- BDO FY21 WHISKEY FENCE CONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L2621Q0039
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FenceSpecifications_0001.pdf | ||
| Sol_140L2621Q0039_Amd_0001.pdf | ||
| WiskeyFenceProposalAllMaps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L2621Q0039
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
07/15/2021 0040537615
1 59
1387 S. VINNELL WAY
BOISE ID 83709
BLM ID-STATE OFC HR&ADM SVC (ID953)
12/11/2021
BLM-ID BOISE DISTRICT OFFICE*
3948 DEVELOPMENT AVE
BOISE
ID 83705-5389
208 373-3910Patricia Fort
08/12/2021 1000 MD
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Period of Performance: 09/13/2021 to 12/11/2021
00010 Construction of New Permanent Fence Product/Service Code: Y1PZ Product/Service Description: CONSTRUCTION OF
OTHER NON-BUILDING FACILITIES
Delivery: 12/11/2021
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
SOLICITATION NO: 140L2621Q0039
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 2
Type of Contract: Construction, Firm-Fixed Price (FFP) County: Owyhee County, Idaho Type of Construction:
Magnitude: $25,000 and $100,000 NAICS: 238*990 Size Standard: $16.5 Million Set-Aside: Total Small Business
Bureau of Land Management Contracting Officer’s Representative (COR) Contracting Officer
Name: Rob Bennett Patricia A. Fort
Email: rjbennett@blm.gov pfort@blm.gov
Site Visit: See Section L.7
Proposal Due Date: Thursday, August 12, 2021, at 10:00 am MDT
Award Selection Process: Lowest Price mailto:pfort@blm.gov
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 3
General
(a) The Bureau of Land Management (BLM) is seeking quotations for construction services as attached in the accompanying statement of work. The BLM intends to conduct this acquisition by use of simplified acquisition procedures in accordance with FAR Part 13. A single contract award will be made to the Offeror that submits a quotation that has been determined to be the lowest price reasonable offeror.
(b) The Government will not award any contract if the resulting contract would not represent a "best value" to the Government.
(c) To assure timely and equitable evaluation of quotations, respondents are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete quotation. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to adhere to quotation requirements, at the time of submission, may result in the quotation being unacceptable to the Government and eliminated from consideration for award. It is the responsibility of offerors to ensure their quote is received by the recipient and by the due date and time.
(d) Offerors are cautioned to submit adequate information to enable the Government to fully ascertain each offeror’s capability to perform the requirements in accordance with the requirements of the request for quotation (RFQ).
(e) If a respondent believes that requirements in these instructions contain an error, omission, or are otherwise flawed, the respondent shall immediately notify the Contracting Officer in writing (email is the preferred method) with supporting rationale by the question deadline specified on the cover page of this document.
(f) This RFQ does not commit the Government to any costs incurred in the preparation and submission of a quote or for any other costs incurred by any firm submitting a quote in response to this solicitation. Note specifically that the Offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this RFQ does not constitute an award commitment on the part of the Government.
(g) Quotation must be valid for a minimum of 60 days.
(h) Respondents must complete the System for Award Management (SAM) at https://sam.gov (previously ORCA and CCR). The Government will obtain respondent representations and certifications through this system.
(i) Award is subject to and based on the availability of funds. This project is currently funded based upon an independent cost estimate.
(j) Including all other factors, to qualify for award, a respondent must be determined responsible in accordance with Federal Acquisition Regulation Part 9.
(k) Respondents shall not contact any government personnel related to this requirement other than the Contracting Officer.
(l) All questions should be emailed directly to the Contracting Officer. Only written RFI’s will be considered and responded to by the Government. BLM responses to RFIs will be posted as an amendment to the solicitation.
(m) The successful Offeror shall submit appropriate Performance and Payment Bonds in accordance with clause 52.228-1 or Alternative Payment Protection in accordance with clause 52.228-13 within 10 days of contract award.
SUBMIT ONLY REQUESTED ITEMS NOT THE ENTIRE SOLICITATION
https://sam.gov/
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 4
TABLE OF CONTENTS
Part I - The Schedule
Section A - Solicitation/Contract Form See Standard Form 18
Section B - Bid Schedule 5
Section C - Specifications/Drawings 6
Section D - Packaging and Marking 17
Section E - Inspection and Acceptance 18
Section F - Deliveries or Performance 19
Section G - Contract Administration Data 21
Section H - Special Contract Requirements 23
Part II - Contract Clauses
Section I - Contract Clauses 26
Part III - List of Documents, Exhibits, and Other Attachments
Section J - List of Attachments 42
Part IV - Representations and Instructions
Section K - Representations, Certifications, and Other Statements of Offerors 47
Section L - Instructions, Conditions and Notices to Offerors 53
Section M - Evaluation Factors for Award 58
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 5
PART I - THE SCHEUDLE
SECTION B: BID SCHEDULE
Offerors are to complete Blocks 13 - 16 of the SF-18.
BDO FY21 WHISKEY FENCE CONSTRUCTION
Item # Whiskey New Permanent Fence Construction Quantity Units Unit Price Total Cost
1 4-Wire Fence Construction 16.0’ Spacing (Feet) 26,816 Feet $ $
2 Brush Removal 100 Feet $ $ 3 New 2 Post End Panel 5 Each $ $ 4 New 3 Post End Panel 4 Each $ $ 5 New 3 Post Corner 6 Each $ $ 6 New 5 Post Corner 11 Each $ $ 7 New 3 Post Stress Panel 7 Each $ $ 8 Barbed Wire Gate (4-Wire) 6 Each $ $ 9 Steel Rock Jack 32 Each $ $ 10 Drainage Crossing 1 Each $ $
TOTAL - ALL OR NONE $______________
ESTIMATED START DATE: 09/13/2021
ESTIMATED END DATE: 12/11/2021
CONTRACT TIME: 90 Calendar Days
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 6
SECTION C: SPECIFICATIONS/DRAWINGS
SECTION 01009 - GENERAL INFORMATION AND REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
Construct with Government supplied material, 4-wire permanent fence (top and middle wires barbed and bottom wire smooth) with steel pipe structures and steel rock jacks as shown in the drawings.
A. Description of Work: Furnish labor and equipment to construct the specified permanent barbed wire fence.
B. Location of Work Sites as shown on Work Location Maps: The project is located approximately 15 miles west of Murphy, Idaho in Owhyee County near the historic town of Silver City.
From Murphy, ID take Hwy 78 south for 4.6 miles to Silver City RD. Follow the Silver City RD for 8.0 miles to a parking area where the road surface transitions from pavement to gravel. Continue south for 4.6 miles down the grade to another parking area adjacent to the culvert crossing Sinker Creek. From the parking area red flags attached to t-posts can be seen to the north and south representing the location of the fence construction.
The project will be implemented on federal lands administered by the Bureau of Land Management’s (BLM) Owyhee Field Office.
Average elevation varies between project units and ranges from approximately 3,700-5,500 feet.
Permanent Fence Construction: T04S R03W Sec 11, 13, 14, 24 and 25.
C. Work Data Sheet: Designates the type and quantity of work required at each project location.
1.2 DEFINITIONS
A. Approvals: Approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the Drawings and Specifications brought to the Contracting Officer's attention in writing. After approval of an item, submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.
1.3 SUBMITTALS
A. Scope: Submittals include design computations, shop drawings, manufactures' literature, as built drawings, samples, and maintenance manuals.
B. Requirements: Refer to individual Specifications for submittals required. Submittals shall be delivered to the Contracting Officer. Allow at least 5 working days for review.
C. Identification of Submittals: Completely identify each submittal by showing at least the following information:
1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 7
2. Name of project as it appears in these Specifications.
3. Contract number, Drawing number, and Specification section number to which the submittal applies.
4. Whether this is an original submittal or resubmittal.
5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.
1.4 QUALITY ASSURANCE
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work as listed in the individual sections of these Specifications and as shown on the Drawings.
B. Conflict: Where a conflict occurs between Reference Documents and Project Specifications, the Project Specifications shall govern.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Protect products incorporated into the work from damage while in transit to the site.
B. Storage: Provide temporary storage facilities for products which will protect them from damage until installation on the project and final acceptance.
C. Handling: Load and unload products protecting them from damage.
1.6 PROJECT/ SITE CONDITIONS
A. Access to the Work Site: Much of the project is in steep terrain with surface rock, subsurface rock, and rock outcroppings. Only 1.8 miles of the project is accessible by all-terrain vehicles and utility terrain vehicle (ATV/UTV). The remainder of the project (3.2 miles) is only accessible by foot traffic.
B. No blading or scraping of the ground along the fence line or on any Bureau of Land Management administered land is permitted. Access roads shall not be constructed along fence lines or to the job sites, but travel along the fence line is permitted.
C. No cross-country travel with motorized vehicles shall take place when ground is muddy. The Contractor shall repair all ruts and scarred ground created by construction, repair, or removal as directed by the Contracting Officer. (ATV/UTV). The remainder of the project (3.2 miles) is only accessible by foot traffic.
D. Specific areas may be flagged that designate sensitive area due to archaeological sites, wildlife nesting areas, sensitive plant species, etc. The Government may impose restrictions to vehicle travel or other operations in the areas.
E. Camping at or near the job site is permitted as long as it does not exceed a maximum of 14 days in any one location. Camping is prohibited within 100 yards of any isolated water source springs, seeps, water troughs, windmills, small reservoirs, etc.) Toilet facility requirements shall follow all Federal and State regulations. When a camp site is longer needed, all garbage and fence building supplies must be removed and properly disposed of. These areas shall be approved in advance by the Contracting Officer.
F. Clean-up: All trash and excess materials must be removed from the project site on completion of construction and disposed on in a manner, and at a location, approved by the Contracting Officer.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 8
G. Cultural Considerations: Because fragile and irreplaceable culture resources may be present in the area, project activities and any other action which causes disturbance of the earth's surface shall be limited to those areas approved by the BLM. Deviations from routes flagged or shown on the drawings are not allowable without prior approval of the Contracting Officer. The Contractor shall insure that he, his employees, or his representatives do not collect archaeological artifacts. Should the condition of the cultural resources in the area be altered during construction due to unauthorized activity by the Contractor or his employees, the Contractor shall be responsible for all costs of mitigating the cultural resources involved. If deterioration of the archaeological sites is found to be occurring during the construction phase, work on the project shall be terminated until a data recovery plan is prepared and completed in accordance with the National Historic Preservation Act
1.7 SEQUENCING AND SCHEDULING
A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, submit an updated schedule within 3 calendar days. As a minimum, the estimated start and completion dates shall be shown in the estimate.
PART 2 - PRODUCTS
(There are no applicable requirements.)
PART 3 - EXECUTION
3.1 PROJECT MEETINGS
A. Pre-Work Conference:
1. Will be held prior to the start of work on each Order. The Contractor will be notified in advance of meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2. The Contractor, subcontractors and persons responsible for coordination of the work shall be present at the meeting.
3. Be prepared to summarize and explain procedures planned for the project.
B. Progress Meetings:
1. To be held at the project site, or as determined by the Contracting Officer.
2. May be called by either the Contracting Officer or the Contractor. The request shall state who should attend and include an agenda.
C. Final Inspection:
1. To be held at the project site, or as determined by the Contracting Officer.
2. Notify the Contracting Officer in writing at least 3 working days before the completion date so the
Government can schedule final inspection.
3. The Contractor or the Contractor's authorized representative shall be present during this inspection.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 9
3.2 PREPARATION
A. Work Layout: The Government will set flags or fence posts within site distance to give the Contractor lines and angles necessary for the work executed under the Contract. Where new fences are to replace existing fences, corners, gates, and end panels shall be located in the same place as the existing fence. Stress panels shall be located as specified for each type of fence.
3.3 DISPOSAL OF DEBRIS
A. Requirements: Items or debris not designated as salvage for the Government shall become the property of the Contractor. Disposal of materials in a legal manner and payment of fees required is the Contractor's responsibility. Burning of removed materials is not permitted on the work site.
PART 4 - MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this Section will not be measured for payment.
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this Section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
END OF SECTION 01009
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 10
SECTION 01019 - GOVERNMENT-FURNISHED PROPERTY
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes fencing materials to be furnished by the Government and their locations.
1.2 DELIVERY, STORAGE, AND HANDLING
A. Location: The Government-furnished property will be provided by the Bureau of Land Management at the BLM Wareyard at 3948 S. Development Avenue, Boise, Idaho 83705.
B. Time: Property will be available Monday through Friday, from 8:00 am to 3:30 pm except on holidays. An appointment is required to assure that a warehouseman is available. Appointments are made by calling the phone number listed on each Order a minimum of 24 hours prior to intended pickup time.
C. Return of Unused Property: Return unused materials to the same place as they were picked up unless the Contracting Officer states otherwise.
D. Loading, Offloading and Transporting Property: The Contractor is responsible for providing the necessary material-handling equipment to load and offload materials at the work site. The Contractor shall transport materials to the work site. Unless otherwise noted, a Government forklift and operator will be available at the Wareyard.
PART 2 - PRODUCTS
2.1 MATERIALS
A. All materials for the project will be furnished by the Government:
Estimated Fence Materials QUANITY UNIT Steel Posts 5.5' 1600 EACH Barbed Wire 12.5 ga 60 ROLL Barbless Wire 12.5 ga 24 ROLL Wire Stays 36" 1600 EACH Wire Fasteners (Clips) 100/pkg 64 BAG Wood Stays (Gate Sticks) 30 EACH Steel Pipe Posts 2 3/8" x 7' 159 EACH Steel Pipe Brace Posts 1 5/8" x 8' 110 EACH Galvanized Post Caps 135 EACH Rebar #4 2' 110 EACH Steel Rock Jacks 32 EACH Galvanized Brace Band Clamp 2 3/8" w/ nuts and bolts 342 EACH Brace Rail Connector 220 EACH Staples 1.5" (70/lb) 3 LB
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 11
PART 3 - EXECUTION
(There are no applicable requirements.)
PART 4 - MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this Section will not be measured for payment.
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this Section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
END OF SECTION 01019
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 12
SECTION 02824 - WIRE FENCES AND GATES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes installing with Government-Furnished property, barbed wire and woven wire fences, and repair of existing fences.
B. Furnish all labor, tools, equipment, supervision, and any other resources necessary to complete fence projects.
C. Related Sections:
General Information and Requirements Section 01009.
PART 2 - PRODUCTS
2.1 GOVERNMENT-FURNISHED MATERIALS (as applicable to project requirements)
A. Barbed Wire: A strand of two 12-1/2 gauge galvanized wires twisted together with 2-point barbs of 14-gauge wire spaced 4 inches apart. Wire and barbs shall be zinc-coated steel, with a zinc coating of at least 0.3 oz/ft2 of coated surface area. The minimum breaking strength of each wire shall be 950 lb force. The barbed wire shall conform to ASTM A 121.
B. Barbless Wire: A strand of two 12-1/2 gauge galvanized wires twisted together. Wire shall be zinc-coated steel wire of at least 0.3 oz/ft2 of coated surface area. The minimum breaking strength of each wire shall be 950 lb force. The barbless wire shall conform to ASTM A 121.
C. Brace Wires: Four wires of 9-gauge smooth, galvanized wire or 2 wires of galvanized, 12-1/2 gauge barbless wire. The minimum weight of zinc coating for 9-gauge wire shall be at least 0.4 oz of zinc/ft2 of coated surface area; for 12-1/2 gauge wire at least 0.3 oz of zinc/ft2 of coated surface area.
D. Clip-Type Wire Fastener: Galvanized wire, 8-gauge.
E. Mechanical Gate Closures: Assembly must include the following salient features:
1. A rigid steel strap or 9-gauge smooth wire loop 6 inches from the ground securely connected to the gate post and shaped so the gate stay will be securely held in place.
2. An adjustable cable or chain, or rigid steel strap fastened to a cam lever device located 6 inches from the top of the gate post. The closer shall be capable of securely holding the gate stay in place.
3. Gate latch by Toland & Sons, P.O. Box 1970, Winnemucca, NV 89446, or approved equal.
F. Miscellaneous Wire: Wire for ties, gate loops and fastening wood stays shall be 9 or 12-1/2 gauge galvanized wire.
G. Staples: Bright-finish or galvanized 9-gauge with slash-cut points 1-3/4 inches long.
H. Wire Fence Stays: Twisted wire fence stays manufactured from smooth galvanized 9-gauge wire.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 13
I. Wood Gate Stays: Sound and straight pieces, 1-1/2 to 3-1/2 inch diameter of the species pine or fir (with bark removed), honey locust, western red cedar (full stem with bark removed), juniper, osage orange, and white oak. Treatment with preservative is not required. Stays shall be of uniform length sufficient to touch the ground. Total length shall be 4'-0".
J. Steel Pipe: ASTM F 1083 SS40. Post pipe shall be 2-1/2 inch (2.375 inch O.D., 3.12 lb/ft); brace pipe, 1-5/8 inch, (1.66 inch O.D., 1.84 lb/ft). Brace clamps and fittings shall be galvanized.
OR
Steel Pipe: ASTM A 53 or F 1083. Post pipe shall be 2 inch, schedule 40 (2.375 inch O.D., 3.65 lb/ft); brace pipe shall be 1.25 inch, schedule 40 (1.66 inch O.D., 2.27 lb/ft). Brace clamps and fittings shall be galvanized.
PART 3: - EXECUTION
3.1 INSTALLATION
A. Drive steel fence posts into the ground to the depth shown on the Drawings or until the anchor plate is slightly below the ground surface. Posts shall be driven plumb. When rock formations prevent driving remove anchor plate and drill holes a minimum of 18 inches deep and slightly smaller than the diameter of the post. Drive posts solidly into the holes.
B. Wire: Stretch tightly and staple to wood posts or securely attach to steel posts with standard wire clips. Wire is properly stretched when it is springy to the touch. Drive staples into wood until the staple comes in contact with the wire against the post, but not so tight as to crimp the wire. Do not drive staples parallel to the grain of the wood. Terminate wire at each end post, gate post, corner post, or stress panel by wrapping wire around the post two times and tie off by uniformly wrapping the incoming wire a minimum of four times.
C. Brace Wires: All panels shall be wrapped with two complete wraps of barbless wire and twisted tight with a tensioning device (wood stay stick, rebar or digger link). Leave one end of the tensioning device long enough to fasten behind the horizontal brace to prevent wire from unwinding.
D. Corner Panel, Stress Panel, and End Panel Assemblies: Construct as shown on the Drawings or as staked in the field. Construct stress panels on crests of hills, and a maximum of 1320 feet center-to-center for barbed wire. In addition, stress panels are required at points between which wire is to be stretched. Construct end panels at the end of fence runs and on each side of a gate unless shown otherwise on the Maps or Drawings.
E. Rock Jacks: With the approval of the Contracting Officer, steel rock jacks may be used in lieu of steel end panels, corner panels, and stress panels where rock formations prevent dug holes. Rock jacks will be paid for at the same unit price as the substituted item. Construct as shown on the Drawings. Figure fours shall not be used in place of line posts.
F. Gates: Shall be installed according to the Work Data Sheet and the Drawings. Fulcrum-type gate openers shall be installed on all gates using 4 foot long wood stays, or as approved by the Contracting Officer. Wire Gates:
Shall be constructed of smooth wire, wood stays, and wire stays. Gate should be constructed to a width of 14’ unless otherwise noted by flagged area at project site.
G. Wire Stay Installation: Shall be installed at the spacing and quantities as shown on the Work Data Sheet.
H. Items or debris (including layout flags), not designated as salvage for return to the government, shall become the property of the Contractor. The Contractor is responsible for the disposal of materials in a legal manner and the payments of all disposal fees. Burning of removed materials is not permitted on the work site.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 14
I. Steel Pipe Assemblies: Steel pipe panels shall be constructed in accordance with the Drawings and will include galvanized pipe caps on the tops of the structures. If loose soil conditions cause corner panels to lift when the fence wire is stretched, a steel post shall be driven parallel and adjacent to the corner pipe a minimum of 2'-6" deep and wired to the panels. When rock formations prevent driving pipe, drill holes 18 inches deep and the same diameter as the pipe. Drive pipe solidly into the holes.
PART 4 - MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this Section will be measured and paid for by the linear foot for each type of fence constructed or repaired as measured along the ground surface next to the completed fence or as measured with GPS as indicated in the Order, including distance across gate openings; end, stress, and corner panels; and drainage crossings. The quantities of end, stress, and corner panels, gates, rock cribs, and stiles to be paid for will be the actual number of these items. Note: Gates do not include adjacent end or corner panels.
These are separate items.
4.2 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this Section. Payment will be made under:
Pay Item Quantity Pay Unit
1 4-Wire Fence Construction 16.5’ Spacing (Feet) 26,816 Feet
2 Brush Removal 100 Feet 3 New 2 Post End Panel 5 Each 4 New 3 Post End Panel 4 Each 5 New 3 Post Corner 6 Each 6 New 5 Post Corner 11 Each 7 New 3 Post Stress Panel 7 Each 8 Barbed Wire Gate (4-Wire) 6 Each 9 Steel Rock Jack 32 Each 10 Drainage Crossing 1 Each
END OF SECTION 02824
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 15
PART 5 - WORK DATA SHEET
WORK DATA SHEET
For
SECTION 02824 WIRE FENCES AND GATES
5.1 NEW PERMANENT FENCE (Segment 1-4)
Fence Type: 26,816 feet of 4-wire fence, 3-strands barb, 1-strand smooth wire with 16.5' max steel post spacing. Posts spacing will be such that consistent wire spacing is maintained in variable terrain.
Wire locations/dimensions in inches (typical spacing): Type of Wire:
12" (Top) 12 ½ gauge barbed 6" (Middle) 12 ½ gauge barbed 6" (Middle) 12 ½ gauge barbed 18" (Bottom) 12 ½ gauge smooth
Line Post Spacing (L): 16.5’feet maximum. Posts spacing will be such that consistent wire spacing is maintained in variable terrain
Stay Spacing: 1 stay evenly spaced between each line post.
Length of steel line post: 5 foot 6 inches
Depth of steel line post in ground: 1 foot 6 inches
Depth of Steel Pipe in ground: 3 foot 3 inches
Site Specific Descriptions:
Segment 1: The segment is in steep, rocky terrain with minimal access by vehicle or ATV/UTV. Unpaved roads provide 4x4 vehicle access to the highest elevation northern segment of the project site. Due to the terrain much of the project will only be accessible by foot traffic but the transportation of materials will primarily be downhill from the most northern starting point.
Segment 2: The segment is primarily accessible by ATV/UTV and parallels an ATV trail for .8 miles. The segment will adjoin with an ATV/UTV cattle guard near the Sinker Creek parking area and will terminate to a 14’ cattle guard on the Silver City RD. If the proposed cattle guards have not been installed before the initiation of the fence construction project, the fence will terminate to steel pipe end panels.
Segment 3: The segment connects to a 14’ cattle guard on the Silver City RD and parallels the road until crossing Sinker Creek. A drainage crossing will be installed on the west side of the creek and will join a rock jack on the east side. Clearing of brush will be necessary for 100 ft. for correct placement of fence along creek. Brush clearing shall not exceed 4 ft. on either side of the proposed fence line. No blading or scraping of the ground along the fence line or on any Bureau of Land Management administered land is permitted.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 16
Segment 4: Due to the limited access out of the Sinker Creek drainage much of the segment will have to be constructed without ATV/UTV use. Once out of the drainage the terrain transitions to rolling hills with rock outcroppings.
SPECIAL CONSIDERATIONS
New permanent fence project segments have been flagged on steel posts. Red flags indicate structures (corners, gates). Stress Panels locations are not flagged, general locations are depicted on the map. White flags indicate fence line between structures.
Only rocks within the immediate proximity of the fence line will be used in the construction of rock jack structures.
Rocks near land survey markers of any kind shall not be disturbed for the construction or repair of any fence segments.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 17
SECTION D: PACKAGING AND MARKING
Packaging and marking of deliverables shall be IAW the Contractor’s standard commercial practices.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 18
SECTION E: INSPECTION AND ACCEPTANCE
E.1 52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far#
Clause Title Date 52.246-12 Inspection of Construction August 1996
E.2 Final Inspection and Acceptance
Final completion of the punch list items, submission of all required submittals, and final cleanup of the project site shall be completed before the contract’s required completion date. The Contracting Officer or his/her designated representative will perform final inspection. Acceptance of the work will occur only upon written notice of acceptance by the ordering Contracting Officer or any other Warranted Contracting Officer employed by the Bureau of Land Management (BLM) and performing authorized duties in conjunction with this contract.
https://www.acquisition.gov/browse/index/far#
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 19
SECTION F: DELIVERIES OR PERFORMANCE
F.1 52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far#
Clause Title Date 52.211-13 Time Extensions September 2000 52.211-18 Variation in Estimated Quantity April 1984 52.236-11 Use and Possession Prior to Completion April 1984
F.2 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days after receipt of Notice to Procced. *The time stated for completion shall include final cleanup of the premises.
*The Government recognizes that seasonal climatic conditions may occur that restrict or prohibit normal construction activities. The anticipated length of the seasonal delay for this project is 0 days. This number of days has been included in calculating the stated period of performance. Therefore, the contract period of performance will not be extended due to normal seasonal weather delays.
F.3 52.211-12 Liquidated Damages--Construction (Apr 1984)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $800.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
F.4 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 20
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
F.5 Simultaneous Performance
If a Contractor receives award of more than one contract, simultaneous performance will be required. All work must be completed within the timeframe allowed for each contract.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 21
SECTION G: CONTRACT ADMINISTRATION DATA
G.1 Authorities and Delegations (Sep 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum.
The Contractor need not proceed with direction that it considers to have been issued without proper authority.
The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G.2 Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Apr 2013)
Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP).
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 22
"Payment request" means any request for contract financing payment or invoice payment by the Contractor.
To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions- Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
(a) Copy of Company Generated Invoice.
(b) Substantiation Forms are to be submitted with progress payments only.
(c) Release of Claims shall be submitted with the final payment only.
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment.
The Contractor Government Business Point of Contact will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.3 Local Internet Payment Platform (IPP) Hotline
To check payment status, contact the Payment Hotline at 877-480-9724 or 303-236-2850. You will need to leave a message with the following information:
1. Company Name
2. Contract Number
3. Invoice Number
4. Invoice Amount
5. A brief description of why you are calling
6. Your contact information
If you do not receive a callback from the Payment Hotline within 72 hours, please contact the Contracting Officer with the day and time you contacted the Payment Hotline.
G.4 Government Point of Contact
Patricia A. Fort pfort@blm.gov Bureau of Land Management 1387 S Vinnell Way Boise, ID 83709 Telephone (208) 373-3910 http://www.ipp.gov./ mailto:ippgroup@bos.frb.org mailto:pfort@blm.gov
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 23
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 Work Hours
The performance period established for this contract is based upon all work being conducted during regular working hours between 7:00 am and 5:30 pm, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.
In addition to any holidays declared by Executive Orders, the following Federal Legal Holidays are observed:
New Year’s Day Martin Luther King Jr. Day President’s Day Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
H.2 Communications
“Time” for communications received after 3:00 pm, after 12:00 pm locally on Fridays, or after 12:00 pm locally prior to a holiday will not start until the next business day. All times are local Mountain time.
H.3 Fire Danger Season
If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
H.4 Drawings
(a) Typical Drawings. Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.
(b) Reduced Size Drawings. Any drawings identified as "REDUCED SIZE DRAWINGS" appearing in the solicitation are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective bidders desiring to review a copy of the full-size drawings may contact the Contracting Officer identified in the solicitation.
H.5 Preservation of Historical and Archeological Data
(a) The Historic and Archeological Data Preservation Act of 1974 provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
(b) If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the Contracting Officer in writing, giving the location and nature of the findings. No objects of cultural resource value may be removed.
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 24
(c) Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.
(d) The Contractor will be responsible for protecting the cultural resources within the effected area from damage.
In addition, the contractor will be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
(e) The Contractor agrees to insert this paragraph in all subcontracts that involve the performance of work on the terrain of the site.
H.6 Safety and Quality Control Plan
Following contract award, the contractor must provide effective quality assurance and safety plans for acceptance by the Government.
H.7 Limitations on Subcontracting Reporting
In accordance with 52.219-14 Limitations on Subcontracting, the prime contractor must perform at least 15% of the cost of the contract, excluding the cost of materials with its own employees and employees of a similarly situated subcontractor. A similarly situated subcontractor is a small business concern subcontractor that is a participant of the same SBA program that qualified the prime contractor as an eligible offeror and awardee of the contract. The contractor is responsible for ensuring compliance with the Limitation on Subcontracting.
At the conclusion of the period of performance and prior to final payment, the contractor shall submit a Limitation on Subcontracting Report directly to the Contracting Officer. The following information is required as part of the report:
1) the total amount paid to the Prime during the performance period broken out by labor and materials 2) list of Similarly Situated Subcontractors and the amounts paid to each during the performance period broken out by labor and materials 3) list of any other subcontractors and the amounts paid to each during the performance period broken out by labor and materials.
If the Contracting Officer review of the report finds that the contractor is not in compliance for the period of performance, the contractor will be notified in writing. Penalties for failure to comply are described in 13 CFR 125.6(h) which states: Whoever violates the requirements set forth in paragraph (a) of this section shall be subject to the penalties prescribed in 15 U.S.C. 645(d), except that the fine shall be treated as the greater of $500,000 or the dollar amount spent, in excess of permitted levels, by the entity on subcontractors. A party's failure to comply with the spirit and intent of a subcontract with a similarly situated entity may be considered a basis for debarment on the grounds, including but not limited to, that the parties have violated the terms of a Government contract or subcontract pursuant to FAR 9.406-2(b)(1)(i) (48 CFR 9.406-2(b)(1)(i)).
H.8 Environmental Impact
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ); the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C.
6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).
PROJECT DESCRIPTION: BDO FY 21 Whiskey Fence Construction Page 25
Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
H.9 Hazardous Materials
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas.
Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry.