The American Embassy in Suva Fiji requires preventive maintenance services for Multistack Airstack Chiller System WTFO-15A Serial 15-A-00G-02P-O. These services shall result in all systems being serviced under this agreement being in good operational condition when activated. This work is to be performed on systems accessing the PCC/CAA areas of the building. Please see section 6.2.5 for security requirements and section 4.2 for qualification requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Suva_Chillers_RFQ_Addl_Security.pdf | ||
| Suva_Chillers_RFQ.pdf | ||
| Advertizement_for_BME_Airstack_ Multistack .pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Embassy Suva 158 Princes Road Suva
July 2nd 2015
Dear Prospective Offerors:
Subject: Request for Quotations number SFJ60015Q0007
Enclosed is a Request for Quotations (RFQ) for chiller-air handler services. If you would like to submit a quotation, follow the instructions in Section 4 of the solicitation, complete the required portions of the attached document, and submit it to the following address:
Contracting Officer U.S. Embassy Suva 158 Princes Road Suva
Please submit your quotation in a sealed envelope marked "Quotation Enclosed" to the above address. The deadline for receipt of quotations is 12 noon Suva local time, August 2nd 2015.. No quotations will be accepted after this time.
In order for a quotation to be considered, you must also complete and submit the following:
SF-1449 (block 17, 24 and 30). Block 24 should list the total value of the quote for the base year and the option year.
Section 1, The Schedule Section 3, verse 4 Section 5, Representations and Certifications Additional Information as required in Section 4.
Direct any questions regarding this solicitation in writing to Jane Denham, Contracting Officer. Questions must be sent to email addresses DenhamJL@state.gov and MosesEE@state.gov (please be sure to send to both email addresses to ensure your message is received).
The U.S. Government intends to award a contract to the responsible company submitting an acceptable quotation at the lowest price. We intend to award a contract based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.
Sincerely, Jane Denham Contracting Officer Enclosure:
As Stated.
mailto:DenhamJL@state.gov mailto:MosesEE@state.gov
TABLE OF CONTENTS
Section 1 - The Schedule
SF 1449 cover sheet
Continuation To SF-1449, RFQ Number SFJ60015Q0007 Prices, Block 23
Continuation To SF-1449, RFQ Number SFJ60015Q0007, Schedule Of Supplies/Services, Block 20
Description/Specifications/Work Statement
Exhibit A - List of Tasks to be Performed (Statement of Work) and Equipment List
Section 2 - Contract Clauses
Contract Clauses
Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
Section 3 - Solicitation Provisions
Solicitation Provisions
Section 4 - Evaluation Factors
Evaluation Factors
Section 5 - Representations and Certifications
Offeror Representations and Certifications
Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not Prescribed in Part 12
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
SFJ60015Q0007
6. SOLICITATION ISSUE DATE
July 2nd, 2015
(local time)
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JANE DENHAM
b. TELEPHONE NUMBER(No collect calls)
679 331-4466
8. OFFER DUE DATE/
LOCAL TIME
August 2nd , 2015 at 12 NOON
9. ISSUED BY
CODE
10. THIS ACQUISITION
IS
UNRESTRICTED
OR
SET ASIDE:____ %
FOR:
US EMBASSY SUVA
158 PRINCES ROAD
SUVA, FIJI
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
HUBZONE SMALL
BUSINESS
(WOSB) ELLIGIBLE UNDER THE WOMEN-
OWNED
SMALL BUSINESS PROGRAM NAICS: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
EDWOSB
8 (A) SIZE STANDARD:
11. DELIVERY FOR FOB
DESTINAION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS 13a. THIS CONTRACT IS A
RATED ORDER
UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO:
US EMBASSY SUVA
CODE 16. ADMINISTERED BY
CODE
158 PRINCES ROAD
SUVA, FIJI
17a. CONTRACTOR/
OFFERER
TELEPHONE NO.
CODE FACILITY
CODE
18a. PAYMENT WILL BE MADE BY
US EMBASSY SUVA,FMO, 158 PRINCES ROAD, SUVA,
FIJI
CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH
ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
See section 1 attached
BME Airstack Multistack services. Please see attached
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE
ATTACHED. ADDENDA
ARE ARE NOT
ATTACHED
27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
ADDENDA
ARE ARE NOT
ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
____ COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE
AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND
CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. _________________ OFFER DATED
____________. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING
OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER
JANE DENHAM
31c. DATE SIGNED
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ____________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
36. PAYMENT 37. CHECK NUMBER
PARTIAL FINAL
COMPLETE PARTIAL
FINAL
38. S/R ACCOUNT NO.
39. S/R VOUCHER NO. 40. PAID BY
41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR
PAYMENT
42a. RECEIVED BY (PRINT)
41b. SIGNATURE AND TITLE OF CERTIFYING
OFFICER
41C. DATE
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS
SECTION 1 - THE SCHEDULE
1.0 DESCRIPTION
The American Embassy in Suva, Fiji requires preventive maintenance services for Multistack, Airstack Chiller System WTFO-15A, Serial # 15-A-00G-02P-O. These services shall result in all systems being serviced under this agreement being in good operational condition when activated. This work is to be performed on systems accessing the PCC/CAA areas of the building. Please see section 6.2.5 for security requirements, and section 4.2 for qualification requirements.
1.1. TYPE OF CONTRACT
Cost proposal will be evaluated on a lowest priced technically accepted format. This is a firm fixed price contract payable entirely in US Dollars for all Contract Line Item Numbers (CLIN) . No additional sums will be payable for any escalation in the cost of materials, equipment or labor, or because of the contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The contract price will not be adjusted due to fluctuations in currency exchange rates.
1.2. PERIOD OF PERFORMANCE
The contract will be for a period of one-year, with a maximum of two one-year optional periods of performance and will be expected to commence no later than the 2nd November 2015
2.0 PRICING
The rates below include all costs associated with providing preventive maintenance services in accordance with the attached scope of work, and the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-5), overhead, profit and GST (if applicable).
2.1. Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.
CLIN Description Quantity of Equipment
Type of services
No. of service
Unit price / service ($)
Total per year ($)
WTFO-15A
Serial # 15-A-00G-02P-O
1 Annual 1
001-A GLYCOL Feeder –
WTFO00G
1 Annual 1
001-B PUMP Module –
WTFO02P
1 Annual 1
001-C Compressor Model
WTFO-15A-JH-05-157
1 Annual 1
001-D Compressor Model
WTFO-15A-JH-05-158
1 Annual 1
001-E Compressor Model
WTFO-15A-JH-05-159
1 Annual 1
Total Base Year
2.2. Option Year 1. The Contractor shall provide the services shown below for Option Year 1 of the contract, and continuing for a period of 12 months.
2.3. Option Year 2. The Contractor shall provide the services shown below for Option Year 2 of the contract, and continuing for a period of 12 months.
2.4. Total for all years: Base Year $__________
Option Year 1 $__________
Option Year 2 $__________
TOTAL $__________
2.5 Repair option. Repairs are NOT included under this agreement (see 7.1.3) and are to be done outside this contract.
However, we would like to have current labor rates in the event that there is an issue discovered during the preventive maintenance of the specified equipment. Please provide your current labor rates in the Repair Option fields below. As stated in 7.1.3 any necessary repairs or parts will be submitted for approval and then billed against a separate PO. The Contractor is not approved to do any additional work without approval.
CLIN Description Quantity of Equipment
Type of services
No. of service
Unit price / service ($)
Total per year ($)
WTFO-15A
Serial # 15-A-00G-02P-O
1 Annual 1
002-A GLYCOL Feeder –
WTFO00G
1 Annual 1
002-B PUMP Module –
WTFO02P
1 Annual 1
002-C Compressor Model
WTFO-15A-JH-05-157
1 Annual 1
002-D Compressor Model
WTFO-15A-JH-05-158
1 Annual 1
002-E Compressor Model
WTFO-15A-JH-05-159
1 Annual 1
Total Option Year 1
CLIN Description Quantity of Equipment
Type of services
No. of service
Unit price / service ($)
Total per year ($)
WTFO-15A
Serial # 15-A-00G-02P-O
1 Annual 1
003-A GLYCOL Feeder –
WTFO00G
1 Annual 1
003-B PUMP Module –
WTFO02P
1 Annual 1
003-C Compressor Model
WTFO-15A-JH-05-157
1 Annual 1
003-D Compressor Model
WTFO-15A-JH-05-158
1 Annual 1
003-E Compressor Model
WTFO-15A-JH-05-159
1 Annual 1
Total Option Year 2
Repair Labor Rates Base Year $__________/hr
Option Year 1 $__________/hr
Option Year 2 $__________/hr
3.0 NOTICE TO PROCEED
After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits, the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten (10) days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.
DESCRIPTION/SPECIFICATION/WORK STATEMENT
4.0 EQUIPMENT AND PERFORMANCE REQUIREMENTS
4.1. The American Embassy in Suva, FIJI requires the Contractor to maintain the following systems in a safe, reliable and efficient operating condition.
Multistack, Airstack Air Cooled Package Modules Chiller System WTFO-15A, Serial # 15-A-00G-02P-O. with associated Glycol Feeder, Pump and associated compressors WTFO-15A-JH-05-157, WTFO-15A-JH-05-158 & WTFO-15A-JH-05-159
4.2. Qualifications. The Contractor shall provide all necessary managerial, administrative and direct labor personnel, as well as all transportation, equipment, tools, and test equipment required to perform inspection, maintenance, and component replacement as required to maintain the systems in accordance with this work statement. Provide security cleared, and equipment qualified technicians to perform all aspects of this work statement. To be considered technically acceptable provide the credentials of your staff technicians’, include any license or manufacturer certifications. Provide references from past chiller experience on MultiStack/Airstack products. Prior U.S. Embassy experience is preferred.
4.3. Performance Standards
Under this contract the Contractor shall provide the services to maintain the MultiStack Air Cooled Package Modules Chillers System on a scheduled basis and to inspect equipment operation and perform required preventive maintenance.
The Contractor shall schedule all preventive maintenance work with the site Facility Manager to avoid disrupting the business operation of the Embassy.
5.0 HOURS OF PERFORMANCE
5.1. The Contractor shall maintain work schedules. The schedules shall take into consideration the hours that the staff can effectively perform their services without placing a burden on the security personnel of the Post. The Contractor shall deliver standard services between the hours of [08.00] AM and [05.30] PM Monday through Thursday, and 08.00am – 03.00pm on Friday. No work shall be performed on US Government and local holidays. Below is a list of the holidays for 2015.
6.0 ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT
6.1 General. The Contractor shall designate a representative who shall supervise the Contractor’s technicians and be the Contractor’s liaison with the American Embassy. The Contractor’s employees shall be on-site only for contractual duties and not for any other business or purpose. Contractor employees shall have access to the equipment and equipment areas and will be escorted by Embassy personnel.
6.2 Personnel Security.
The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual. The Contractor shall provide the names, biographic data and police clearance on all Contractor personnel who shall be used on this Contract prior to their utilization. Submission of information shall be made within 5 days of award of contract.
No technician will be allowed on site without prior authorization. Note: this may include cleared personnel if advance notice of visit is not given at least one week before the scheduled visit.
6.2.1 Vehicles.
Contractor vehicles will not be permitted inside the embassy compound without prior approval. If you need to have vehicle access please submit your vehicle information (Make, Model, License Plate #) along with a written justification as to why access is necessary. This should be submitted to the Facility Manager at least one (1) week prior to the visit.
6.2.2 Visitors Badge s.
Government shall issue identity cards to Contractor personnel, after they are approved. Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.
6.2.3 Work within the Control Access Areas (CAA) is only permissible by cleared American workers. No other clearance levels will be permitted. Please see paragraph 6.2.5 for facility security clearance requirements.
2015 HOLIDAY Local/American 1 Jan 01 New Year's Day A/L 2 Jan.05 Prophet Mohammed’s Birthday L 3 Jan 19 Birthday of Martin Luther King, Jr. A 4 Feb 16 President's Day – George Washington Birthday A 5 April 3 Good Friday L 6 April 4 Easter Saturday L 7 April 6 Easter Monday L 8 May 25 Memorial Day A
9 June 26 National Sports Day L 10 Jul 03 Independence Day A 11 Sep 07 Labor Day A 12 Oct. 10 Fiji Day L 13 Oct 12 Columbus Day A 14 Nov 11 Diwali L 15 Nov 11 Veterans Day A 16 Nov 28 Thanksgiving Day A 17 Dec 25 Christmas A/L 18 Dec. 26th Boxing Day A/L
6.2.4 General Security. The Contractor must comply with all of the following requirements relating to the protection of U.S. Embassy in Suva, Fiji Diplomatic personnel, property and compound project information and cooperate fully in all security matters Sensitive But Unclassified (SBU) and information that may arise relating to this contract.
The Contractor personnel may also be exposed to various documents and signs, including Post notices, event schedules, DoS regulations and conversations or announcements relating to the operation of the U. S. Embassy Conakry and diplomatic personnel. This information should not be shared with anyone not employed by or falling under the protection of the Embassy.
Contractor personnel may be exposed to various documents, such as blueprints, drawings, sketches, notes, surveys, reports, photographs, and specifications, received or generated in conjunction with this contract. These documents contain information associated with diplomatic facilities for the U.S. Department of State. These documents have been marked with the handling designations “Unclassified” or “Sensitive But Unclassified” and US Government warnings against reproduction and distribution. These documents require special handling and dissemination restrictions. All handling designations and warnings on original documents must be reproduced on subsequent copies.
The loss, compromise, or suspected compromise or loss of any SBU information, contract related information (personnel files, payroll information, etc.), any post or diplomatic facility related information (documents, notes, drawings, sketches, surveys, reports, exposed film, negatives, or photographs), or ANY information which may adversely affect the security interests of the United States, must be immediately brought to the attention of the Contracting Officer (CO) and Contracting Officer’s Representative (COR).
Photographs of any diplomatic overseas building or facility must be authorized in advance by the COR and Regional Security Officer (RSO), who will establish any controls, limits, and/or restrictions as necessary. Exposed film depicting any Controlled Access Area and/or sensitive equipment must be developed in a U.S.- controlled environment by appropriately cleared personnel. No further dissemination, publication, duplication, or other use beyond that which was requested and approved is authorized without specific, advance approval from DS. DS reserves the right to demand retention of all copies of said photographs and/or negatives, following fulfillment of the previously authorized usage.
Transmission of any information marked Sensitive But Unclassified (SBU) or contract/personnel sensitive information, via the Internet, is prohibited. SBU information can be transmitted via ProjNet, mail, FedEx (or other commercial carrier) or fax, or hand carried by authorized contractor personnel.
Discussion of U.S. Diplomatic post activities while not on post, to include in homes, hotel rooms, restaurants and all other public places, is prohibited. Any contact with host or third country nationals that seems suspicious (such as undue curiosity in the project or project personnel) shall be reported immediately to the COR and RSO.
The Contractor and its employees shall exercise utmost discretion in regard to all matters relating to their duties and functions. They shall not communicate to any person any information known to them by reason of their performance of services under this contract which has not been made public, except to the extent necessary to perform their required duties in the performance of the contract requirements or as provided by written authorization of the Contracting Officer. All documents and records (including photographs) generated during the performance of work under this contract shall be for sole use of and shall become the exclusive property of the U.S. Government. No article, book, pamphlet, recording, broadcast, speech, television appearance, film or photograph concerning any aspect of the work performed under this contract shall be published or disseminated through any media, to include company or personal websites, without the prior written authorization of the Contracting Officer. These obligations do not cease upon the expiration or termination of this contract or at any other point in time. The Contract shall include the substance of this provision in all subcontracts hereunder.
6.2.5 SECURITY REQUIREMENTS: To be considered for award the vendor must possess a minimum TOP SECRET Facility Clearance issued by Defense Security Service (DSS). Facility clearance must be maintained throughout contract. A
Contract Security Classification Specification (DD Form 254) will be issued at the time of contract award by The Bureau of Diplomatic Security; DS/IS/IND. Security provisions specified in the DD Form 254 must be followed. At a minimum, the servicing technician must have an active FINAL SECRET clearance certified to DoS DS/IS/IND via a Visit Authorization Request (VAR) with attached JCAVS Person Summary.
6.3 Standards of Conduct
6.4.1 General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.
6.4.2 Uniforms and Personal Protective Equipment. The Contractor's employees shall wear clean, neat and complete uniforms when on duty. All employees shall wear uniforms approved by the Contracting Officer's Representative (COR).
The Contractor shall provide, to each employee and supervisor, uniforms and personal protective equipment. The Contractor shall be responsible for the cost of purchasing, cleaning, pressing, and repair of the uniforms.
6.4.3 Neglect of Duties. Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.
6.4.4 Disorderly Conduct. The Contractor shall not condone disorderly conduct, use of abusive or offensive language, quarreling, and intimidation by words, actions, or fighting. Also included is participation in disruptive activities that interfere with normal and efficient Government operations.
6.4.5 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.
6.4.6 Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These circumstances include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct; unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.
6.4.7 Key Control. The Contractor will not be issued any keys. The keys will checked out from Post 1 by a “Cleared American” escort on the day of service requirements.
6.4.8 Notice to the Government of Labor Disputes. The Contractor shall inform the COR of any actual or potential labor dispute that is delaying or threatening to delay the timely performance of this contract
7.0 SCHEDULED PREVENTIVE MAINTENANCE
7.1 Scope Of Work. The Contractor shall perform preventive maintenance as outlined in Exhibit A - SCOPE OF WORK.
The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown and deterioration when units are activated/running.
7.2 Contract Exclusion. This contract does NOT include repair of equipment and replacement of hardware. Hardware replacements will be separately priced out by the Contractor for the Government’s approval and acceptance. The Government has the option to accept or reject the Contractor’s quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence.
7.3 Electronics Replacement/repair of any electronic or electrical parts must be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government.
7.4 Checklist Approval The Contractor shall submit to the COR a schedule and description of preventive maintenance tasks which the Contractor plans to provide. The Contractor shall prepare this schedule and task description in a checklist format for the COR’s approval prior to contract work commencement.
7.5 Technician Requirement. As noted in section 4.2, the contractor must provide proof of MultiStack qualified technicians, provide training certificates, licenses, or letters of reference on company letterhead. Technicians visiting the site must be capable of performing the service at frequencies stated in Exhibit A (SOW). The technician shall sign off on every item of the checklist and leave a copy of this signed checklist with the COR or the COR's designate after the maintenance visit. It is the responsibility of the Contractor to perform all manufacturers’ recommended preventive maintenance as well as preventive maintenance recommended by the manufacture technical manuals for the respective equipment.
8.0 CONSUMABLE MATERIALS AND SUPPLIES
8.1 Contractor furnished materials. In addition to the tools and test equipment noted in section 7.5 the contractor must supply its employees with the appropriate safety equipment, safety shoes and apparel for hands, hearing and eye protection, etcetera. Safety Data Sheets (SDS) are required for all chemicals used in the equipment for operations or in cleaning of the equipment’s. The Safety Data Sheets (SDS) must be posted on site.
8.2 Embassy Provided Materials. The US Embassy, Suva shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, glycol, filters (Air), grease, sealant, thermostat, fuses, sensors; in addition to the appropriate tools, testing equipment, SDS’s and cleaning material. The Contractor shall inventory, all expendable parts as recommended in the scope of work that has become worn down due to wear and tear. The contractor should inventory the necessary and critical expendable and common parts after each visit and include in site visit report. Post will procure necessary expendable supplies, common and critical parts and have them delivered to site for next scheduled preventative maintenance site visit
8.3 Disposal of used toxic substances.
The Contractor is responsible for proper disposal of toxic/hazardous substances. All material shall be disposed of according to Government and Local law. After proper disposal the contractor must show proof of authorized disposal of these toxic/hazardous substances.
8.4 Chemical analysis: The Contractor is responsible for conducting laboratory analysis for water and glycol samples. All charges for such analysis is payable by the Contractor and a report stating the test results shall be submitted to the COR.
9.0 N/A
10. DELIVERABLES
The following items shall be delivered under this contract:
Description QTY Delivery Date Deliver to
Names, biographic data, police clearance on Contractor personnel (#6.2)
1 5 days after contract award COR
Certificate of Insurance (#10.2) 1 10 days after contract award CO
Checklist signed by Contractor’s employee (#7.2.1)
1 After completion of each maintenance service
COR
Invoice (#15) 1 After completion of each maintenance service
COR
11.0 INSURANCE REQUIREMENTS
11.1 Personal Injury, Property Loss or Damage (Liability). The Contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the Contractor’s personnel in the performance of this Contract
The Contractor’s assumption of absolute liability is independent of any insurance policies.
11.2 Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this Contract, whatever insurance is legally necessary. The Contractor shall carry the following minimum insurance:
Public Liability Insurance
Bodily Injury $200,000. per occurrence $500,00Cumulative Property Damage $200,000 per occurrence $500,00Cumulative
Workers’ Compensation and Employer’s Liability
11.3 Worker's Compensation Insurance. The Contractor agrees to provide all employees with worker's compensation benefits as required under local laws (see FAR 52.228-4 “Worker’s Compensation and War-Hazard Insurance Overseas”).
12.0 LOCAL LAW REGISTRATION - N/A.
13.0 QUALITY ASSURANCE PLAN (QAP).
13.1 Plan. This plan is designed to provide an effective surveillance method to promote effective Contractor performance. The QAP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the Contract. The role of the Government is to conduct quality assurance to ensure that Contract standards are achieved.
Performance Objective PWS Para Performance Threshold
Services.
Performs all services set forth in the performance work statement (PWS)
1 thru 12 All required services are performed and no more than one (1) customer complaint is received per month
13.2 Surveillance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.
13.3 Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.
13.4. Procedures.
13.4.1 If any Government personnel observe unacceptable services, either incomplete work or required services not being performed, they should immediately contact the COR.
13.4.2 The COR will complete appropriate documentation to record the complaint.
13.4.3 If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.
13.4.4 If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.
13.4.5 The COR shall, as a minimum, orally notify the Contractor of any valid complaints.
13.4.6 If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.
13.4.7 The COR will consider complaints as resolved unless notified otherwise by the complainant.
13.4.8. Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.
14. TRANSITIONS/CONTACTS
Within fourteen (14) days after contract award, the Contracting Officer may ask the contractor to develop a plan for preparing the contractor to assume all responsibilities for preventive maintenance services. The plan shall establish the projected period for completion of all clearances of contractor personnel, and the projected start date for performance of all services required under this contract. The plan shall assign priority to the selection of all supervisors to be used under the contract.
14.1 On site contact. The following are the designated contact personnel between the US Embassy and the Contractor
Facility Manager: James Alden, (679)772-8605, and AdenJN@State.gov LE Facility Manager: Watisoni Seruvatu, (679)772-7314, and SeruvatuWK@State.gov mailto:AdenJN@State.gov mailto:SeruvatuWK@State.gov
15. SUBMISSION OF INVOICES
The Contractor shall submit an invoice after each preventive maintenance service has been performed. Invoices must be accompanied by a signed copy of the Maintenance Checklist for the work performed including parts replacement and break down calls, if any. No invoice for preventive maintenance services will be considered for payment unless accompanied by the relevant documentation.
The Contractor should expect payment 30 days after completion of service or 30 days after receipt of a proper invoice at the Embassy's payment office, whichever is later. Invoices shall be sent to:
AMERICAN EMBASSY SUVA
FMO
158 PRINCES ROAD
SUVA, FIJI
Exhibit A - - SCOPE OF WORK
I. GENERAL INFORMATION:
The United States Embassy in SUVA, FIJI requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Multistack Air Cooled Package Modular System.
II. DESCRIPTION OF EQUIPMENT *:
Multistack, Airstack Air Cooled Package Modules Chiller System WTFO-15A, Serial # 15-A-00G-02P-O. with associated Glycol Feeder, Pump and associated compressors WTFO-15A-JH-05-157, WTFO-15A-JH-05-158 &
WTFO-15A-JH-05-159
III. GENERAL REQUIREMENTS:
The Contractor under this SOW will be responsible for labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. Embassy staff has service manuals for all
IV. SCOPE OF WORK - - CHILLER PREVENTIVE MAINTENANCE
Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO). Safety Data Sheets (SDS) shall be provided by the Contractor for all HAZMAT materials. Copies will be provided to the COR for approval.
If any discrepancies are found with the MultiStack Air Cooled Package Modular Chillers that are not covered under this scope of work then the contractor must provide the following:
1. Detailed report noting the discrepancy found.
2. Bill of Materials (BOM) to include component name, quantity, part #, and price for any repair material required and material lead time.
3. Price quote for repair labor.
Annual Schedule – At a minimum, the following work must be done:
Annual Maintenance requirements for MultiStack ASP Chillers require proper shut-down of the machine, the contractor must ensure that all the current Manufacturer’s Preventative Maintenance bulletin are on hand and that all the manufacturer’s instructions and recommendations are strictly adhered to.
Electrical Controls
1. Check all external interlocks
2. Inspect compressor terminals
3. Check compressor crankcase heater operation
4. Tighten all contactor, relay and circuit breaker terminals
5. Check and calibrate all compressor safety controls
6. Check and record voltage and amperage for compressors
7. Check and record amperage for pumps and condenser fans
8. Check and calibrate low ambient/fan cycling controls
9. Inspect relay contacts for damage or pitting
10. Verify condenser fan operation
11. Verify temperature sensors
Refrigeration Components
1. Analyze refrigerant with tube type moisture/acid analyzer
2. Check and record refrigerant sub-cooling and superheat
3. Check liquid solenoid valves
4. Check expansion valve and sensing bulb connection
5. Clean condenser coils
6. Perform operation check on each module
Chilled Water System
1. Clean pump strainers and system strainers
2. Remove head caps and clean the ECHW strainers in accordance with the MultiStack Annual Cleaning Procedure.
3. Check glycol, inhibitor content in system chilled water.
Cabinet and Related Hardware
1. Dry clean electrical panels remove debris
2. Apply protective coatings or wax if required.
Update Maintenance Log Book
SECTION 2 - CONTRACT CLAUSES
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERICAL ITEMS (MAY 2014), is incorporated by reference (see SF-1449, Block 27A)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—
COMMERCIAL ITEMS (OCT 2014)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)).
___Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004)"(Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note).
_X_ (5) [Reserved].
_X_ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
_X_ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) (Pub. L. 111- 117, section 743 of Div. C).
__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Aug 2013) (31 U.S.C. 6101 note).
__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).
__ (10) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (May 2012) (section 738 of Division C of Pub. L. 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161).
__ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
__ (ii) Alternate I (Nov 2011) of 52.219-3.
__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (ii) Alternate I (Jan 2011) of 52.219-4.
__ (13) [Reserved] __ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).
__ (ii) Alternate I (Nov 2011).
__ (iii) Alternate II (Nov 2011).
__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
__ (ii) Alternate I (Oct 1995) of 52.219-7.
__ (iii) Alternate II (Mar 2004) of 52.219-7.
__ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)).
http://acquisition.gov/far/current/html/52_222.html#wp1151848 http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_222.html#wp1151848 http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_233_240.html#wp1113329 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_233_240.html#wp1113344 http://uscode.house.gov/ http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_200_206.html#wp1137622 http://uscode.house.gov/ http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_200_206.html#wp1141983 http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_200_206.html#wp1144881 http://acquisition.gov/far/current/html/52_200_206.html#wp1141649 http://uscode.house.gov/ http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_200_206.html#wp1151163 http://acquisition.gov/far/current/html/52_200_206.html#wp1151299 http://acquisition.gov/far/current/html/52_207_211.html#wp1140926 http://acquisition.gov/far/current/html/52_207_211.html#wp1145644 http://acquisition.gov/far/current/html/52_207_211.html#wp1146366 http://acquisition.gov/far/current/html/52_217_221.html#wp1135955 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_217_221.html#wp1135955 http://acquisition.gov/far/current/html/52_217_221.html#wp1135970 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_217_221.html#wp1135970 http://acquisition.gov/far/current/html/52_217_221.html#wp1136004 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_217_221.html#wp1136017 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_217_221.html#wp1136017 http://acquisition.gov/far/current/html/52_217_221.html#wp1136017 http://acquisition.gov/far/current/html/52_217_221.html#wp1136032 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20
__ (17)(i) 52.219-9, Small Business Subcontracting Plan (Oct 2014) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Oct 2001) of 52.219-9.
__ (iii) Alternate II (Oct 2001) of 52.219-9.
__ (iv) Alternate III (Oct 2014) of 52.219-9.
__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011)(15 U.S.C. 644(r)).
__ (19) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)).
__ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657 f).
__ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C. 632(a)(2)).
__ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (Jul 2013) (15 U.S.C. 637(m)).
__ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (Jul 2013) (15 U.S.C. 637(m)).
__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
_X_ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2014) (E.O. 13126).
_X_ (27) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).
_X_ (28) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).
_X_ (29) 52.222-35, Equal Opportunity for Veterans (Jul 2014)(38 U.S.C. 4212).
__ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
__ (31) 52.222-37, Employment Reports on Veterans (Jul 2014) (38 U.S.C. 4212).
__ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
__ (33) 52.222-54, Employment Eligibility Verification (Aug 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
__ (34)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (35)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O. 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-13.
__ (36)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (E.O. 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-14.
__ (37) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
__ (38)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Jun 2014) (E.O. 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-16.
_X_ (39) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
__ (40) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).
__ (41)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I (May 2014) of 52.225-3.
__ (iii) Alternate II (May 2014) of 52.225-3.
__ (iv) Alternate III (May 2014) of 52.225-3.
__ (42) 52.225-5, Trade Agreements (Nov 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
_X_ (43) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (44) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
__ (45) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
__ (46) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
http://acquisition.gov/far/current/html/52_217_221.html#wp1136058 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_217_221.html#wp1136058 http://acquisition.gov/far/current/html/52_217_221.html#wp1136058 http://acquisition.gov/far/current/html/52_217_221.html#wp1136058 http://acquisition.gov/far/current/html/52_217_221.html#wp1136174 http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_217_221.html#wp1136175 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_217_221.html#wp1136186 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_217_221.html#wp1136387 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_217_221.html#wp1139913 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_217_221.html#wp1144950 http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_217_221.html#wp1144420 http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_222.html#wp1147479 http://acquisition.gov/far/current/html/52_222.html#wp1147630 http://acquisition.gov/far/current/html/52_222.html#wp1147656 http://acquisition.gov/far/current/html/52_222.html#wp1147711 http://acquisition.gov/far/current/html/52_222.html#wp1158632 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t37t40+200+2++%2838%29%20%20AND%20%28%2838%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_222.html#wp1162802 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+2+78++%2829%29%20%20AND%20%28%2829%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_222.html#wp1148123 http://acquisition.gov/far/current/html/52_222.html#wp1160019 http://acquisition.gov/far/current/html/52_222.html#wp1156645 http://acquisition.gov/far/current/html/Subpart%2022_18.html#wp1089948 http://acquisition.gov/far/current/html/52_223_226.html#wp1168892 http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_223_226.html#wp1168892 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+250+1286++%2842%29%20%20AND%20%28%2842%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://acquisition.gov/far/current/html/52_223_226.html#wp1168933 http://acquisition.gov/far/current/html/52_223_226.html#wp1168933 http://acquisition.gov/far/current/html/52_223_226.html#wp1194330 http://acquisition.gov/far/current/html/52_223_226.html#wp1194330 http://acquisition.gov/far/current/html/52_223_226.html#wp1194323 http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_223_226.html#wp1179078 http://acquisition.gov/far/current/html/52_223_226.html#wp1179078 http://acquisition.gov/far/current/html/52_223_226.html#wp1188603 http://acquisition.gov/far/current/html/52_223_226.html#wp1192900 http://uscode.house.gov/ http://acquisition.gov/far/current/html/52_223_226.html#wp1169038 http://uscode.house.gov/…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .