Sol_12405B23Q0491.pdf
PDF 221 KB Posted
- Attached to
- Pest Control Services, Tifton, GA Federal contract opportunity
- Solicitation number
- 12405B23Q0491
About this file
This is a solicitation for annual pest control services for buildings on the USDA Agricultural Research Service Field Research Implementation and Information Delivery facility in Tifton, Georgia. The solicitation requests quotes for a base year of pest control services from September 2023 to August 2024, with three optional one-year extensions that would continue performance through August 2027. Quotes are due by July 31, 2023. The services required include general pest control for insects and rodents. Inspection and acceptance of the services will occur at the Tifton facility. The award will be made to the vendor that meets the requirements specified and has acceptable past performance based on reviews of federal award systems.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Contact Information.docx | DOCX document | |
| Beta Sam Solicitation.docx | DOCX document | |
| Beta Sam Solicitation.docx | DOCX document | |
| SOW for Solicitation.pdf | ||
| CLAUSES and PROVISIONS.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
ARS-124392
TIFTON GA 31793
2316 RAINWATER ROAD
SEA SOUTHEAST WATERSHED RESEARCH
ARS-124392 CODE 16. ADMINISTERED BYCODE
X
X
561710
SIZE STANDARD:
% FOR:SET ASIDE:UNRESTRICTED ORARS-12405B
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
07/31/2023 1700 ET
07/24/2023
(985) 868-3298CECILIA MCNAMEE
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
12405B23Q0491
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 8 1106737OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
TIFTON GA 31793
2316 RAINWATER ROAD
SEA SOUTHEAST WATERSHED RESEARCH
15. DELIVER TO
STONEVILLE MS 38776
141 EXPERIMENT STATION ROAD
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$17.5
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
USDA ARS SEA AAO ACQ/PER PROP
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Period of Performance: 10/01/2023 to 08/31/2024
0001 Annual pest control services for all CGBRU & SEWRU buildings on the Tifton, Ga ARS Research Facility
BASE YEAR 09/01/2023-08/31/2024
Delivery: 09/01/2023
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
DATED
VICTOR H. MCCOY
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
0002 Annual pest control services for all CGBRU & 1 EA
SEWRU buildings on the Tifton, Ga ARS Research
Facility
OPTION YEAR 1 - 09/01/2024-08/31/2025
(Option Line Item)
07/01/2024
Product/Service Code: S207
Product/Service Description: HOUSEKEEPING-
INSECT/RODENT CONTROL
Period of Performance: 09/01/2024 to 08/31/2025
0003 Annual pest control services for all CGBRU & 1 EA
SEWRU buildings on the Tifton, Ga ARS Research
Facility
OPTION YEAR 2 - 09/01/2025-08/31/2026
(Option Line Item)
07/01/2025
Product/Service Code: S207
Product/Service Description: HOUSEKEEPING-
INSECT/RODENT CONTROL
Period of Performance: 09/01/2025 to 08/31/2026
0004 Annual pest control services for all CGBRU & 1 EA
SEWRU buildings on the Tifton, Ga ARS Research
Facility
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
8 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 8
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12405B23Q0491
OPTION YEAR 3 - 09/01/2026-08/31/2027
(Option Line Item)
07/01/2026
Product/Service Code: S207
Product/Service Description: HOUSEKEEPING-
INSECT/RODENT CONTROL
Period of Performance: 09/01/2026 to 08/31/2027
0005 Annual pest control services for all CGBRU & 1 EA
SEWRU buildings on the Tifton, Ga ARS Research
Facility
OPTION YEAR 4 - 09/01/2027-08/31/2028
(Option Line Item)
07/01/2027
Product/Service Code: S207
Product/Service Description: HOUSEKEEPING-
INSECT/RODENT CONTROL
Period of Performance: 09/01/2027 to 08/31/2028
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
12405B23Q0491, Pest Control, USDA, ARS Tifton, GA
AGAR Clauses
452.211-74 Period of Performance
The period of performance of this contract is completed delivery within 1 year of PO issuance.
452.204-70 Modification for Contract Closeout
As prescribed in USDA’s Contracting Desk Book 404.804 and 413.302-5, insert the following clause:
MODIFICATION FOR CONTRACT CLOSEOUT (DEVIATION JULY 2022)
“Upon contract closeout for contracts utilizing Simplified Acquisition Procedures (SAP) according to FAR part 13,
(a) If unobligated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (CO) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The CO shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(b) If unobligated funds of more than $1000 remain on the contract, the CO shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and will be required to provide a signature. (The CO may also request a Release of Claims be completed by the contractor, although not required for contract and orders using SAP.) If the bilateral modification and Release of Claims are not returned to the CO within 60 days, the CO shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.”
(End of clause)
452.246-70 Inspection and Acceptance.
As prescribed in 446.370, insert the following clause:
INSPECTION AND ACCEPTANCE (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at:
Tifton, GA 31793 (End of Clause)
452.224-70 Confidentiality of Information.
As prescribed in 424.104, insert a clause substantially as follows:
CONFIDENTIALITY OF INFORMATION (FEB 1988)
(a) Confidential information, as used in this clause, means --(1) information or data of a personal nature, Proprietary about an individual, or (2) information or data submitted by or http://www.dm.usda.gov/procurement/policy/docs/AGAR_Updated_5May2016.pdf pertaining to an organization.
(b) In addition to the types of confidential information described in (a)(1) and (2) above, information which might require special consideration with regard to the timing of its disclosure may derive from studies or research, during which public disclosure of primarily invalidated findings could create an erroneous conclusion which might threaten public health or safety if acted upon.
(c) The Contracting Officer and the Contractor may, by mutual consent, identify elsewhere in this contract specific information and/or categories of information which the Government will furnish to the Contractor or that the Contractor is expected to generate which is confidential. Similarly, the contracting Officer and the Contractor may, by mutual consent, identify such confidential information from time to time during the performance of the contract. Failure to agree will be settled pursuant to the "Disputes" clause.
(d) If it is established that information to be utilized under this contract is subject to the Privacy Act, the Contractor will follow the rules and procedures of disclosure set forth in the Privacy Act of 1974, 5 U.S.C. 552a, and implementing regulations and policies, with respect to systems of records determined to be subject to the Privacy Act.
(e) Confidential information, as defined in (a)(1) and (2) above, shall not be disclosed without the prior written consent of the individual, institution or organization.
(f) Written advance notice of at least 45 days will be provided to the Contracting Officer of the Contractor's intent to release findings of studies or research, which have the possibility of adverse effects on the public or the Federal agency, as described in (b) above. If the Contracting Officer does not pose any objections in writing within the 45 day period, the contractor may proceed with disclosure. Disagreements not resolved by the Contractor and Contracting Officer will be settled pursuant to the "Disputes" clause.
(g) Whenever the Contractor is uncertain with regard to the proper handling of material under the contract, or if the material in question is subject to the Privacy Act or is confidential information subject to the provisions of this clause, the Contractor shall obtain a written determination from the Contracting Officer prior to any release, disclosure, dissemination, or publication.
(h) The provisions of paragraph (e) of this clause shall not apply when the information is subject to conflicting or overlapping provisions in other Federal, State or local laws.
(End of Clause)
452.237-74 Key Personnel.
As prescribed in 437.110(d), insert a clause substantially as follows:
KEY PERSONNEL (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel:
(b) During the first ninety (90) days of performance, the Contractor shall information required by paragraph
(c) To the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will http://www.dm.usda.gov/procurement/policy/docs/AGAR_Updated_5May2016.pdf notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
(End of Clause)
452.237-75 Restrictions Against Disclosure.
As prescribed in 437.110(e), insert a clause substantially as follows:
RESTRICTIONS AGAINST DISCLOSURE (FEB 1988)
(a) The Contractor agrees, in the performance of this contract, to keep all information contained in source documents or other media furnished by the Government in the strictest confidence. The Contractor also agrees not to publish or otherwise divulge such information in whole or in part in any manner or form, or to authorize or permit others to do so, taking such reasonable measures as are necessary to restrict access to such information while in the Contractor's possession, to those employees needing such information to perform the work provided herein, i.e., on a "need to know" basis. The Contractor agrees to immediately notify in writing, the Contracting Officer, named herein, in the event that the Contractor determines or has reason to suspect a breach of this requirement.
(b) The Contractor agrees not to disclose any information concerning the work under this contract to any persons or individual unless prior written approval is obtained from the Contracting Officer. The Contractor agrees to insert the substance of this clause in any consultant agreement or subcontract here under.
(End of Clause)
INSTRUCTIONS FOR THE PREPARATION OF OFFERS (FAR 52.212-1 Addendum)
This procurement is a Solicitations competed in accordance with FAR Part 8. Solicitation documentation and any issued amendments will be distributed via email. No hard copy solicitation materials are available.
Offerors shall provide all required information referenced in this section. Failure to provide all requested information may result in the proposal not being considered for further evaluation.
Offers shall submit required documents via email ONLY to Cecilia.Mcnamee@usda.gov.
Award of the contract resulting from this solicitation will be made to the vendor that has been found to be technically acceptable. To be technically acceptable, vendors must meet all requirements for the Cloud Services Provider from the Statement of Work on page 3 of this document.
FAR 52.212-2 – Evaluation -- Commercial Items (Addendum).
Evaluation -- Commercial Items (Oct 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Lowest Priced Technically Acceptable.
Evaluation Methodology
In accordance with FAR Part 13 the Government will award a firm fixed price contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
The following factors shall be used to evaluate offers:
Lowest Price Technically Acceptable
(LPTA), evaluation method. Technical
Acceptability is defined as:
1) Meeting all requirements as defined in the solicitation, to include submission of all Quote submission documents referenced in Instructions for the Preparation of Offers (FAR 52.212-1 Addendum). Failure to submit ANY of the required document listed in “Offer Submission Documents (52.212-1 Addendum)” will render your quote non-responsive and thus not eligible for award. Failure to acknowledge any and all amendments will render your quote non-responsive and thus not eligible for award.
2) Acceptable rating in “Past Performance”.
Past performance will be evaluated in accordance with FAR 13.106-2. Past Performance will be rated on an “acceptable” or “unacceptable” basis. The apparent successful, prospective contractor must have “acceptable” past performance. System for Award Management (SAM.gov) exclusions list, Federal Awardee Performance and Integrity Information System, and Contractor Performance Assessment Reporting System (CPARS) shall be considered as part of the past performance evaluation process. Any past performance that is found to be “Negative”, shall result in the entire Past Performance rating as “Unacceptable”. “Negative” is defined as any CPARS past performance evaluation rated less than “Satisfactory”, any Terminations for Default/Cause, or any negative performance references will be rated as ‘Unacceptable’. Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.” Any past performance that is found to be “negative”, shall result in the entire Past Performance rating as “Unacceptable” making the overall Technical Acceptability as “Unacceptable”.
(End of Provision)
File details come from the government source that posted it. Updated .