mm. Apply at a ¼ inch depth per application until a cumulative depth of ¾ -1 inch depth is achieved over time. This material is expensive.

Uses:

L: to level minor depressions T: to reduce thatch C: to reduce hard compacted soils (following a cultivation practice) P: to improve aeration and drainage S: to improve seedbed for overseeding

Sod:

Turfgrass sod shall be commercially grown Zoysia Manila grass meeting the Turfgrass Producers International (TPI) 1995 Guideline Specifications for Turfgrass Sodding (revised 2006) (GSS).

The minimum quality grade for turfgrass sod shall be, quote mark commercial grade, as defined in the TPI GSS. In addition to commercial grade requirements, the Zoysia Manila grass sod shall:

a. contain no disease or insects; and

b. have a thickness of attached soil layer of 3/4 inch to 1 inch thick classified as ML (silt) or CL (lean clay) according to USCS/ASTM D 2487; and

c. have an overall total sod thickness of 1-3/4 inch to 2 inches thick; and

d. have no weeds and/or patches of foreign grasses exceeding 5% of each sq. yd.

of sod verified through digital analysis and/or field inspection before cutting; and

e. have a minimum 90% soil coverage for each sq. yd. of Zoysia Manila grass sod.

Zoysia Manila grass sod shall be supplied in rolls or on pallets as slabs.

Zoysia Manila grass sod shall be delivered to a designated destination in San Juan, Puerto Rico within 24 hours of cutting and meet all state and Federal regulations governing shipment.

Sod farmers must have the capability of providing a minimum of 4,000 sq yds per month of Zoysia Manila grass sod detailed below within a continuous 12-month period during one growing season (minimum of 200,000 sq yds). The Government will be installing this sod at El Morro mostly within the 2021 time period.

Zoysia Manila grass sod farms shall provide responses to the following:

a. Number of acres of Zoysia Manila grass sod and soil meeting the above requirements currently grown and/or could be available for this project in 4 months during the growing season.

b. Maximum number of acres available for growing Zoysia Manila grass sod meeting this Sources Sought.

c. Maximum sq. yds. of Zoysia Manila grass sod that can be delivered per month.

4. Contractor Responsibilities:

a. Interested offerors are highly encouraged to make a site visit.

b. Contractor is required to submit product and equipment specifications to the project designer and the park to the complexity and sensitivity of the cultural resource and area.

c. Contractor will deliver all materials and equipment to the site. Larger equipment will be parked in the closest area possible.

d. Contractor must contact Maintenance Department personnel to schedule delivery and operations of the project. Contractor must be ready to make the deliveries in consecutive days or weeks. Deliveries must be coordinated with the, Facility Manager or designated COR.

e. After delivery and product inspection and approval, the Contractor must submit an invoice for the partial deliveries or the complete amount of the purchase order.

f. Contractor must leave site in good condition, and in the same condition as found.

g. Contractor must comply with local, state and federal environmental regulations.

h. Contractor must make sure that the driver and operator of the vehicles has proper licenses and certifications provided by Commonwealth of Puerto Rico.

i. Contractor must provide training and all personal protective equipment for its employees including fall protection equipment due to the slope of the hill.

j. Contractor must follow all traffic rules when operating a vehicle inside of the Park’s premises and within Old San Juan.

k. Contractor’s truck must be in good condition. It cannot have any oil leaks when entering Federal premises.

l. Contractor shall specify all components, quantities, unit prices, and total price, and explain the purpose of each component.

m. Contractor shall perform all work in accordance with all prevailing local, state and federal codes, and any local or national ordinances or regulations.

n. The COR shall inspect the delivered goods. A contractor's authorized signature may be required.

o. Delivery should be based on ground only. NO DOCK at site. Delivery companies assume the responsibility to provide the unloading of products from truck. Quoted prices should include this consideration of the specified requirements.

p. Contractor shall submit copies of permits for delivery of materials.

q. Contractor shall submit soil samples and test results for:

i. Each topsoil source.

ii. Each location submission shall include:

1. 1 qt. representative sample in airtight container.

2. Field testing and analysis by a qualified soils laboratory made in accordance with ISTRC Guidebook.

3. Test shall include available nutrients, soil pH, soil texture, salt, and percentage organic matter, and recommended fertilization and amendment rates for plant material types specified.

4. Location of borrow site, if applicable.

iii. Deliver copies of all test reports and samples to COR

5. Government Furnished Property, Materials & Supplies:

N/A

6. Business Hours:

The contractor shall complete on-site work during normal business hours of 6:30 am to 3:00 pm, Monday through Friday, excluding Federal holidays or Government shutdown. The contractor shall coordinate specific on-site work schedule with the Contracting Officer and Contracting Officer Representative (COR) five days prior to performance start date. While on site, the COR may be reached by mobile phone during normal business hours. Work shall be completed within 365 days after Contracting Officer issues notice to proceed. Any work outside of normal business hours shall be pre-approved by the Contracting Officer and COR.

7. Motor Vehicle & Traffic Regulations:

Contractor employees operating motor vehicles shall possess a valid driver's license.

Driver and vehicle permit, licenses, registrations and proof of insurance shall always be maintained in the vehicle and made available upon request. Contractor employees shall always comply with federal vehicle motor law requiring seat belts be worn.

Contractor employees shall adhere to the posted speed limits.

8. Employee Badges/Parking:

All contractor employees shall comply with parking procedures published for the Park.

Contractor employees shall return any PARK issued personal or vehicle identification badges immediately upon termination of employment or completion of this contract.

9. Construction Impact:

Protect surrounding areas from debris generated by works being performed.

Contractor will be held responsible to maintain a clean and safe work environment.

Staging is limited to area near the work area. All staging areas shall be returned to pre-construction conditions once section of railing is completed.

All works to be performed at the site will be conducted during the hours of 6:30am and 3:00pm

10. Performance Requirements Summary (PRS):

Contractor performance requirements are summarized into required services that relates directly to successful contract completion. The performance standard identifies the minimum acceptable levels of service allowed.

PRS

Section Required Service

Standard Monitoring

Method Incentive/Disincentive

Soil Mix For Filling

Depressions and Re-grading with

100% Compliance

Random Inspection

Performance Evaluation

Sand for Top

Dressing 100%

Compliance Random

Inspection Performance Evaluation

Sod for repairing “weak” areas and rehabilitating

“Road” areas

100% Compliance

Random Inspection

Performance Evaluation

11. Safety:

San Juan National Park Service personnel will comply with all NPS and OSHA rules and regulation. Contractor employees will be provided all necessary safety equipment to perform tasks by Contractor.

Construction zone shall be fenced with Contracting Officer approved construction barrier fencing, metal portable fencing, before any construction activity. The fencing shall define the construction zone and confine activity to the minimum area required for construction.

Workers will be instructed to avoid conducting activities beyond the construction zone as defined by construction zone fencing. Contractor is to follow at a minimum all OHSA rules and procedures. A required safety plan must be submitted and approved before any work is to begin. This plan shall identify any hazards related to the work and provide measures to follow to mitigate risk.

12. Quality Control:

The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure the work performed conforms to the contract requirements. The Performance Requirements Summary establishes performance standards that are the minimum requirements for acceptable performance of required services. The contractor’s QCP shall address methods for remedying poor performance. The Contractor shall develop QCP and submit with proposal package. The Contractor’s QCP includes:

Contractor’s surveillance methodology

13. Quality Assurance.

The COR will monitor the contractor’s performance under this contract using quality assurance procedures. Quality Assurance ensures reliable and continued operation by precluding unnecessary complaints and unacceptable performance.

Government’s Quality Assurance includes:

Acceptance of the contractor’s quality control system Random inspection of the contractor’s work Communicating customer complaints Progress meetings with the contractor

The implementation of government’s quality assurance does not relieve the contractor of its responsibility to implement and abide by the Quality Control system incorporated into this contract. Contractor is responsible to provide acceptable performance of all required services listed herein.

14. Contractor’s Proposal Package.

The following deliverables are to be submitted with offer in response to RFQ.

Technical approach to perform required supplies and incidental delivery services.

15. Inspection:

The Government will conduct inspection upon completion of required delivery of supplies. Final payment will be processed upon confirming that all noted contractor performance deficiencies have been satisfactorily corrected.

All materials will be inspected upon delivery. The contractor shall be responsible for hauling and disposal of all rejected deliveries at their own expense.

16. Electronic Submittals:

Identify and incorporate information in each electronic submittal file as follows:

1. Transmittal Form: All submittals shall be transmitted using National Park Service form CM-16, which can be obtained from Contracting Officer.

2. Physical Samples: Deliver physical samples to the Contracting Officer (or designee) on site for processing.

Processing Time:

Allow enough time for submittal review, including time for re-submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including re-submittals.

1. Action Submittal: Allow 15 days for initial review, including time for re-submittal.

Allow additional time if coordination with subsequent submittal is required.

2. Informational Submittals: Allow 10 days for review of each submittal.

16. Contracting Officer’s Review:

Action Submittal:

Contracting Officer will review each submittal, generate comments on correction or modification required, and indicate the appropriate actions on the transmittal form. The submittal will be marked in one of the three ways as defined below:

1. Approved: Acceptable with no corrections.

2. Approved with notation: Minor corrections or clarifications required. All comments are clear, and no further review is required. Contractor shall address all review comments when proceeding with work.

3. Disapproved-Resubmit: Rejected as not in accordance with the contract or as requiring major correction or clarification. The Contracting Officer will identify the reasons for disapproval. Contractor shall revise and resubmit with changes clearly identified.

Informational Submittal:

Contracting Officer Representative (COR) will review each submittal and will either accept or reject them.