This document is a solicitation for Mills Ware Yard Pavement Repairs. The Bureau of Land Management Wyoming Region is seeking offers for furnishing all labor, equipment, and materials to crack seal, mill, and pave locations shown on the project drawings at the Mills Ware yard in Mills, Wyoming. Offerors must provide pricing for bid items listed in the Bid Schedule. The period of performance is from August 2, 2021 to November 30, 2021. This is a 100% small business set-aside and offers are due by July 27, 2021. The award will be a firm-fixed price contract determined using lowest price technically acceptable procedures.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L6221R0012_Amd_0002.pdf | ||
| Wareyard_BidSchedule_AMD_0003_0002.xlsx | XLSX spreadsheet | |
| DRAWING_Mills_Paving_0002.pdf | ||
| 140L6221R0012_QUESTION_AND_ANSWER_AMD_0003_0002.docx | DOCX document | |
| Sol_140L6221R0012_Amd_0001.pdf | ||
| Bid_Schedule_Revised_0001.xlsx | XLSX spreadsheet | |
| Questions_Addressed_0001.docx | DOCX document | |
| Specifications_Revised_0001.docx | DOCX document | |
| Ware_Yard_Bid_Schedule.xlsx | XLSX spreadsheet | |
| Statement_of_Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040528835
BLM WY-STATE OFC BUS MGMT BR(WY951)
5353 YELLOWSTONE RD.
CHEYENNE WY 82009
LYA
BLM - WYOMING STATE OFFICE
5353 YELLOWSTONE ROAD
CHEYENNE WY 82009
ATTTN: KELLY PALMER
Kelly Palmer (307) 7756057
1x 06/23/2021
140L6221R0012
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
MILLS WARE YARD PAVEMENT REPAIRS
100% SMALL BUSINESS SET ASIDE
NAIC: 237990
STANDARD SIZE: $39.50
MAGNITUDE: BETWEEN $250,000 AND $500,000
FIRM FIXED PRICE
ALL WORK WILL BE ACCOMPLISHED PER THE SPECIFICATION/STATMENT OF WORK;
Furnishing all labor, equipment, and materials, to crack seal, mill, and pave at the locations as shown on the drawings for the BLM High Plains District at the Mills
Ware yard located in Mills, Wyoming.
1. ALL QUESTIONS MUST BE EMAILED TO THE CONTRACTING OFFICER, AND MUST INCLUDE THE
SOLICITATION NUMBER AND TITLE OF THE SOLICITATION IN THE SUBJECT LINE. QUESTIONS
WILL NOT BE ANSWERED OVER THE PHONE. QUESTIONS WILL NO LONGER BE ACCEPTED OR
ANSWERED AFTER JULY 13, 2021
2. INCLUDE COMPANY DUNS NUMBER ON PROPOSAL
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 120 calendar days and complete it within ________________ ________________ calendar days after receiving
07/27/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
BLM WY-STATE OFC BUS MGMT BR(WY951)
5353 YELLOWSTONE RD.
CHEYENNE WY 82009
LYA
Kelly Palmer
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 38
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140L6221R0012
3. BID BONDS ARE REQUIRED AND MUST BE RECEIVED
PRIOR TO THE RESPONSE DUE DATE.
4. MUST COMPLETE REPRESENTATIONS FOR CLAUSE
52.204-24 PAGE 15 AND CLAUSE 52.204-26 PAGE 18
FOR THE PROPOSAL TO BE DEEMED RESPONSIVE.
5. A SITE VISIT HAS BEEN SCHEDULED FOR JUNE
20,2021, 10:00 A.M. MOUTAIN TIME, MEETING AT THE
MILLS WAREYARD 815 CONNIE STREET, MILLS WY 82644.
PLEASE SEE SITE VISIT CLAUSE ON PAGE 28 OF THE
SOLITICTATION FOR ADDITIONAL INFORMATION.
CO: KELLY PALMER, 307-775-6057, kpalmer@blm.gov
Legacy Doc #: BLM
Delivery Location Code: 0004276820
BLM-WY WYOMING HIGH PLAINS DISTRICT
2987 PROSPECTOR DR
CASPER WY 82604 US
Period of Performance: 08/02/2021 to 11/30/2021
00010 Mills Wareyard Pavement Repairs
Product/Service Code: Z2LZ
Product/Service Description: REPAIR OR ALTERATION
OF PARKING FACILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
140L6221R0012
MILLS WARE YARD PAVEMENT REPAIR
Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract
County: Natrona County, WY
Type of Construction: Other Heavy and Civil Engineering Construction
Magnitude:
Between $250,000 and $500,000
NAICS:
237990
SIZE STD:
$39.50
SET-ASIDE:
100% Small Business
Bureau of Land Management
Technical Representative Contracting Officer (CO)
Name: Kelly Palmer
Email: kpalmer@blm.gov
Questions Due: July 13, 2021, at 2:00 PM Mountain Time, questions submitted after this date will not be accepted.
Quote Submittal Information: Response Due Date is July 27, 2021, 2:00 P.M. Mountain Time
RESTRICTIONS ON CONTACTS
Beginning upon release of the request for proposal (RFP) through contract award, contacting government employees who may be associated with this work by participating offerors on the subject of this RFP is inappropriate. Offerors for this RFP, including subcontractors and teammates, shall not attempt such contacts during this period. All correspondence shall be through the CO.
SUBMITTAL OF QUESTIONS
Offeror is to consolidate questions related to this solicitation and site visit in a request for information (RFI) formatted Word document. RFI is to be emailed as an editable attachment to Kelly Palmer kpalmer@blm.gov prior to the date and time listed on the cover page of this solicitation. Only written RFI’s will be considered and responded to. BLM responses to the RFI will be posted as an amendment to the solicitation on beta.sam.gov.
AWARD SELECTION PROCESS
Lowest Price Technically Acceptable (LPTA)
Firm-Fixed Price mailto:kpalmer@blm.gov
SPECIAL CONTRACT REQUIRMENTS
WORK HOURS
The performance period established for this contract is based upon all work being conducted during regular working hours between 7:00am and 4:00pm, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.
COMMUNICATIONS
“Time” for communications received after 3:00pm, after 12:00 pm locally on Fridays, or after 12:00 pm locally prior to a holiday will not start until the next business day. All times are local Mountain Standard Time.
FIRE DANGER SEASON
If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
DRAWINGS
(a)Typical Drawings. Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.
(b)Reduced Size Drawings. Any drawings identified as "REDUCED SIZE DRAWINGS" appearing in the solicitation are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective bidders desiring to review a copy of the full size drawings may contact the Contracting Officer identified in the solicitation.
PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
(a)The Historic and Archeological Data Preservation Act of 1974, provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
(b)If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the Contracting Officer in writing, giving the location and nature of the findings. No objects of cultural resource value may be removed.
(c)Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.
(d)The Contractor will be responsible for protecting the cultural resources within the affected area from damage. In addition, the contractor will be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
FEDERAL HOLIDAYS
The following Federal Legal Holidays are observed:
New Year’s Day Martin Luther King, Jr. Day
President’s Day Memorial Day
Independence Day Labor Day
Columbus Day Veterans Day
Thanksgiving Day Christmas
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should a provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated:
"The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
https://www.cpars.gov/ https://www.cpars.gov/
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
LIMITATIONS ON SUBCONTRACTING REPORTING
In accordance with 52.219-14 Limitations on Subcontracting, the prime contractor must perform at least 15% of the cost of the contract, excluding the cost of materials with its own employees and employees of a similarly situated subcontractor. A similarly situated subcontractor is a small business concern subcontractor that is a participant of the same SBA program that qualified the prime contractor as an eligible offeror and awardee of the contract. The contractor is responsible for ensuring compliance with the Limitation on Subcontracting.
At the conclusion of the period of performance and prior to final payment, the contractor shall submit a Limitation on Subcontracting Report directly to the Contracting Officer. The following information is required as part of the report:
1) the total amount paid to the Prime during the performance period broken out by labor and materials
2) list of Similarly Situated Subcontractors and the amounts paid to each during the performance period broken out by labor and materials
3) list of any other subcontractors and the amounts paid to each during the performance period broken out by labor and materials.
If the Contracting Officer review of the report finds that the contractor is not in compliance for the period of performance, the contractor will be notified in writing. Penalties for failure to comply are described in 13 CFR 125.6(h) which states:
Whoever violates the requirements set forth in paragraph (a) of this section shall be subject to the penalties prescribed in 15 U.S.C. 645(d), except that the fine shall be treated as the greater of $500,000 or the dollar amount spent, in excess of permitted levels, by the entity on subcontractors. A party's failure to comply with the spirit and intent of a subcontract with a similarly situated entity may be considered a basis for debarment on the grounds, including but not limited to, that the parties have violated the terms of a Government contract or subcontract pursuant to FAR 9.406-2(b)(1)(i) (48 CFR 9.406-2(b)(1)(i)).
PROPOSAL SUBMITTAL
Proposals must be in accordance with and in the order detailed in this section. Proposals are due by the date and time specified on the cover page of this document. It is the responsibility of offerors to ensure their proposal is received by the recipient and by the due date and time. The offeror is to submit a fully compliant proposal to the following email addresses:
Kelly Palmer/ kpalmer@blm.gov
VOLUME FORMAT INSTRUCTIONS
(a) Each volume must be contained in a separate file.
(b) Each volume must contain a cover page with the following information:
(1) Prime Contractor’s Name
• DUNS
• Contact Information:
o Name o Phone o Email o Address
(2) Volume Number & Title
(c) The proposal must be 11 pitch/point font or larger which would fit on 8 1/2" x 11" page. Color charts, photos, tables, or diagrams shall not exceed 11" x 17". The font size for captions, charts, tables, and diagrams must be no smaller than 10 point.
(d) The proposal shall be within the required page limitation and each page in each section must be consecutively numbered. Pages in excess of the noted page limitation will not be read or considered.
(e) The proposal shall be within the required page limitation and each page in each section must be consecutively numbered. Pages in excess of the noted page limitation will not be read or considered.
(f) The proposal and its page limitations are as follows:
VOLUME TITLE NOUMBER OF COPIES
REQUIRED
TOTAL PAGE
LIMITATION
Volume 1 Required Documentation 1 electronic copy Unlimited
Volume 2 Technical Approach 1 electronic copy 10*
Volume 3 Pricing 1 electronic copy Unlimited
*The following are excluded from the page count: (1) Bid Schedule, (2) Standard Forms 1442 and 30, (3) Table of Contents, (4) Section Dividers (Tabs), (5) Cover Pages, (6) Title Pages and (7) Pricing.
VOLUME 1 - REQUIRED DOCUMENTATION
(a) Complete Blocks 14, 15, 16, 17, and 19 of Standard Form (SF) 1442. An official with authority to contractually bind the offeror's company must complete and sign Blocks 20a, 20b, 20c, 30a, 30b, and 30c of the SF1442 in accordance with the procedures prescribed in the Federal Acquisition Regulation Subpart
4.102. Failure to complete and sign all required blocks will result in an unacceptable offer.
(b) Acknowledgement of Amendments: Acknowledge all solicitation amendments using one of the methods set forth in Block 11 of Standard Form 30, the form on which any amendment will be issued. This includes completing blocks 8, 15A, 15B, and 15C and the SF 1442, and block 19, Acknowledgement of Amendments.
(c) Short Cover Letter:
(1) Offeror’s (company) name, address, and phone number
(2) Point of contact for two individuals within the company (phone number and email address)
(3) Entity making this submittal:
Parent Company _______ Subsidiary _______ Division ________ Branch Office _______
(4) Year company/entity was established: __________
(5) List any former company/entity names and reason(s) for revision/restructuring if applicable
(6) Original signature of the individual with the authority to bind the contractor and to negotiate.
(7) Statement that the proposal is valid for the time period set in block 13, Additional Solicitation Requirements, of the 1442.
(8) Response to the following questions:
o Judgments, Claims, and Lawsuits: Are there any judgments, claims, and/or lawsuits pending or outstanding against or involving entity or partners comprising your entity?
No ___, Yes ___. If yes, submit details of all judgments or claims against either parent office or division/branch that will be responsible for the accomplishment of this project on a separate sheet.
o Is your entity or partners comprising your entity under suspension or debarment by any Federal, state or local agency, or been terminated on any past projects (Federal or others)?
No ___, Yes ___. If yes, submit details on a separate sheet.
o IAW FAR 52.209-7(b), the offeror [ ] has [ ] does not have current active federal contracts and grants with a total value greater than $10,000,000.
o IAW FAR 52.204-24(d), the offeror represents that it [ ] will [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.
(d) Bid Guarantee in accordance with FAR Clause 52.228-1 Bid Guarantee (September 1996).
(e) Limitations on Subcontracting. The prime contractor must perform a minimum of 15% of the cost of the contract, not including the cost of materials, with its own employees. By submission of a proposal, the Offeror confirms that it is compliant with the aforementioned requirement as outlined in FAR 52.219-14. See reporting requirements on page 8, “Limitations on subcontracting reporting”.
VOLUME 2 - FACTOR 1, TECHNICAL APPROACH/CAPABILITIES
(a) Subfactor 1: A construction plan in the form of a narrative shall be provided detailing completion of major project milestones. The construction plan shall explain, in paragraph format the sequence of events that will take place to accomplish the subject requirement. Indicating a thorough understanding of the work required as well as a sound and reasonable approach to complete all project elements. The construction plan successfully illustrated the capability of the offeror to manage all project elements to include suppliers, subcontractors, and employees.
(b) Subfactor 2: The construction schedule was provided in a Gantt or similar format and is within the Governments specified period of performance. Schedule indicates and understanding of the project requirements and utilizes a logical approach to sequencing.
(c) Subfactor 3: Past performance projects deemed not relevant will be rejected and not be considered.
Projects deemed not recent (greater than three years) will be disregarded. The evaluation of past performance information will take into account past performance information regarding predecessor companies, key personnel who have relevant experience or subcontracts that will perform major or critical aspects of the proposed agreement when such information is relevant to this acquisition. The evaluation will also consider information provided relative to corrective actions taken to resolve problems on past or existing contracts. Offerors receiving a rating of No Confidence will not be considered for award.
(d) Evaluation of past performance also includes:
(1) Feedback provided by reference(s) contacted including quality of work performed (material and workmanship), correction of deficiencies, completeness of submittals, O&M, “as-builts”, payroll, schedules, etc., met customer expectations and in compliance with construction documents.
(2) Feedback provided by reference(s) contacted including performance; resolution of delays, identification and correction of work, meeting progress schedules, submission of schedules, completion of punch list items, submission of submittals including documents and as-builts. All the foregoing completed in a timely manner. Warranty issues should have been addressed promptly.
(3) Experience with firm fixed priced contracts and cost control.
(e) In consideration of an Offeror’s total past performance information, one of the following ratings will be assigned:
PERFORMANCE CONFIDENCE ASSESSMENT RATINGS
Rating Description Satisfactory Confidence
Based on the offeror’s performance record, the Government has an expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort
Unknown Confidence
No performance record is identifiable, or the offeror’s performance record is so sparse that no confidence assessment rating can be reasonably assigned.
d) Offerors receiving a final rating of “No Confidence” will not be considered for award.
Each subfactor shall receive one of the following ratings:
RATING DESCRIPTION
Acceptable Proposal meets requirements and indicates and adequate approach and understanding of requirements, and risk of unsuccessful performance is no worse than moderate.
Unacceptable Proposal does not meet requirements of the solicitation and this contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is not awardable.
VOLUME 3 - FACTOR 3, PRICE
(a) Reasonableness. Techniques and procedures described under FAR 15.404-1(b), Price Analysis, will be the primary means of assessing proposal reasonableness. The evaluation techniques described under FAR 15.404-1(c) through (g), as determined appropriate, may also be performed in further determining the reasonableness of the proposal. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through cost and price analysis techniques as described in FAR 15.404, Proposal Analysis. For additional information, see FAR 31.201-3, Determining Reasonableness.
(b) Unbalanced Pricing. All offers priced line items shall be analyzed to determine if prices are unbalanced. An offer may be rejected if it is determined that the lack of balance poses an unacceptable risk to the Government.
(c) Affordability: An affordability assessment will consider if the proposed price is within the Government’s funding profile.
EVALUATION FACTORS FOR AWARD
BASIS FOR CONTRACT AWARD
(a) This acquisition will utilize the Lowest Priced Technically acceptable (LPTA) procedures to make a best value award. This is a competitive LPTA in which technical shall be rated Acceptable or Unacceptable. By submission of its offer, the Offeror accepts all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Offerors with Unacceptable tactical ratings will not be considered for award. Failure to meet a requirement may result in an offer being determined technically unacceptable. Offerors must clearly identify and exception to the solicitation and conditions and provide complete accompanying rational. While the
Government will strive for maximum objectivity, the technical Acceptable/Unacceptable process, by its nature, is subjective; therefore, professional judgment is implicit throughout the evaluation process.
(b) The Government intends to make ONE award based on the evaluation of proposals submitted in response to this solicitation. Award will be made to the responsible offeror whose proposal conforms to all solicitation requirements, such as terms and conditions, representations and certifications, technical requirements, and also provides the best value to the Government based on the results of the evaluation
LPTA EVALUATION PROCESS
The LPTA evaluation process will be accomplished as follows:
(a) Technical Acceptability. Each offeror’s technical proposal will be evaluated to determine if the Offeror provides a sound, compliant approach that meets the requirements of the detailed specifications provided in this solicitation and demonstrates a thorough knowledge and understanding of those requirements. An evaluation rating of Technically Acceptable/Unacceptable will be assigned upon completion of the technical proposal evaluations. If an offeror receives a technical rating of “Unacceptable” for any subfactor, they will not be considered for contract award.
(b) Past Performance Evaluation.
(1) Past performance evaluation results in an assessment of the Government’s confidence in the Offeror’s ability to fulfill the solicitation requirements. The overall confidence assessment will be based upon the recent, relevancy, and quality evaluation of all references reviewed. The past performance evaluation considers each offeror's demonstrated record of performance in meeting users' needs. The performance confidence assessment is rated after evaluating aspects of the offeror's recent past performance, focusing on quality of performance that is relevant to this requirement. If an Offeror receives a past performance rating of “No Confidence”, they will not be considered for contract award.
(2) Sources of Past Performance Information for Evaluation. Past performance information will be provided by the offeror. The Government shall also obtain past performance information from the Past Performance Information Retrieval System (PPIRS). Additionally, offerors are advised the Government will use data provided by sources other than the offeror to evaluate past performance. This information may be obtained from questionnaires from interviews with project managers, CO’s, and other sources known to or found by the Government. The Government may also use information from previous source selections or contractor capability assessments if the information is recent and relevant.
(3) Definitions.
(i) Recent: Recent is defined as a project completed or significantly completed within 3 years from the issuance date of this solicitation.
(ii) Relevant: Past performance effort involving much of the same magnitude of effort and complexities this solicitation requires. Effort and complexities is defined by the scope, tasks and requirement’s specifications. Therefore, projects will be considered not relevant if the past performance effort did not involve any of the magnitude of effort and complexities required by this solicitation. Projects including similar task associated with the requirements of this solicitation as determined by the scope of work and specifications building type, size, magnitude (cost), complexity and scope, and/or contained similar features, functions, components, systems, and/or project(s) was for a federal, state, or local municipality. The magnitude is defined in Block 10 of the SF 1442.
(c) Price Evaluation. Price must be determined fair, reasonable, affordable, and balanced will be evaluated in accordance with, Price, below.
PART 1-THE SCHEDULE
SPECIFICATIONS, STANDARDS AND DRAWINGS
A. Description of Work: Furnishing all labor, equipment, and materials, to crack seal, mill, and pave at the locations as shown on the drawings for the BLM High Plains District at the Mills Ware yard located in Mills, Wyoming. Bid items and quantities are listed in the Bid Schedule. The period of performance for this contract is listed in these General Requirements, section 1.7 (Sequencing and Scheduling).
B. Location: Work under this Contract is located as shown on the project drawings; 815 Connie Street, Mills, WY 82644.
All work shall be performed under as single firm-fixed price contract.
Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction Deliveries or Performance AUG 1996
52.242-14 Suspension of Work APR 1984
CLAUSES INCORPORATED BY FULL TEXT
DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements & Internet Payment Platform (IPP) (August 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Copy of Original Invoice, Certification or Progress Payments Under Fixed-Price Construction Contracts and/or DI-137 Release of Claims
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
LOCAL INTERNET PAYMENT PLATFORM (IPP) HOTLINE
To check payment status, contact the Payment Hotline at 877-480-9724 or 303-236-2850. You will need to leave a message with the following information:
1. Company Name
2. Contract Number
3. Invoice Number
4. Invoice Amount
5. A brief description of why you are calling
6. Your contact information
If you do not receive a callback from the Payment Hotline within 72 hours, please contact the Contract Officer with the day and time you contacted the Payment Hotline.
CLAUSES INCORPORATED BY REFERENCE
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
May 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity May 2014 52.204-7 System for Award Management Oct 2018 52.204-25 Prohibition on Contracting for Certain Telecommunications and
Video Surveillance Services or Equipment Aug 2020
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
Jun 2020
52.215-2 Audit and Records--Negotiation Jun 2020 52.215-8 Order of Precedence--Uniform Contract Format Oct 1997 52.215-11 Price Reduction for Defective Cost or Pricing Data--Modifications Jun 2020 52.215-13 Subcontractor Cost or Pricing Data--Modifications Jun 2020 52.222-3 Convict Labor Jun 2003 52.222-6 Davis Bacon Act Aug 2018 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records Aug 2018 52.222-9 Apprentices and Trainees Jul 2005 52.222-10 Compliance with Copeland Act Requirements Feb 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards Feb 1988 52.222-15 Certification of Eligibility May 2014 52.222-21 Prohibition Of Segregated Facilities Apr 2015 52.222-26 Equal Opportunity Sep 2016 52.222-27 Affirmative Action Compliance Requirements for Construction Apr 2015 52.222-36 Equal Opportunity For Workers With Disabilities Jun 2020 52.223-5 Pollution Prevention and Right-to-Know Information May 2011 52.225-13 Restrictions on Certain Foreign Purchases Feb 2021 52.226-1 Utilization Of Indian Organizations And Indian-Owned Economic
Enterprises Jun 2000
52.227-1 Authorization and Consent Jun 2020 52.227-4 Patent Indemnity-Construction Contracts Dec 2007 52.228-2 Additional Bond Security Oct 1997
52.228-5 Insurance - Work On A Government Installation Jan 1997 52.232-5 Payments under Fixed-Price Construction Contracts May 2014 52.232-23 Assignment Of Claims May 2014 52.232-27 Prompt Payment for Construction Contracts Jan 2017 52.232-33 Payment by Electronic Funds Transfer—System for Award
Management Oct 2018
52.233-1 Disputes May 2014 52.233-3 Protest After Award Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim Oct 2004 52.236-2 Differing Site Conditions Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work Apr 1984 52.236-5 Material and Workmanship Apr 1984 52.236-6 Superintendence by the Contractor Apr 1984 52.236-7 Permits and Responsibilities Nov 1991 52.236-8 Other Contracts Apr 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements Apr 1984
52.236-10 Operations and Storage Areas Apr 1984 52.236-11 Use and Possession Prior to Completion Apr 1984 52.236-12 Cleaning Up Apr 1984 52.236-13 Accident Prevention Nov 1991 52.236-14 Availability and Use of Utility Services Apr 1984 52.236-15 Schedules for Construction Contracts Apr 1984 52.236-17 Layout of Work Apr 1984 52.236-21 Specifications and Drawings for Construction Feb 1997 52.236-21 Alt I Specifications and Drawings for Construction (Feb 97) - Alternate I Apr 1984 52.236-26 Preconstruction Conference Feb 1995 52.243-4 Changes Jun 2007 52.243-5 Changes and Changed Conditions Apr 1984 52.244-6 Subcontracts for Commercial Items Nov 2020 52.246-21 Warranty of Construction Mar 1994 52.249-1 Termination for Convenience of the Government (Fixed-Price) Apr 1984 52.249-10 Default (Fixed-Price Construction) Apr 1984 52.253-1 Computer Generated Forms Jan 1991 1452.203-70 Restrictions on Endorsement-Department of Interior Jul 1996 1452.204-70 Release of Claims-Department of Interior Jul 1996
CLAUSES INCORPORATED BY FULL TEXT
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT (OCT 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services—Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.
https://www.acquisition.gov/far/52.204-26#FAR_52_204_26 https://www.acquisition.gov/far/52.212-3#FAR_52_212_3 https://www.acquisition.gov/far/52.204-26#FAR_52_204_26 https://www.acquisition.gov/far/52.212-3#FAR_52_212_3
(a) Definitions. As used in this provision—
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub.
L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services".
(d) Representation. The Offeror represents that—
(1) It □ will, □ will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that—
It □ does, □ does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.
(e) Disclosures.
https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.sam.gov/
(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment—
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services—
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment—
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services—
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(End of provision)
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-REPRESENTATION (OCT 2020)
(a) Definitions. As used in this provision, "covered telecommunications equipment or services" and "reasonable inquiry" have the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services".
(c) (1) Representation. The Offeror represents that it □ does, □ does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.
(2) After conducting a reasonable inquiry for purposes of this representation, the offeror represents that it □ does, □ does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services.
(End of provision)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after acknowledgement of the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (May 2014) a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction age Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (February 1999)
(a)The offeror's attention is called to the Equal Opportunity clause and theffirmative Action Compliance Requirements for Construction clause of this solicitation.
https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 http://acquisition.gov/far/current/html/52_222.html#wp1147505
(b)The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation for Each Trade
Goals for Female Participation for Each Trade
7.5% 6.9%