Sol_140G0122Q0182.pdf

PDF 1 MB Posted

Attached to
REPLACE LAB VACUUM & COMPRESSED AIR SYSTEMS, OPTIO Federal contract opportunity
Solicitation number
140G0122Q0182
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE LAB VACUUM & COMPRESSED AIR SYSTEMS, OPTIO, newest first.
File Type Posted
Sol_140G0122Q0182_Amd_0002.pdf PDF
Sol_140G0122Q0182_Amd_0001.pdf PDF
Wage_Determination.pdf PDF
Past_Performance_Questionnaire.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040575245

USGS OAG RESTON ACQUISITION BRANCH

205 NATIONAL CENTER

12201 SUNRISE VALLEY DRIVE

RESTON VA 20192

GRB

Jenna Dunning jmdunning@usgs.gov

Jenna Dunning 703-648-7398

107/18/2022

140G0122Q0182

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

The U.S. Geological Survey, Eastern Ecological Science Center in Turners Falls, Massachusetts has a requirement to remove and replace the existing laboratory vacuum and compressed air systems, with an option to replace the regenerative blower system for the Conte Anadromous Fish Research Laboratory.

The period of performance is 120 days from issuance of Notice to Proceed.

The project magnitude is between $100,000.00 to $250,000.00.

RFQ 140G0122Q0182 will be issued on 07/18/2022 with written quotes due on

08/01/2022.

There will be a site visit held at Conte Anadromous Fish Research Laboratory, One

Migratory Way, Turners Falls, MA 01376 at 10:00AM ET, Monday, July 25, 2022. The

NAICS code is 238220 and the size standard $16.5 million. This RFQ is set-aside for small businesses.

All responsible sources may submit a bid or quotation which shall be considered by the agency. Responses may be emailed to jmdunning@usgs.gov.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 120 calendar days and complete it within ________________ ________________ calendar days after receiving

52.211-10

08/01/2022

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USGS OAG RESTON ACQUISITION BRANCH

205 NATIONAL CENTER

12201 SUNRISE VALLEY DRIVE

RESTON VA 20192

GRB

Jenna Dunning

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 35

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140G0122Q0182

Legacy Doc #: UGS

Delivery: 120 Days After Notice to Proceed

Delivery Location Code: 0006608990

Conte Anadromous Fish Lab

One Migratory Way P O Box 796

Turners Falls MA 01376-0796 US

00010 Remove and replace the existing laboratory vacuum and compressed air systems in accordance with the statement of work herein.

Period of Performance: 09/05/2022 to 01/04/2023

00020 Option Line Item

Replace Regenerative Blowers in accordance with statement of work herein.

Option may be exercised anytime within CLIN 00010 period of performance.

(Option Line Item)

01/04/2023

Period of Performance: 09/05/2022 to 01/04/2023

Please direct questions regarding this RFQ to

Jenna Dunning/jmdunning@usgs.gov. Written inquiries/questions only. Questions must be submitted up to 3 business days before the closing date of the solicitation. Questions submitted later than this may not be answered.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SECTION A. SOLICITATION/CONTRACT FORM

SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS

B.1. Contract Type

SECTION C. DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1. Statement of Work C.2. Construction Waste Management C.3. GS0339 Green Acquisition (JULY 2018) C.4. GS0347 Indoor Air Quality During Construction (MAR 2008) C.5. GS0350 Conformance with Environmental Management Systems (MAR 2016)

SECTION D. PACKAGING AND MARKING

SECTION E. INSPECTION AND ACCEPTANCE

E.1. 52.246-12 Inspection of Construction. (AUG 1996)

SECTION F. DELIVERIES OR PERFORMANCE

F.1. Performance Location F.2. 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) F.3. 52.217-8 Option to Extend Services (NOV 1999) F.4. 52.242-14 Suspension of Work. (APR 1984) F.5. GS0919 Legal Holidays F.6. Deliverables

SECTION G. CONTRACT ADMINISTRATION DATA

G.1. 52. 000S-5079 Technical Liaison - Technical Direction (OCT 1997) G.2. GS1126 Invoicing and Performance Statement Instructions (JUL 2001) G.3. GS1131 Unilateral Deobligation of Unexpended Funds (MAY 2013) G.4. GS1445 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Internet Payment Platform (IPP)

(September 2011)

SECTION H. SPECIAL CONTRACT REQUIREMENTS

H.1. GS1125 Schedule of Prices (Construction) (JUL 2001) H.2. GS1338 Notice to the Government of Delays (JUL 2001) H.3. GS1348 Accident Reporting (APR 2003) H.4. GS1354 List of Subcontractors (Construction) (JUL 2001) H.5. SECURITY REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (AUG 2016) H.6. GS1440 Wage Decision Incorporation (JUL 2001)

SECTION I. CONTRACT CLAUSES

I.1. 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017) I.2. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN 2020) I.3. 52.204-13 System for Award Management Maintenance. (OCT 2018) I.4. 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020) I.5. 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) I.6. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered

Entities. (Nov 2021) I.7. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) I.8. 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov

2021) I.9. 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) I.10. 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) I.11. 52.219-28 Post-Award Small Business Program Rerepresentation. (Sep 2021) I.12. 52.222-3 Convict Labor. (JUN 2003) I.13. 52.222-6 Construction Wage Rate Requirements. (AUG 2018) I.14. 52.222-7 Withholding of Funds. (MAY 2014) I.15. 52.222-8 Payrolls and Basic Records. (Jul 2021) I.16. 52.222-9 Apprentices and Trainees. (JUL 2005) I.17. 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) I.18. 52.222-11 Subcontracts (Labor Standards). (MAY 2014) I.19. 52.222-12 Contract Termination – Debarment. (MAY 2014) I.20. 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014) I.21. 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) I.22. 52.222-15 Certification of Eligibility. (MAY 2014) I.23. 52.222-21 Prohibition of Segregated Facilities. (APR 2015) I.24. 52.222-26 Equal Opportunity. (SEP 2016) I.25. 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) I.26. 52.222-36 Equal Opportunity for Workers with Disabilities. (JUN 2020) I.27. 52.222-50 Combating Trafficking in Persons. (OCT 2020) I.28. 52.222-55 Minimum Wages Under Executive Order 13658 (Jan 2022) I.29. 52.222-62 Paid Sick Leave Under Executive Order 13706. (Jan 2022) I.30. 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013) I.31. 52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) I.32. 52.223-6 Drug Free Workplace. (MAY 2001) I.33. 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts. (AUG 2018)

I.34. 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (JUN 2020) I.1. 52.225-9 Buy American - Construction Materials. (Nov 2021) I.2. 52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2021) I.3. 52.227-4 Patent Indemnity–Construction Contracts. (DEC 2007) I.4. 52.228-13 Alternative Payment Protections (July 2000) I.5. 52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014) I.6. 52.232-23 Assignment of Claims. (MAY 2014) I.7. 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) I.8. 52.232-33 Payment by Electronic Funds Transfer – System for Award Management. (OCT 2018) I.9. 52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013) I.10. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (Nov 2021) I.11. 52.233-1 Disputes. (MAY 2014) I.12. 52.233-3 Protest after Award. (AUG 1996) I.13. 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) I.14. 52.236-2 Differing Site Conditions. (APR 1984) I.15. 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) I.16. 52.236-5 Material and Workmanship. (APR 1984) I.17. 52.236-6 Superintendence by the Contractor. (APR 1984) I.18. 52.236-7 Permits and Responsibilities. (NOV 1991) I.19. 52.236-8 Other Contracts. (APR 1984) I.20. 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) I.21. 52.236-10 Operations and Storage Areas. (APR 1984) I.22. 52.236-11 Use and Possession Prior to Completion. (APR 1984) I.23. 52.236-12 Cleaning Up. (APR 1984) I.24. 52.236-13 Accident Prevention. (NOV 1991) I.25. 52.236-14 Availability and Use of Utility Services. (APR 1984) I.26. 52.236-21 Specifications and Drawings for Construction. (FEB 1997) I.27. 52.236-26 Preconstruction Conference. (FEB 1995) I.28. 52.242-17 Government Delay of Work (APR 1984) I.29. 52.243-5 Changes and Changed Conditions. (APR 1984) I.30. 52.244-6 Subcontracts for Commercial Items. (Jan 2022) I.31. 52.246-21 Warranty of Construction. (MAR 1994) I.32. 52.249-4 Termination for Convenience of the Government (Services) (Short Form). (APR 1984) I.33. 52.249-10 Default (Fixed-Price Construction) (Apr 1984) I.34. 52.252-2 Clauses Incorporated by Reference. (FEB 1998) I.35. 52.253-1 Computer Generated Forms. (JAN 1991) I.36. 1452.228-70 Liability Insurance (JUL 1996)

SECTION J. List of Documents, Exhibits and Other Attachments

SECTION K. REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF BIDDERS

K.1. 52.204-8 Annual Representations and Certifications. (May 2022) K.2. 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) K.3. 52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020) K.4. 52.225-10 Notice of Buy American Requirement – Construction Materials. (MAY 2014)

SECTION L. INSTRUCTIONS,CONDITIONS, AND NOTICES TO BIDDERS

L.1. 52.204-7 System for Award Management. (OCT 2018) L.2. 52.204-16 Commercial and Government Entity Code Reporting. (AUG 2020) L.3. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999) L.4. 52.233-2 Service of Protest Department of the Interior (JUL 1996) (Deviation) L.5. 52.236-27 Site Visit (Construction). (FEB 1995) – Alternate I (FEB 1995) L.6. 52.236-28 Preparation of Proposals – Construction. (OCT 1997) L.7. 52.237-1 Site Visit (APR 1984) L.8. GS2110 Appointments for Site Visits July 2001 L.9. Instructions to Offerors for the Submission of Proposals L.10. GS2320 Evaluation Factors (End of provision) L.11. 52.249-10 Default (Fixed-Price Construction) (Apr 1984)

SECTION M. EVALUATION FACTORS FOR AWARD

M.1. 52.217-5 Evaluation of Options (JUL 1990) M.2. GS2335 Evaluation and Award--Negotiated

SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS

B.1. Contract Type

Firm Fixed-Price

SECTION C. DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1. Statement of Work

Replace Vacuum and Compressed Air Systems

Introduction

The Conte Anadromous Fish Research Laboratory has a requirement to remove and replace the existing laboratory vacuum and compressed air systems, with an option to replace the regenerative blower system. The point of contact at the facility will be a Contracting Officer’s Representative (COR) appointed by a Contracting Officer (CO) with the Reston Acquisition

Branch of the USGS. A site visit will be scheduled, and attendance is highly recommended to observe the unique conditions that are present in the project area.

The Period of Performance for this contract will be 120 days from issuance of Notice to Proceed.

Background

Air and Vacuum:

The Conte Lab has four dry labs used to conduct fisheries experimentation. The lab was commissioned in 1991, the systems were sized to provide air and vacuum to four fully staffed dry labs. The compressed air system with air dryer includes a 120-gallon tank with a 10hp motor, the vacuum pump has a 120-gallon tank with a 2.4hp pump. The scope of the research has shifted, and the demand is much lower than what is provided. A downsized system will provide the capacity that is required while also saving considerable energy and space in the mechanical rooms. Both the air and vacuum systems are also beyond their service. Both units were also identified in the 2013 Condition Assessment as needing replacement.

Optional Regenerative Blowers:

This system is used to oxygenate holding tanks in the aquarium. It is currently mounted on the wall in the same mechanical room as the other equipment included here. The blowers are set up as a duplex system, but if one fails the other one must be started manually. One blower is beyond its service life and the other is oversized. The new system will feature two properly sized blowers mounted on an adjacent wall with check valves and inlet air filters, and a fail-safe system to start one pump in case the other one fails.

Scope of Work

Air and Vacuum:

• Accessibility: The equipment is in the second-floor mechanical room of the Research Lab Building. The only indoor access to the room is via a metal stairway from the first-floor mechanical room, which contains sensitive equipment and restricted access points that make moving the required equipment in and out extremely difficult. The second-floor mechanical room has double doors adjacent to the equipment which lead to the roof. The required method of removing the existing equipment and delivery of new equipment is with a crane.

• Existing air compressor and vacuum pump will be demoed and broken down into components which can be man-handled to the roof and removed with a crane for recycling. Unused concrete spring mounted isolating pad will be removed by crane and stored by facility staff for use elsewhere.

• New pump and compressor will be mounted on existing concrete spring isolated pads. Pads will be rotated 90 degrees and anchored as close as possible to outside wall while still ensuring safe working clearances and access for maintenance.

• Compressor and vacuum pump will be connected to existing piping.

• Compressor and vacuum pump will be connected to existing power sources.

• Both units will be tested for leaks and test reports completed.

• Mechanical room will be cleared of debris.

Optional Regenerative Blowers:

• Existing regenerative blowers will be removed and delivered to facility staff for storage or use elsewhere.

• Framework for blowers and electrical equipment will be demoed.

• Piping and wiring will be relocated from south wall of mechanical room to east wall.

• New stand for blowers will be provided by contractor and securely fastened to wall and floor.

• Blowers will be connected to existing power sources.

• New blowers, piping will be installed, including check valves and pressure switch.

• Adjustable pressure relief valve, pressure gauge and bleed valve will be installed on supply pipe.

Applicable Documents

• Contractor will provide a detailed safety plan in digital and hard copy form for all phases of the project, including plan to protect their staff from injury and to restrict access by facility personnel using barriers and signage. Plan must be approved by COR.

• Contractor will provide specifications of compressor with air dryer and vacuum pump including dimensions and capacity.

• Contractor will provide detailed technical approach with bid package. All logistics will be detailed including removing existing equipment, delivering, and installing new equipment to mechanical room.

• All personnel performing this work need to be licensed in the Commonwealth of Massachusetts if required. All hoisting and material handling equipment must have valid inspection stickers and be operated by trained and licensed personnel.

Technical Requirements

Compressor Specifications:

• Commercial grade 5-HP 53-Gallon Rotary Screw Air Compressor w/Dryer, 460V 3-Phase 150PSI with continuous

100% duty cycle, integrated refrigerated air dryer, high efficiency electric motor, high efficiency air cooling system, integrated oil separator. Must generate minimum of 16 cfm. Noise attenuating enclosure with decibel rating no higher than 80dBA.

• Vacuum Pump Specifications: Medical grade Simplex vacuum system with single 15 cfm oil-lubricated, air-cooled rotary vane vacuum pump, 60-gallon tank,460V 3-phase, ¾” inlets/outlets, fully adjustable vacuum switches.

Optional Regenerative Blower Specifications:

• Sweetwater S-453-C or better, but specifications must match exactly.

• Pressure relief and bleed valve assemblies must allow for easy, tool-free field adjustments.

Worksite Specifications:

• All debris from demolition and construction must be removed daily or stored in an approved rubbish container and removed from the site at or before completion of the project. All recyclable materials must be delivered to a processing facility.

• All new wiring must be protected by metallic or flexible conduit and securely attached. Equipment must be properly grounded, wiring sized for amperages present, all connections to equipment to exact manufacturer’s specification.

• All work must meet reasonable standards for fit and finish. Piping will be plumb and level and fastened securely using proper hardware. All equipment and accessories will be neat and organized. Layout of equipment will be determined by consulting with COR, any changes must be authorized in advance.

• Extreme care must be taken to prevent damage to the roof or any part of the structure while moving equipment. Roof should be protected by plywood sheets in staging area.

Deliverables

• All work will be inspected and approved by the COR before the task is considered completed. Contractor will repair any deficiencies in materials or workmanship at their cost. The contractor will provide verbal progress reports to the COR or other representative authorized by Contracting Officer at regular intervals during the period of performance. Any delays or cost overruns will be communicated to the COR as soon as they are encountered. The customer reserves the right to have the project inspected for integrity and quality of workmanship by a third-party, including county electrical, plumbing, and building inspector.

• Any damage caused by contractor to facility will be repaired at their expense.

• The project will be considered completed and authorized for payment only when approved by the COR.

• All material and equipment are to be provided by the contractor. No tools, equipment or manpower will be provided by the facility. No government employees will assist contractor with unloading, installation or positioning of materials or equipment. Equipment may be stored in designated areas during the period of performance, but the facility assumes no liability against loss or theft.

• The contractor will complete the project within the period of performance (POP), any delays must be authorized in writing by the CO. Work may be stopped to avoid interfering with research projects. The work will be staged to allow access to the facility throughout the period of performance. Proper signage and barriers will be provided to restrict vehicle and pedestrian access to work areas and no hazardous conditions should be present in unguarded areas. All work must be performed during normal business hours, Monday-Friday 7:00 am to 4:00 pm. No weekend work may be performed unless authorized by COR. No work may be performed on Federal holidays without exception.

Site Pictures and Details on Equipment

C.2. Construction Waste Management

1. The Offeror shall maintain a recycling program to dispose of or recycle construction waste. Recycling construction waste means providing all services necessary to furnish construction materials or wastes to organizations which will employ these materials or wastes in the production of new materials. Recycling includes required labor and equipment necessary to separate individual materials from the assemblies of which they form a part. The program shall cover the following requirements:

a) The contractor shall provide continuous facilities for the recycling of incidental construction waste during initial construction.

b) Products may be excluded from the recycling program when the small quantity of material involved, the extraordinary complex nature or the waste disposal method, or prohibitive expense for recycling would represent a general hardship.

c) Records of construction materials recycled shall be maintained and accessible to the Contracting Officer. Records shall include materials recycled or land filled, quantity, date, and identification of hazardous wastes.

d) If any waste materials encountered during the demolition (construction) phase are found to contain mercury, radioactive materials or other harmful substances, they are to be handled and removed in accordance with State and Federal laws and requirements concerning hazardous waste

(End of clause)

C.3. GS0339 Green Acquisition (JULY 2018)

The USGS is committed to promoting the natural environment and protecting the health and well-being of people. In the performance of work under this contract, the Contractor shall exert its best efforts to provide services in a manner that will promote the natural environment and protect health and well-being. Green purchasing or environmentally preferable contracting includes the initiatives described below:

Alternative Fuels and Vehicles are described at http://www.afdc.energy.gov/afdc/

Biobased Products are described at http://www.biopreferred.gov/

Energy efficient products are described at http://energystar.gov/products for Energy Star products and at http://www.eere.energy.gov/femp/procurement for FEMP designated products.

Environmentally Preferable Computers are described at http://www.epeat.net

Significant New Alternatives Program (SNAP) are described at http://www.epa.gov/snap/overview-snap

The Comprehensive Procurement Guidelines promote the use of recovered and recycled products at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program

Water efficient products and services are described at https://www.epa.gov/watersense

(End of clause).

C.4. GS0347 Indoor Air Quality During Construction (MAR 2008)

(a) The contractor shall control contaminants at the source and/or operate the space in such a manner that the GSA indicator levels for carbon monoxide (CO), carbon dioxide (CO2 ), and formaldehyde (HCHO) are not exceeded. The indicator levels for office areas shall be:

CO - 9 parts per million (ppm) time-weighted average (TWA - 8-hour sample);

CO2 - 1000 ppm (TWA);

formaldehyde - 0.1 ppm (TWA).

(b) The contractor shall make a reasonable attempt to apply insecticides, paints, glues, adhesives, and heating, ventilating and air conditioning (HVAC) system cleaning compounds with highly volatile or irritating organic compounds, outside of working hours. The contractor shall provide at least 72 hours advance notice to the Government before applying noxious chemicals in occupied spaces, and adequately ventilate those spaces during and after application.

(c) To the greatest extent possible, contractor shall sequence the installation of finish materials so that materials that will be high emitters of Volatile Organic Compounds (VOCs) are installed and allowed to cure before installing interior finish materials, especially soft materials that are woven, fibrous, or porous in nature, that may adsorb contaminants and release them over time.

(d) Where demolition or construction work occurs adjacent to occupied space, contractor shall erect appropriate barriers

(noise, dust, odor, etc.) and take necessary steps to minimize interference with the occupants. This includes maintaining acceptable temperature, humidity and ventilation in the occupied areas during window removal, window replacement, or similar types of work.

(e) A final flush-out period of 48 to 72 hours should be provided before occupancy. Contractor shall ventilate with 100 percent outside air at the recommended air change rate (ASHRAE Standard 62) during installation of materials and finishes.

If outside air would cause unacceptable inside temperature levels, humidity levels, and/or air quality, an alternate ventilation plan may be submitted to the Contracting Officer for approval.

(f) The contractor shall promptly investigate indoor air quality (IAQ) complaints and shall implement the necessary controls to address the complaint when requested to do so by the Contracting Officer.

(g) The Government reserves the right to conduct independent IAQ assessments and detailed studies in space it occupies, as well as in space serving the Government-leased space (e.g., common use areas, mechanical rooms, HVAC systems, etc.). The contractor shall assist the Government in its assessments and detailed studies by making available information on building operations and contractor activities, and providing access to space for assessment and testing, if required, and implement corrective measures required by the Contracting Officer.

C.5. GS0350 Conformance with Environmental Management Systems (MAR 2016)

a. The Contractor’s work under this contract shall conform with all operational controls identified in the applicable agency, organization, or facility environmental management system (EMS) and provide monitoring and measurement information as necessary for the Government to address environmental performance relative to the environmental, energy, and transportation management goals.

b. In the event the Contractor identifies an environmental nonconformance or noncompliance associated with the work under the contract, the Contractor shall notify the Contracting Officer immediately. The Contractor will be required to take corrective and/or preventative actions at the direction of the Contracting Officer in the form of a contract modification and in coordination with the EMS Site Coordinator.

c. The Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the EMS and how these requirements affect the work performed under this contract.

d. Whether on-site contractor personnel shall complete EMS training is at the discretion of the Contracting Officer, appropriate for the type of work under the contract, at no cost to the Contractor. Notification of the training schedule will be provided by the Contracting Officer's Representative in coordination with the facility-level EMS Coordinator.

SECTION D. PACKAGING AND MARKING

Section intentionally left blank

SECTION E. INSPECTION AND ACCEPTANCE

E.1. 52.246-12 Inspection of Construction. (AUG 1996)

SECTION F. DELIVERIES OR PERFORMANCE

F.1. Performance Location

U.S. Geological Survey

Conte Anadromous Fish Lab

One Migratory Way P O Box 796

Turners Falls MA 01376-0796

F.2. 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days after notice to proceed. The time stated for completion shall include final cleanup of the premises.

F.3. 52.217-8 Option to Extend Services (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of

Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 6 months from date of award.

(End of clause)

F.4. 52.242-14 Suspension of Work. (APR 1984)

F.5. GS0919 Legal Holidays

The following legal holidays are observed by this Government agency:

New Year's Day January 01

Martin Luther King's Birthday 3rd Monday in January

Presidents Day 3rd Monday in February

Memorial Day Last Monday in May

Juneteenth June 19

Independence Day July 04

Labor Day 1st Monday in September

Columbus Day 2nd Monday in October

Veterans Day November 11

Thanksgiving Day 4th Thursday in November

Christmas Day December 25

When a holiday falls on Saturday or Sunday, it is observed on the adjacent Friday or Monday, respectively.

In addition to the holidays listed above, the contractor agrees to observe leave days or closures designated by

Federal Statute, Executive Order, or Presidential Proclamation.

F.6. Deliverables

Deliverable Reference Due Deliver To

All supervision, labor, materials and equipment necessary to construct all items described in contract documents.

Contract Documents NTP + See clause

52.211-10

USGS

Payment Protection Section I: 52.228-13 Within 10 days after contract award

CO

Proof of Liability

Insurance

Section I: 1452.228-70 Within 10 days after contract award

CO

Schedule of Prices Section H: GS1125 Within 10 days after contract award

CO and COR

List of Subcontractors Section H: GS1354 Within 10 days after contract award

CO and COR

SF-1413 Statement and

Acknowledgment

(including the subcontractor’s signed and dated acknowledgment that the clauses set forth in paragraph (b) of FAR

52.222-11 have been included in the subcontract)

Section I: 52.222-11

The contractor is required to submit statement and acknowledgement to the Contracting Officer on the

Standard Form (SF) 1413 available at http://www.gsa.gov/portal/forms/download/115794

Within 10 days after award of this contract and within

10 days after the award of each subcontract thereafter.

CO

Weekly Payrolls for contractor and each subcontractor

Section I: 52.222-8

The contractor is required to submit copies of all payrolls. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. This information may be submitted in any form. The optional form WH-

347 from the Department of Labor may be used and is available at:

http://www.dol.gov/whd/forms/wh347.pdf

Within 10 days after regular payment date of the payroll week covered

CO

Ref: FAR

22.406-6(c) for examination of payrolls and statements.

Further compliance checking may be done IAW

FAR 22.406-7.

Invoices Section G: DOI Electronic Invoicing

Section G: GS1126

No more often than monthly

IPP Web Page and copy to

COR

Certification of Progress

Payment (if requesting progress payment)

Section I: 52.232-5 As work proceeds – no more often than monthly

COR

SECTION G. CONTRACT ADMINISTRATION DATA

G.1. 52. 000S-5079 Technical Liaison - Technical Direction (OCT 1997)

(a) The performance required herein shall be subject to the technical direction of the Technical Liaison (TL) as identified http://www.dol.gov/whd/forms/wh347.pdf below. As used herein, "technical direction" is defined as direction to the contractor that fills in details, suggests possible lines of approach, or otherwise supplements the scope of the work set forth herein and shall not constitute a new assignment, and does not supersede or modify any article or clause of this contract.

(b) The Technical Liaison is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government. Only a warranted Contracting Officer is authorized to obligate funds on this or any other contract action.

(c) The contractor shall immediately notify the Contracting Officer in writing if the Technical Liaison has taken an action (or fails to take action) or issues direction (written or oral) that the contractor considers to exceed the above limitations.

(d) The Technical Liaison assigned for this contract is:

Name: TBD at time of contract award

Telephone Number:

Email:

(e) Only the Contracting Officer may designate a different Technical Liaison.

(End of Clause)

G.2. GS1126 Invoicing and Performance Statement Instructions (JUL 2001)

(a) A copy of each invoice submitted with an IPP payment request must be submitted to:

U.S. Geological Survey

Conte Anadromous Fish Lab

One Migratory Way P O Box 796

Turners Falls MA 01376-0796

(b) Invoices for progress payments may be submitted no more frequently than monthly.

(c) Invoices for progress payments must be accompanied by a contract Performance Statement, which shall show in detail the estimated percentage of completion and value of completed performance for each separately priced line item or, if applicable, each of the significant construction categories contained in the approved Schedule of Prices.

(d) See clause 52.232-5 for certification requirements.

G.3. GS1131 Unilateral Deobligation of Unexpended Funds (MAY 2013)

The contractor shall submit all invoices under the award no later than 90 calendar days after the period of performance has expired, unless a request for extension has been submitted to the Contracting Officer. After 120 days has passed since the expiration of the performance period, the government reserves the right to issue a unilateral modification deobligating any unexpended funds, and to initiate closeout procedures.

G.4. GS1445 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Internet

Payment Platform (IPP) (September 2011)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Internet Payment Platform

System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

Standard commercial invoice

The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor

Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal

Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

SECTION H. SPECIAL CONTRACT REQUIREMENTS

H.1. GS1125 Schedule of Prices (Construction) (JUL 2001)

In accordance with the clause FAR 52.232-5, Payments under Fixed-Price Construction Contracts, the contractor shall, within 10 days after receipt of notice of award, submit to the Contracting Officer for approval, a Schedule of Prices. This schedule shall consist of a detailed breakdown of the contract price, segregated under each of the significant construction categories. It shall state the quantities for each of the various types of work, the unit prices, and extended totals.

Subcontractors who may be involved in more than one category of work must provide the same breakout data for each category. The submission of the required data shall not otherwise affect the contract terms.

H.2. GS1338 Notice to the Government of Delays (JUL 2001)

In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the contracting officer and the COR, in writing, giving pertinent details. This data shall be informational only in character.

Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or of any rights or remedies provided by law or under this contract.

H.3. GS1348 Accident Reporting (APR 2003)

If an accident occurs on Government-controlled facilities, a report must be provided to the Contracting Officer's

Representative and the Contracting Officer within 48 hours. An accident is defined as an event which causes injury, illness, or loss or damage to Government-owned or private property. The contractor will cooperate with any ensuing Government accident investigation.

H.4. GS1354 List of Subcontractors (Construction) (JUL 2001)

For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a listing of all subcontractors to the Contracting Officer within 10 calendar days after contract award.

H.5. SECURITY REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (AUG 2016)

(a) All Contractor employees must have an "Enter on Duty" (EOD) approval issued by the Bureau Personnel Security Office

(PSO) before they begin performing work on any Bureau contract. The Contractor must ensure that all employees requesting an EOD are citizens of the United States of America, or an alien who has been lawfully admitted for permanent residence or employment (indicated by immigration status) as evidenced by Immigration and Naturalization Service documentation and the employee must have resided in the United States for a minimum of 3 years. The EOD may be issued in advance of a completed Background Investigation and may be rescinded by the PSO at any time. However, all contractors who require network access are required to complete the identity proofing process, and must be able to obtain a successfully adjudicated

National Criminal History Check (NCHC) and National Agency Check with Inquiries (NACI) or higher to stay on the contract.

(b) Starting Work - Contractor employees with an approved EOD may begin performing unsupervised work on Bureau contracts. To remain on the contract, the Contractor employees will need a completed favorable Background Investigation.

(c) Rescission of EOD - The PSO may rescind the EOD at any time. This may occur as the result of additional information obtained or the final results of the background investigation.

(d) Background Investigation - Contractor employees who will have unsupervised access to Bureau facilities, access to the

Department of the Interior (DOI) information technology (IT) systems or DOI data, or will develop custom applications, must have a favorably adjudicated background investigation from the Office of Personnel Management (OPM). Existing clearances at the same or higher level are acceptable upon the PSO’s review and approval. If the employee does not already have a complete investigation, they must apply for one. The employee may begin work with an EOD, but must receive a favorable background investigation to continue working on the contract. The background investigation includes obtaining fingerprints through a USAccess Credentialing Center for an FBI criminal history and a credit report. Once the investigation has been scheduled by OPM, the Bureau will receive advance reports. If those reports are favorable, the Bureau PSO will issue the EOD. The type of background investigation required is based on the risk/sensitivity level designation. Citizenship requirements and guidance for determining the appropriate type of background investigation required for the designated risk/sensitivity level are contained in DOI Departmental Manual (DM) Part 441. The DM is available on the Internet at http://elips.doi.gov/app_home/index.cfm?fuseaction=home.

(e) Electronic Questionnaire for Investigations Processing (e-QIP) – The Bureau uses the e-QIP for all background investigations or reinvestigations. To initiate an investigation, the Contractor, in collaboration with the COR, will complete an e-QIP Request Form. This request form is available through the COR. The COR will submit the completed request form to the Bureau PSO. The PSO will enter the information into e-QIP to either establish a new applicant profile or determine if an existing investigation that meets Bureau requirements is on file. The PSO will then contact the applicant to provide additional information and instructions. Generally, the Contractor is required to complete the following forms:

e-QIP application (on-line)

Fair Credit Release

OF-306

Fingerprints via USAccess Credentialing Centers

The Contractor shall complete the required background investigation forms and submit them to the PSO. The PSO shall determine if individuals meet the required background investigation standards and citizenship requirements, and then make a suitability determination. Minimum standards used in suitability determinations are contained in the DOI Departmental

Manual Part 441. The Government will pay for any background investigations required for contractor employees. If the

Contractor employee’s background investigation is returned as unfavorable, the Government reserves the right to request reimbursement of the actual costs for the investigation from the Contractor.

(f) Reinvestigation - Contractor employees occupying high risk public trust positions must be reinvestigated every 5 years. A reinvestigation may be initiated prior to the normal periodic reinvestigation schedule when an individual’s continued ability to meet the minimum background investigation standards is in question. The electronic fingerprints on file in the USAccess system will be electronically submitted to OPM for the reinvestigation. The PSO shall review the records and documentation and make the suitability determination.

(g) Disputes - In the event of a disagreement between the Contractor and the Government concerning the suitability of a particular employee to perform work under this contract, the Government has the right of final determination. Determinations under this requirement are subject to the Disputes Clause, FAR 52.233-1. Failure of the Contractor to comply with the requirements of this clause could constitute grounds for termination for default.

(h) Physical Security Requirements - DOI Access Cards.

(1) Contractor employees must have a DOI Access Card before being given unsupervised access to a Government facility.

(2) To gain unsupervised access to Government facilities, Contractor employees must present their DOI Access Card for examination by the security guard or electronically authenticate their DOI Access Card, as required. Contractor employees must keep their DOI Access Card in a shielded card holder, and visually display the card at all times while in the facility.

Refusal or repeated neglect to display the DOI Access Card may result in limiting Contractor employee’s access to

Government facilities or revoking of authorized access.

(3) When a Contractor employee is no longer working under this award, the Contractor is responsible for returning all DOI

Access Cards, keys, and other Government property issued to that employee. The Contactor shall coordinate all returns with the COR. The COR is responsible for ensuring the Contractor complies with these requirements. However, failure by the

Contractor to comply with these requirements may result in the Contractor’s liability for all costs associated with correcting any resultant breech in building security.

(i) Issuance & Maintenance - DOI Access Cards

(1) Process: To obtain a DOI Access Card the COR will use the online DOIAccess System to initiate the access request.

Contractor employees will receive email notificat ions to enroll at a USAccess Credentialing Center with two forms of identification, and after adjudication, a second email notification to pick up and activate their DOI Access Card. The Contractor employee shall schedule an enrollment appointment at a USAccess center at least two weeks prior to the targeted EOD.

(2) Contractor Responsibilities: Contractor employees must complete actions in a timely manner to prepare for on-boarding and access to DOI network resources. The Contractor shall allow their personnel sufficient time to schedule and attend an enrollment appointment at the USAccess center prior to the contract start date. If the Contractor employee’s DOI Access

Card becomes lost or stolen, the contractor employee shall notify the COR immediately to request a new DOI Access Card.

(3) COR Responsibilities: The COR (or designated individual) and Contractor shall maintain a listing of all Contractor employees who received a DOI Access Card, the date the card was issued, the date the electronic certificates expire (3 years from issue date), and the date the DOI Access Card expires (5 years from issue date). If the Contractor employee’s DOI

Access Card or certificates will expire before the contract is completed, the COR (or designated individual) and Contractor is responsible for ensuring that the Contractor employee visits a USAccess center to update certificates on the existing card or obtain a new DOI Access Card. No later than one week prior to the DOI Access Card’s certificate or card expiration, the

COR (or designated individual) shall notify the Contractor that DOI Access Card actions are required. The COR (or designated individual) and the Contractor shall update their listing to reflect the new issue date, certificate expiration date and card expiration date.

(j) Information Technology Security Requirements.

(1) Training – If contractor employees require access to any DOI/IT systems, the Contractor shall ensure its employees complete all Bureau/DOI required IT security training. The Contractor’s employees shall complete this training before being granted access to Bureau/DOI data or being issued network access. The current training requirements are: (i) annual end-user

IT Security Awareness, (ii) annual IT Resources Rules of Behavior, and (iii) annual…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .