EMERGENCY FENCING INSTALLATION Federal contract opportunity
Solicitation number
140A2322Q0184
Issued by
Department of the Interior Bureau of Indian Affairs Bureau of Indian Education

View the file

Other files for this federal contract opportunity

Other files attached to EMERGENCY FENCING INSTALLATION, newest first.
File Type Posted
Attachment_A_-_Wage_Rates.pdf PDF
Attachment_B_-_Question_Log_A.xlsx XLSX spreadsheet
Attachment_C_-_Map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040568004

Indian Education Acquisition Office

1011 Indian School Rd.

Suite 352A Albuquerque NM 87104

A23

Mary Jane Johnson 5058034259

103/02/2022

140A2322Q0184

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

THIS IS A SOLICITATION REQUESTING FOR A QUOTE FOR A FIRM FIXED PRICE CONTRACT FOR

THE INSTALLATION OF FENCING AT NENAHNEZAD COMMUNITY SCHOOL IN FRUITLAND, NEW MEXICO.

THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, SUPERVISION AND INCIDENTALS

NECESSARY IN ACCORDANCE WITH THE STATEMENT OF WORK.

- SECTION A - CONTRACT FORM

- SECTION B - SUPPLIES OR SERVICES AND PRICES

- SECTION C - DESCRIPTION AND SPECIFICATIONS

- SECTION D - PACKAGING AND MARKING

- SECTION E - INSPECTION AND ACCEPTANCE

- SECTION F - DELIVERIES OR PERFORMANCE

- SECTION G - CONTRACT ADMINISTRATION DATA

- SECTION H - SPECIAL CONTRACT REQUIREMENTS

- SECTION I - CONTRACT CLAUSES

- SECTION J - LIST OF ATTACHMENTS

- SECTION K - RESPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR

RESPONSENTS

- SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONSDENTS

- SECTION M - EVALUATION FACTORS FOR AWARD

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

3 5 calendar days and complete it within ________________ ________________ calendar days after receiving

03/09/2022

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Indian Education Acquisition Office 1011 Indian School Rd.

Suite 352A Albuquerque NM 87104

A23

Mary Jane Johnson

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 67

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140A2322Q0184

THIS IS A SMALL BUSINESS ASIDE.

IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE

MAGNITUDE OF CONSTRUCTION PROJECT IS ESTIMATED

SHOULD BE INT HE FOLLOWING PRICE RANGE OF (B)

BETWEEN $25,000.00 TO $100,000.00.

DUNS NUMBER: _______________________

Contractor to install 8 foot tall 9 gauge fencing around the transportation port and GSA parking areas inclusive of gated entry accesses identified to deter theft and vandalism.

Legacy Doc #: IA

Delivery: 02/28/2022

Delivery Location Code: 0009061922

BIE NENAHNEZAD COMM SCHOOL

PO Box 337

Off County Road 6675

FRUITLAND NM 87416 US

FOB: Destination

Period of Performance: 03/14/2022 to 03/31/2022

00010 Labor/Material/Equipment Cost

Product/Service Code: R499

Product/Service Description: SUPPORT-

PROFESSIONAL: OTHER

Period of Performance: 02/17/2022 to 02/28/2022

00020 NN Business Activity Tax

Product/Service Code: R499

Product/Service Description: SUPPORT-

PROFESSIONAL: OTHER

Period of Performance: 02/17/2022 to 02/28/2022

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SOLICITATION NO.: 140A2322Q0184

CONSTRUCTION OF FENCE INSTALLATION

SECTION B: PRICE SCHEDULE

B.1 INSTRUCTION TO OFFERORS

A. The offer takes into consideration amendments, call addendum, to the plans and specifications, the receipt of which is acknowledged in the space provided on the reverse side of the Solicitation, Offer, and Award, Standard Form 1442.

B. Contract Award: Award will be made against the Department of the Interior (DOI), Bureau of Indian Education (BIE), Office of Acquisitions. Award will be made to the lowest priced offeror, who's quote conforming to the requirements herein, will be most advantageous to the Government, and is fair and reasonable. This will be a Fixed Price Contract. Thus, the Government reserves the right to make award to the lowest price quote that is in the best interest to the Government.

C. The offerors shall include in the line items: The solicitation requires submission of a proposal all line item, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is available, offerors should insert the words "no proposal" in the space provided for any item on which no price is submitted.

B.2 REQUIRED WORK

The proposed work consists of furnishing all labor, materials, equipment, and incidentals necessary for the pavement of the north parking lot at Nenahnezad Community School in Fruitland, New Mexico, in the accordance with the Statement of Work.

Period of Performance: 5 Calendar days from the issuance of the Notice to Proceed. (lead time on materials will be considered)

B.3 PROJECT LOCATION Project is located at Nenahnezad Community School in Fruitland, New Mexico.

B.4 OFFEROR’S SCHEDULE

OFFEROR’s SCHEDULE

The Offeror must be submitted a complete breakdown of your total price please include the Unit Price Schedule (included but not limited to all supplies, materials, and transportation of materials needed to complete each job).

DIV ITEM UNIT PRICE UNIT TOTAL PRICE

1. Materials $ 1 Job = $

2. Labor $ 1 Job = $

General Contractors Profit: $

Subtotal: $

Navajo Nation (6%)Taxes: $ _____________________________

All Applicable Taxes: $

TOTAL: $ _____________________________

B.5. Miscellaneous Work: The contractor shall not perform any of contingent sum work, until the Contracting Officer issues a contract modification authorizing performance of work in accordance with FAR Clause 52.243-04, Changes, and FAR Clause 52.243-05, Changes and Changed Conditions; and subject to availability of funds, FAR Clause 52.232-18, Availability of Funds.

The Contractor shall promptly notify the Contracting Officer, in writing, of subsurface or any physical conditions from those indicated in this contract or unknown unusual physical conditions at the site before proceeding with the work.

The change orders request shall be forwarded to the Contracting Officer by memorandum outlining the need and a justification for the change order. Upon receipt of a change order request, the Contracting Officer will request a cost proposal from the Contractor. All cost proposals shall be in detail and itemized, showing price breakdown in sufficient detail to permit an analysis of cost for material, labor, equipment, hours, taxes, insurance, bonds, overhead costs, profit, and complete description of work involved in the change order, including any time extension.

In an emergency, a telephone approval may be granted by the Contracting Officer, and immediately the Contractor shall follow through by submitting a written cost proposal to the Contracting Officer. The Contracting Office will issue a contract modification to authorize the work for the "emergency".

Scope of Work Nenahnezad Community School

Project No. D32N06-001 Navajo North Agency

Fruitland, New Mexico

STATEMENT OF WORK:

The statement of work is for emergency installation of 8 foot tall 9 gauge fencing around the transportation port and GSA Parking areas inclusive of gated entry accesses identified to deter theft and/or vandalism.

1.01 Site Location: The project is located within the Fruitland, New Mexico, on San Juan, County, and approximately 15 miles west of Farmington, New Mexico off County Road 6675.

School Address:

Nenahnezad Community School P.O. Drawer 337 Fruitland, New Mexico 87420

BIA Contacts:

COR, Sandra Ahasteen, Arizona Navajo North Agency Facility Manager, Telephone Number (505) 368-3484 Principal, David Smith, Nenahnezad Community School, Telephone Number (505) 960-6922 CO, Mary Jane Johnson, BIE Acquisitions, Telephone Number (505) 803-4259

1.02 Scope of Work:

The Contactor shall furnish and pay for all supervision, labor, equipment, materials, insurance, New Mexico Gross Receipt taxes, Navajo Nation Business Activity taxes, transportation/mobilization, and other necessary incidentals in accordance with the attached SOW. Contractor will be responsible to pay for all local, State and Navajo Nation permits for construction.

The Statement of Work (SOW) is as follows and may not be in sequential order:

1. Install 186 feet of 8 foot high 9 gauge fencing around bus port

2. Install 6 foot gate access to the bus port.

3. Install 5 foot 3 inch gate access to the bus port

4. Install 4 foot 2 inch gate access to the bus port

5. Install 258 feet of 8 foot high 9 gauge fencing around GSA parking lot

6. Install 7 foot 4 in gate access to GSA parking lot

7. Install double access gate to the GSA parking lot

8. General clean up after work completion.

9. Procure and maintain during the term of the contract, liability insurance. The Contractor shall name the

United States, Bureau of Indian Affairs (BIA) as insured parties of liability insurance policy.

10. Prospective Contractor and/or it’s representatives are required to make a site visit prior to bidding the project to verify lineal footages, square footages, types of repairs, etc.

PART 2 - SPECIFIC REQUIREMENTS:

1. NAVAJO NATION AND STAT OF NEW MEXICO TAXES:

The Contractor is responsible and required to pay the Navajo Nation Business Activity Tax equal to 5 percent of their total bid amount. In addition, local and state gross receipt taxes shall be paid by the Contractor.

2. DELIVERY REQUIREMENTS AND PERIOD OF PERFORMANCE

Period of performance will be 5 calendar days from Notice to Proceed.

3. CONSTRUCTION INSPECTION AND FINAL ACCEPTANCE REQUIREMENTS:

Construction inspection will be conducted by the School, BIA Navajo Region and Northern Navajo Agency Office Representative.

Upon completion of the project, a final inspection will be performed. At that time, the entire system will be accepted or rejected based on completion, materials, workmanship. The Contractor shall notify in writing the Contracting Officer (CO) in three days prior to the final inspection.

4. CONTRACTORS MINIMUM QUALIFICATION:

General Contractor or Subcontractor performing the actual work must have a least a minimum of 5 years’ experience on the above listed SOW items.

5. TEMPORARY SERVICES:

Construction Water Services:

Existing water services near the site is available. Contractor is required to pay foe and provide water by means of metering for construction use and testing. Contractor shall make arrangements with the Navajo Nation Water Code Administration office to pay for water use.

Sanitary Facilities: The Contractor shall provide and maintain necessary sanitary conveniences for the use of those employed on or about the work. The sanitary facilities shall be properly secluded from public observation and be at such locations as approved by the Government Project COR; and their use shall strictly be enforced. Sanitary conveniences shall be fully enclosed and properly ventilated. Chemical toilets may be used. The premises shall be kept in a neat and sanitary conditions at all times.

6. CONTRACTOR MUST BE LICENSED IN ANY STATE:

Provide a copy of Contractor’s License to the COR.

7. LIQUIDATED DAMAGES:

Liquidated damages will be assessed in the amount of $100 for each calendar days of delay beyond the time of completion stated in the contract, until the work is determined by the Contracting Officer to be substantially completed. Payments to the Contractor shall be based on a monthly basis for completed contract performance upon inspection and acceptance by the Contracting Officers Representative (COR).

8. RELEASE OF CLAIMS:

After completion of work and prior to final payment, the Contractor shall furnish to the Contracting Officer a Release of Claims against the United States arising out of the contract other than claims specifically accepted from the operation of the release.

9. SCHEDULE OF WORK:

The Contractor is required to pursue the contract performance in accordance with an approved work schedule. The Contractor shall prepare and submit a schedule in which is described, a method and time sequence necessary to complete the work. All work scheduling shall be subject to the approval of the COR and CO.

10. WARRANTY OF CONSTRUCTION:

Except as otherwise expressly provided in this contract, the Contractor shall remedy at it’s own expense any failure of the work (including equipment) to conform to the contract SOW and any defect of materials, workmanship, provided that the Government gives the Contractor notice of any such failure or defect promptly after discovery, but no later than One-Year-after final acceptance of the work.

Should the Contractor fail to remedy such failure or defect within a reasonable time after receipt of notice thereof, the Government shall have the right to replace, repair or otherwise remedy such failure of defects at the Contractor’s expense.

11. DEBRIS DISPOSAL:

The Contractor owns all debris generated by or caused by the work in this contract. The Contractor bears all responsibility and all costs connected with or related to the removal and disposal of all debris from properties of the United States Government. The Contractor is required to comply with applicable Environmental Protection Agency (EPA) regulations, Federal, State, and local Government laws and regulations while engaged in the removal and disposal of debris. The Contractor shall remove the debris off the boundaries of Nenahnezad Community School to an EPA approved landfill. The Government is not responsible in any way, financial or otherwise, for the success or failure of arrangements for disposal of debris between the Contractor and other parties.

12. HOURS AND DAYS OF WORK:

Except in executive, administrative, and supervisory positions, no individual directly employed on the project may be permitted to work more than 40 hours in any work week. The Contractor shall submit the Contracting Officer the name and legal address of each foreman to be employed upon the work prior to their entrance on duty. The Forman will not be affected by the 40 hours week provisions above so long as their duties are strictly supervisory or administrative, but any foreman working with tools and performing the duties of a journeyman or mechanic or engaged in manual labor will be limited by the above provisions notwithstanding that they may work only a portion of the hours as a journeyman or mechanic or a manual labor. The performance time allowed under this contract is based on a five-day week, eight hours per day, Monday through Friday. Accordingly, construction work requiring inspection by the Government personnel generally will not be permitted on Saturday, Sundays, or holidays. Also, on those days recognized as legal holidays for Government employees, construction work requiring Government inspection generally will not be permitted.

In situations which can be justified to the satisfaction of the Contracting Officer and his authorized representative, work more than 40 hours per week and/or on the above-mentioned weekends and holidays may be requested by the Prime Contractor. However, the contract contemplates holding overtime to an absolute minimum. Additional funding to cover overtime expense incurred by the Contractor will not be approved. Bid proposal shall be based on this understanding.

13. CONTRACT SAFETY PROGRAM REQUIREMENTS:

Each construction contract issued by the Government shall include the following requirements, as minimum to establish a Contractor safety program.

Safety Program Submittal:

Within three (3) days following the awarding of the contract, the Contractor shall submit in writing to the COR and CO for approval a proposed comprehensive safety program. The Contractor’s Safety Program should detail policies, procedures and plans that will be implemented to ensure the safety and health of employees and visitors at the job site. The Contractor should prepare a list of major hazards associated with the contract work and provided in the safety program means to minimize the hazards. The safety program shall include an emergency notification plan in the event of an accident to include Local Agency and Regional Personnel.

14. PRECONSTRUCTION SAFETY MEETING:

Representatives of the Contractor shall meet the COR, Agency Project Inspection and Agency Safety Officer prior to the state of construction to review the Safety Program and discuss implementation of health and safety provisions pertinent to the work under the Contract. The Contractor should be prepared to discuss in detail the measures to be taken to control the hazards incident to the major phases of the work under contract. This meeting shall be devoted mainly to a discussion of the way the Contractor intends to administer the Health and Safety Program, and delegation and a determination of what shall be presented in the written safety program.

15. BARRICADES:

The Contractor shall furnish and install all necessary barricades, fences, guards, or other temporary protection to prevent injury to the staff, students, visitors, public and Contractor employees. Contractor shall conduct and execute work to avoid hazards to persons or property. Property damaged by their failure to provide protection shall be replaced or repaired by the Contractor at no additional cost to the Government.

16. CONTRACTOR HOUSEKEEPING REQUIREMENTS:

Good housekeeping, including routine debris and scrap removal, shall be maintained in all areas within the Contractors scope of operation. All garbage shall be stored and removed to an approved EPA landfill site.

All trench excavation shall meet OSHA requirements. Proper notification and signage are required for open trenches. No construction activity shall jeopardize the safety and welfare of the staff, students, visitors, public and government property.

End of Statement of Work

SECTION E – INSPECTION AND ACCEPTANCE

E.1 52.246-12 INSPECTION OF CONSTRUCTION AUGUST 1996

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.

The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.

The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work.

Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may--

(1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction.

However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

SECTION F -- DELIVERIES OR PERFORMANCE

F.1 52.211-10 COMMENCEMENT, PROSECTION, AND COMPLETION OF WORK APR 1984

The Contractor shall be required to (a) commence work under this contract within on three (3) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than five (5) calendar days. The time stated for completion shall include final cleanup of the premises.

F.2 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION SEPTEMBER 2000

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $100.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

F.3 52.211-18 VARIATION IN ESTIMATED QUANTITY APRIL 1984

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract.

Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.

F.4 52.236-01 PERFORMANCE OF WORK BY THE CONTRACTOR APRIL 1984

The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifteen percent (15%) of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

F.5 52.242-14 SUSPENSION OF WORK APRIL 1984

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly.

However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed--

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

SECTION G: CONTRACT ADMINISTATION

G.1 CONTRACT ADMINISTRATION - GOVERNMENT All administrative questions shall be directed to:

(Please do not mail your solicitations, please email to the address below.)

Mary Jane Johnson, Contracting Officer BIE-Division of Acquisition Operations 1011 Indian School RD NW Albuquerque, New Mexico 87104 Telephone No.: (505) 803-4259 Email: maryjane.johnson@bie.edu

G.2 CONTRACT ADMINISTRATION CONTRACTOR

Designate a person whom the Government may contact during the period of the contract for prompt action on matters pertaining to the administration of the contract. Authorized Administrator is:

Company Name:

POC: EMAIL:

Address:

Telephone No.

G.3 CONTRACTING OFFICER'S REPRESENTATIVE

A. The Contracting Officer shall designate a Contracting Officer's Representative (COR) who will represent the Contracting Officer in the technical phase of the work. The COR's duties, responsibilities, and limitations of authority will be set forth in a written COR designation letter. A copy of the COR designation letter will be made available to the Contractor.

B. The COR is not authorized to make any changes to the terms and conditions of this contract. Only the Contracting Officer is authorized to make any changes to the contract by a properly written signed modification to the contract.

C. The Contracting Officer is the only official who can legally commit or obligate the Government for expenditure of public funds.

G.4 INVOICE AND PAYMENT

Electronic Invoicing and Payment Requirements- Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice

Processing Platform System (IPP).

mailto:maryjane.johnson@bie.edu

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [CO to edit and include the documentation required under this contract]:

- A copy of the contractor’s invoice shall be included with the IPP invoice. If no invoice is attached, the Invoice will be rejected.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than }- 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production

Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request inwriting to the Contracting Officer with its proposal or quotation.

(End of Local Clause) http://www.ipp.gov/ mailto:ippgroup@bos.frb.org

SECTION H -- SPECIAL CONTRACT REQUIREMENTS

H.1 Tribal Taxes, Requirements and/or Restrictions

(a) Special attention is called to FAR Clause 52.236-7, Permits and Responsibilities and FAR Clause 52.229- 3, Federal, State, and Local Taxes. Offerors are responsible for contacting the tribe or tribal organization involved with regard to any requirements regarding tribal taxes, royalties and/or other applicable tribal laws or ordinances.

Any costs associated with this section shall be included in the contractor's bid.

(b) Offerors are responsible for contacting the Office of Navajo Labor Relations for labor compliance for work performed on Navajo Nation. Current available information is identified at https://www.onlr.navajo-nsn.gov/

H.2 Modification Proposal - Cost Breakdown

The Contractor, in connection with any proposal he makes for a contract modification, shall furnish a price breakdown, itemized as required by the Contracting Officer (CO). Unless otherwise directed, the breakdown shall be in sufficient detail to permit an analysis of all material, labor, equipment, subcontract, and overhead costs, as well as profit, and shall cover all work involved in the modification, whether such work was deleted, added, or changed. Any amount claimed for subcontractors shall be supported by a similar price breakdown. In addition, if the proposal includes a time extension, a justification thereof shall also be furnished. The proposal, together with the price breakdown and time extension justification, shall be furnished by the date specified by the Contracting Officer.

H.3 POST AWARD CONFERENCES – Firm Fixed Price Contracts

The Contracting Officer shall conduct monthly post award meetings with the contractor and the Contracting Officer’s Technical Representative (COTR). Discussions at these meetings will center on the contractor’s performance to determine if the contractor is meeting and performing in accordance with the contract terms and conditions. The Contracting Officer will ensure that minutes of the meetings are taken, and copies provided to attendees.

H.4 Changes

The contractor shall not perform any of contingent sum work, until the Contracting Officer issues a modification authorizing performance of work in accordance with FAR clause 52.243-04, Changes and 52.243- 5, Changes and Changed Conditions.

The Contractor shall promptly notify the Contracting Officer, in writing, of subsurface or any physical conditions for those indicated in this contract or unknown physical conditions at the site before proceeding with the work.

The change orders request shall be forward to the Contracting Officer by memorandum outlining the need and justification for the change order. Upon receipt of the change order request the Contracting Officer will request a cost proposal from the Contractor. All cost proposal shall be in detail and itemized, showing price breakdown in sufficient detail to permit and analysis of cost for material, labor, equipment , hours, taxes, insurance, bonds, overhead costs, profit, and complete description of work involved in the change order, including any time extension.

In an emergency situation, the Contracting Officer may grant a telephone approval, and immediately the Contractor shall follow through by submitting a written cost proposal to the Contracting Officer. The Contracting Officer will issue a contract modification to authorize the work for the “emergency”.

H.5 Determination and Extension of Contract Time

The calendar days, stated under Section F.1 – FAR 52.211-10, allowed for the performance of the contract is based upon the work to be performed and weather conditions that are normally anticipated in the area that may prevent work. Request for time extensions because of weather conditions shall not be granted except in the case of unusually severe weather or “Act of Nature” unanticipated by this contract.

H.6 Contractor Safety Program Requirements

The Contractor shall establish a safety program, which is consistent of FAR Clause 52.236-13 and also shall include at a minimum the following requirements.

A. Safety Program Submittal: Within 10 days following the awarding of a contract, the Contractor shall submit in writing to the Contracting Officer a proposed comprehensive safety program for approval.

The Contractor’s safety program shall detail policies, procedures and plans that will be implemented to ensure the safety and health of employees and visitors at the job site. The Contractor shall prepare a list of major hazards associated with the contract work and provide in the safety program means to minimize the hazards.

B. Pre-Construction Safety Meeting: Representative of the Contractor shall meet with the Contracting Officer’s Representative and the Contracting Officer prior to the start of construction to review the safety program and discuss implementation of the health and safety provisions pertinent to the work under this contract. The Contractor should be prepared to discuss, in detail, the measures to be taken to control the hazards associated with the major phases of the work under this contract. This meeting shall be devoted mainly to a discussion of the way the Contractor intends to administer the health and safety program, delegation of responsibility for implementing the program, and determination of what shall be presented in the written safety program.

C. Contractor Housekeeping Requirement: Good housekeeping, including provision and facilities for routine scrap removal, shall be maintained in all areas within the Contractor’s scope of operations. All garbage shall be stored and removed to an approved dumpsite as specified by the permitting Agency.

The construction yard(s) shall be restored to their natural condition or better as required by the permitting requirements and in accordance with Tribal, State, and Federal Law (i.e. applicable OSHA construction standards).

D. Contractor Contamination Requirement: Handling, storage, and disposal of toxic materials of any nature shall be carried out in a manner so as not to contaminate or pollute public and/or private property, water supplies, rivers, lakes, reservoirs, streams, or the atmosphere. Disposal of all materials, including waste, garbage, and sewage, shall comply with all local, tribal, state and federal regulations (i.e. Clean Air and Water Act).

H.7 Payment to Contractor

See FAR Clause 52.232-27, Prompt Payment for Construction Contract. Payments to the Contractor shall be made within fourteen (14) calendar days after the CO approves each invoice. The Government will make payment according to the project schedule that is provided, and the percentage completed.

H.8 WORK OUTSIDE REGULAR WORK HOURS

If the contractor desires to perform work under this contract outside regular work hours or on Saturdays, Sundays or holidays, he shall apply, in writing, to the Contracting Officer no less than 10 calendar days prior to the planned start of such work. Regular work hours are, for the purpose of this clause, those hours the activity or Command where the work is to be performed normally works on a day-by-day basis. Application by the Contractor does not imply consent by the Government. Each application will be considered, and a decision made, on the potential benefit of permitting such work. Approval of a Contractor's application under this clause will be, unless otherwise agreed in writing, at no additional cost to the Government.

H.9 DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT

All designs, drawings, specifications, notes and other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201(b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws.

H.10 REQUIRED INSURANCE

The contractor shall procure and maintain insurance for each task order during the entire period of performance consistent with FAR 52.228-5, DIAR 1452.228-70, and FAR 28.307, which states the following minimum amounts of liability:

(a) Workers’ Compensation and Employer’s Liability. Contractors are required to comply with applicable Federal and State worker’s compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)

(b) General Liability. (1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

(c) Property damage liability insurance shall be required only in special circumstances as determined by the agency.

(d) Automobile Liability. The Contracting Officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

H.11 VOLATILE ORGANIC COMPOUNDS (VOC) COMPLIANCE PLAN

(a) Contractor's are required to comply with local VOC laws and regulations and shall have an acceptable VOC compliance plan. The plan shall demonstrate that the use of paints, solvents, adhesives and cleaners comply with local VOC laws and regulations governing VOC materials, and that all required permits have been obtained or will be obtained prior to starting work involving VOC's, in the air quality district in which the work will be performed.

(b) The compliance plan shall be submitted by the Contractor to the Contracting Officer within five (5) calendar days after receipt of contract, and prior to the use of any "VOC" materials on the project site.

The Government will approve or disapprove the Contractor's compliance plan within five calendar days after receipt. Should the Government reject the compliance plan, the Contractor shall resubmit a revised compliance plan within three calendar days after receipt of the rejection notification. Failure on the part of the Contractor to submit an acceptable "VOC" plan, shall not be grounds for a time extension to the performance period.

(c) An acceptable compliance plan shall contain, as a minimum:

(i) A listing of each material subject to restrictions in the air quality management district in question;

(ii) The rule governing its use;

(iii) A description of the actions which the Contractor will use to comply with the laws and regulations, and plans to report to the Contracting Officer any changes in the status of compliance during the life of the contract.

(iv) Alternatively, if no materials are subject to the restrictions in the air quality management district where the work will be performed, or if there are no restrictions, the compliance plan shall so state.

H.12 WAGE RATES

Applicable Construction Wage Rate Requirements are in effect at the time of contract and will apply.

Contractors will be provided with the wage determination prior to issuance of a task order for pricing purposes. If crafts or trades are required in the performance of this project for which no wage is listed in the Department of Labor Wage Decision, the Contracting Officer shall be notified in writing.

H.13 CERTIFICATION OF PAYMENTS-RELEASE OF CLAIM

The Contractor, prior to receiving a progress or final payment under this contract, shall submit to the Contracting Officer a certification that the Contractor has made payment from proceeds of prior payments, or that he will make timely payment from the proceeds of the progress or final payment then due him, to his subcontractors and suppliers in accordance with his contractual arrangements. The Contractor shall submit to the Contracting Officer, together with his request for final payment, a properly executed Contractor's Release form. Failure to submit this completed release shall result in delay of final payment.

H.14 SUBCONTRACT DATA

The Contractor shall submit an executed Statement and Acknowledgment Standard Form 1413, to the Contracting Officer for every subcontractor (including every subcontractor of the second or lower tier) that will be performing work at the construction site. This shall be done before the subcontractor begins work. This form provides an acknowledgment by the subcontractor that mandatory "flow-down" contract clauses have been included in his contract in accordance with FAR Clause 52.222-11. The Prime Contractors will be given copies of Form SF 1413 after award of a contract. Completing this form creates no contractual relationship between subcontractors and the Government.

H.15 CONTRACTOR SECURITY REQUIREMENTS

At the Pre-construction Conference [or prior to beginning work on the contract], the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility.

Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the facility. Contractor personnel shall have photo identification at all times while working on BIA facilities. Contractors shall provide the COR with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, etc...) and provide the company name, delivery person, and phone number of the firm(s) making deliveries.

Otherwise access to the BIA facility may be denied. Special security provisions may apply to some task orders. Employees may be required to submit to a background check and be United States citizens.

H.16 REAL ID ACT OF 2005

The Real ID Act of 2005 established minimum security standards for license issuance and production and prohibits Federal agencies from accepting for certain purposes driver's licenses and identification cards from states not meeting the Act's minimum standards. To this purpose there are five states that are not in compliance with the Act nor have they received an extension to come into compliance with the act. Those states are Illinois, Minnesota, Missouri, New Mexico and Washington State. Anyone under this contract, to include subcontractors, who holds a driver's license from any of states without approved licenses and require access to a military facility will be required to provide identification other than a driver's license to gain access. It is the responsibility of the Contractor to ensure that they are in accordance with the Real ID Act and any other requirements for base access. For the states of Washington and Minnesota an enhanced driver's license is acceptable to gain access. Other forms of identification that are acceptable for military facility access are included as an attachment to this modification.

Further information on the Real ID Act can be found here: http://www.dhs.gov/real-id-enforcement-brief#

H.17 TEMPORARY FACILITIES

(a) STORAGE: The location for exterior stock piling of materials shall be arranged by the COR and Project Manager. The Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risks of loss. The BIA assumes no responsibility for material or equipment left in the storage area.

(b) SANITARY FACILITIES: Toilet facilities may be available for Contractor use. The Contractor shall ensure the facilities remain clean. Contractors may be required to provide toilet facilities at some sites.

(c) WATER AND ELECTRICITY: Water and 120V electricity may be available at no cost to the Contractor.

Should water and electricity be available contractor, the Contractor will bear connection costs. Cost of these utility connections and disconnections is the responsibility of the Contractor.

H.18 EXISTING UTILITIES

Utility locations when shown are approximate. The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic or magnetic detection devices, by noting pull box and utility box locations at the surface, and by potholing.

Contractor shall be responsible for…