Shelter SOW.docx

DOCX document 17 KB Posted

Attached to
New Temporary Structure to replace Greenhouse Federal contract opportunity
Solicitation number
12305B21Q0078
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area

View the file

Other files for this federal contract opportunity

Other files attached to New Temporary Structure to replace Greenhouse, newest first.
File Type Posted
sCI (FAC 2021 05).docx DOCX document
SF 1449 (2_2012).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Background.

The USDA-Agricultural Research Service is conducting research on salmon genetics and breeding at the NCWMAC in Franklin, ME.

Project objective.

One new 28ft wide by 60ft long by 18ft tall structure is needed to replace a greenhouse that has reached the end of its life and can no longer be serviced or repaired due to extensive corrosion to the structural components of the building. This structure will contain multiple saltwater recirculating aquaculture systems (RAS) used to house research animals at the National Cold Water Marine Aquaculture Center (NCWMAC). These saltwater RAS systems create a highly corrosive environment within the structure that requires all structural components to be made with corrosion resistant powder coatings and stainless-steel components. The vendor is also required to provide a Structural Report, and Architectural Drawing that are both stamped by a Maine P.E. to prove that the structure is able to withstand both the heavy snow and wind loads found in coastal Maine.

Specifications:

(1) Item MODEL WP-2860-DAGB24"K+2'EH:

28’ Wide x 60’ Long Gable Building with an 18' Peak Height, 10' Eave Including:

(1) Heavy Duty Steel Truss Framing, Powder-Coated with Primer

(1) Insulating Liner System

(2) Tensioned End Walls, Insulated

(1) 12' Wide x 12' High Heavy Duty Double Zipper Utility Entry with Pulley Track System

(1) 12' Wide x 8' High Heavy Duty Double Zipper Utility Entry with Pulley Track System

(1) 36" Personnel Door

(2) 24" Exhaust Fan with Shutter

(2) 24" Shutter

(1) Set of ECU Ports

(1) Earth Anchor Package

(1) Structural Report, Maine P.E. Stamp

(1) Architectural Drawings, Maine P.E. Stamp

Period of Performance: 8/19/2021-12/29/2021

File details come from the government source that posted it. Updated .