This memorandum documents a sole source justification for the acquisition of 2032-6057 film tape from 3M Company on an urgent basis. The contracting officer determined that only 3M Company, as the original equipment manufacturer, can meet the delivery date and ensure the equipment will operate as intended. The tape is needed as a direct replacement part for existing shipyard equipment and any other product could cause malfunctions, rendering the equipment inoperable and delaying scheduled work.
The related federal contract opportunity is a solicitation seeking quotes for the acquisition of four rolls of 3M P/N 9731 silicone/acrylic double coated adhesive film tape from 3M Company or its authorized distributors on a firm-fixed price basis. The requirement is set aside solely for 3M Company as the brand name product due to proprietary rights. Quotes are to be submitted electronically by the deadline to the identified point of contact at the Naval Sea Systems Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N42158-24-Q-E029.pdf | ||
| N42158-24-Q-E029-A0001.pdf | ||
| CERTIFICATE OF CONFORMANCE- 3348-6036.docx | DOCX document | |
| N42158-24-Q-E029.docx | DOCX document | |
| Addendum TO 52.212-2.docx | DOCX document | |
| TECHNICAL CAPABILITIES.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORANDUM TO THE FILE
USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER THE
SIMPLIFIED ACQUISITION THRESHOLD
(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart
13.5 shall follow the special documentation requirements at FAR 13.501.)
JML Document Number:_________________________________
Item Description (Brief):__________________________________
Required Delivery Date:__________________________________
I. BACKGROUND:
1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.*
* In the case of Brand Name - Contracting officers may solicit from one source if the contracting officer determines that the circumstances of the contract action deem only one source reasonably available, such as due to brand-name restrictions. [FAR 13.106-1(b)(1)(i)] However, this Memo to File may also be used to document the Contracting Officer’s determination that brand name restrictions exist sufficient to preclude competition to the maximum extent practicable, but where competition is still sought amongst authorized distributors of the brand name item.
* In the case of Unusual or Compelling Urgency – Contracting officers may solicit from one source if the contracting officer determines that the circumstances of the contract action deem only one source reasonably available due to urgency. [FAR 13.106- 1(b)(1)(i)] However, this Memo to File may also be used to document the Contracting Officer’s determination that an Unusual or Compelling Urgency exists sufficient to preclude competition to the maximum extent practicable (meeting the notice exception of FAR 5.202(a)(2)), but where quotes are still solicited (e.g., oral solicitation of quotes).
II. DESCRIPTION OF ITEM OR SERVICE:
Provide a description of the item or service required, to include its intended use, the name of the required source or brand name, and the required delivery date/period of performance.
2032-6057 film tape asap
Make: SILICONE/ACRYLIC DOUBLE COATED ADHESIVE FILM TAPE
Model: 3M P/N 9731
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS
BASED ON THE FOLLOWING (select all that apply):
☐ A. ONLY ONE RESPONSIBLE SOURCE (select all that apply):
☐ 1. RESTRICTIVE RIGHTS - The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.
☐ 2. EXCLUSIVE LICENSING AGREEMENTS - The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
☐ 3. OTHER REASONS
☐ B. BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer.
☐ C. UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.
IV. CERTIFICATIONS/APPROVALS:
A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
Signature Name (Printed) / Phone # Date
B. Contracting Officer Certification/Approval: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Signature Name (Printed) / Phone # Date
For Section III, explain your selections from above (see notes on Section III for guidance):
The parts requested are direct replacement for existing shipyard equipment and 3M Company is the Original Equipment Manufacturer (OEM). The parts requested are "one for one" replacements and must be procured from the OEM (or his authorized distributor) in order for the equipment to operate to shipyard and OEM performance standards. Any other parts and/or accessories not from the OEM would cause malfunction of equipment there by rendering the equipment inoperable and causing delay in the vessels scheduled work package.
KIZER.JEANETTE.
MARIE.1235602713
Digitally signed by
KIZER.JEANETTE.MARIE.123560271
Date: 2022.03.08 11:54:02 -05'00' Jeanette Kizer 396-1226 3-8-2022
Notes on Section III
Section IIIA
Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.
Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM. -OR- Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document.
NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).
If other reason selected provide details on mission impact if requirement is not solicited from only one source.
Section IIIB
Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the Government’s requirements and why a “brand name or equal” purchase description cannot be used (see FAR 11.104). Describe how market research indicates other companies’ similar products or products lacking the particular feature do not meet, or cannot be modified to meet, the agency’s needs.
Section IIIC
Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.
Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.
4. If appropriate, include any additional pertinent information.
File details come from the government source that posted it. Updated .