This is a Solicitation/Contract/Order for Commercial Products and Commercial Services (Standard Form 1449) issued by NAVSUP Weapon Systems Support for the repair of two Switch Assemblies (NSN 5930-01-256-8723, P/N D-20900). The contract is set aside for Women-Owned Small Business (WOSB) and specifically for Foreign Military Sales (FMS) Case TW-P-P-MCI. The solicitation requests a repair turnaround time (RTAT) and includes provisions for price reductions if the contractor does not meet the specified repair timeline. The contract includes detailed requirements for unique item identification, packaging, configuration management, hazardous material handling, and Commercial Asset Visibility (CAV) reporting. The repair will be performed under a firm-fixed price arrangement, with two specific serial-numbered units to be repaired, and delivery is expected within 180 calendar days from the date of award to Round the World Logistics in Linden, New Jersey.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
See Schedule
See Section G - Contract Administration Data
See Schedule
N0010424PR26381 51
N0010425QX044
SHERRY KAYLOR
717-605-2640
13 Sep 2025
04:00 PM
N00104
NAVSUP WEAPON SYSTEMS SUPPORT MECH
P O BOX 2020, 5450 CARLISLE PIKE
MECHANICSBURG, PA 17050-0788
UNITED STATES
SHERRY KAYLOR, Email: sherry.l.kaylor.civ@us.navy.mil Telephone: 717-605-
335313
See Schedule
Section A - Solicitation/Contract Form
SWITCH ASSEMBLY_FMS Repair
A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to sherry.l.
kaylor.civ@us.navy.mil
B. General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting.
C. This RFQ is for REPAIR. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.
D. Only a firm-fixed (FFP), not-to-exceed (NTE), or estimated (EST) price for the REPAIR of the subject item(s) will be accepted. Quotes limited to test and evaluation (T&E) will NOT be accepted. The quoted price MUST be for the REPAIR of the item(s).
E. Must adhere to IUID requirements of DFARS 252.211-7003
F. The ultimate awardee of the proposed contract action must be an authorized repair source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization.
G. The Government is requesting a Repair Turnaround Time (RTAT) of: ## ______ days after receipt of asset.
Repair Turnaround Time (RTAT) definition: The resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
Please note freight is handled by Navy CAV or Proxy CAV as stated in NAVSUPWSSFA24 or NAVSUPWSSFA25.
Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences: _____/month (contractor is to fill in #). A throughput of "0" (zero) per month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
H. IMPORTANT NOTE:
Reconciliation Price Reduction:
Any asset(s) for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late. However, any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If the contractor does not meet the required RTAT due to inexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "Reconciliation Modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default.
In reference to the above important note, the contractor provides the following price reduction amount per unit/per month the contractor does not meet the RTAT: $___________, up to a maximum of: $__________. (vendor is to fill in amount)
I. Your quote MUST include the following information for justification purposes:
- Repair unit price ________________
- Total price________________
- Repair Turnaround Time (RTAT) _____________ days NOTE: If you are not quoting the Government's Requested Repair Turnaround Time (RTAT) or sooner, you must provide your company's capacity constraints below:
- Indicate Price Type:
Firm-Fixed-Price _____ Not-to-Exceed (Ceiling Price) _____ Estimated _____
- New unit price_________________
- New unit delivery lead time____________ days
N0010425QX044
- T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR/BER, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment.
- The T&E fee (if asset is determined BR/BER) was determined based on:
- Award to CAGE:________
- Inspection & Acceptance CAGE, if not the same as Award to CAGE: _________
- Facility/Subcontractor CAGE (where the asset should be shipped to), if not same as Award to CAGE. __________
- Facility/Subcontractor or Packaging Facility CAGE (where the asset will be shipped from), if not the same as Award to CAGE. ________
- Basis of quoted pricing:
> Estimated costs____ > Historical repair pricing___ >Other ______________________________________________
- Cost breakdown requested, including profit rate (if feasible).
- Quote expiration date _______________________ (MIN of 90 Days is requested).
- Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example)
Send a notification of shipment to both the POC and NAVSUP WSS Repair Manager listed below:
Travis Brunson
Phone: 717-605-6208
Email: travis.r.brunson.civ@us.navy.mil
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
FMS Case NU: TW-P-P-MCI Quantity: 2
NSN: 5930012568723
P/N: D-20900 Nomen: SWITCH ASSEMBLY
Manufacturer's Part Number: D-20900 National Stock Number: 5930012568723 Pricing Arrangement: Firm Fixed Price PR Number: NOPR PR Line Item Number: 0001
2 Each
000101 Serial # 8915
REQ: PTWBE431220356
ACR: AA
000102 Serial # D20903 Req: PTWBE431220357
ACR: AA
Additional Regulation or Supplemental Clauses Incorporated by Full Text
WSSTERMBA00 CONTACT INFORMATION (JAN 2021) (Jan 2025)
When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.
Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:
Code N774.10 Weapon System LRC: HAS
Telephone: Please refer to email
E-Mail: sherry.l.kaylor.civ@us.navy.mil
In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.
fct@navy.mil.
WSSTERMBZ01 IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION
REPORTING (SEP 2023)
(Jan 2025)
Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts. These requirements are detailed in Section F, and the contractor should read this section carefully to ensure compliance. Detailed information on Commercial Asset Visibility (CAV) Repairables Portal (RP) reporting requirements can be found in the CAV Statement of Work (SOW) located at:
https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/
Questions can be addressed to usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil for NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104).
WSSTERMBZ04 IMPORTANT NOTICE REGARDING HAZARDOUS MATERIAL (OCT 2006) (Jan 2025)
FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data, is incorporated by reference in Section I in this solicitation and requires offerors to--
(1) identify any hazardous material (defined in FED STD 313 as an item or chemical which is a "health or physical hazard" per OSHA in 29 CFR 1910.1200) that will be delivered under a resultant contract, and
(2) provide a Material Safety Data Sheet meeting OSHA/FED STD 313 requirements for all hazardous material identified.
While not an all-inclusive listing of hazardous material, at a minimum, any item with a four-digit Federal Supply Code (FSC), which correlates to the first four positions of the National Stock Number (NSN), of 6810, 6820, 6830, 6840, 6850, 7930, 8010, 8030, 8040, 9110, 9135, 9140, 9150, or 9160 is considered hazardous material and requires submission of a Material Safety Data Sheet or an appropriate representation that there is no hazardous material contained in the item.
Failure to provide the required information and documentation may render you ineligible for award. If you have questions about whether a solicited item is classified as hazardous, contact the NAVICP HAZMAT point of contact, NAVSUP WSS Code N26 Director Jeff Whitman, at (564) 230-3019 or .jeff.w.whitman.civ@us.navy.mil
Section C - Description/Specifications/Statement of Work
CLIN: 0001
NIIN: 012568723
ITEM NAME: SWITCH ASSEMBLY
1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the SWITCH
.ASSEMBLY
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
3. REQUIREMENTS
3.1 Cage Code/Reference Number Items - The repaired under this contract/purchase order shall SWITCH ASSEMBLY meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractor's repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.
Cage 0BXF1 Ref. No. D-20900
3.2 Marking - PACKAGING AND MARKING SHALL BE IN ACCORDANCE WITH BEST STANDARD
COMMERCIAL PACKAGING FOR OVERSEAS SHIPMENT.
3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVSUP-WSS- MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:
Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVSUP-WSS-MECH immediately of the new part number.
Code 2: Assembly (or set or kit) not furnished - Used following detail parts.
Code 3: Part not furnished separately - Use assembly.
Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old.
Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable.
Code 5: Part redesigned - New part replaces old. Old part cannot replace new.
Code 6: Part redesigned - Parts not interchangeable.
3.4 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-
STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O.
Box 2020, Mechanicsburg Pa. 17055-0788.)
Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships3.5 and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection.
If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector.
Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.
The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard.
If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum). Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned.
These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.
Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:
Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine /surface ship atmosphere.
Requirements FMS Case NU: TW-P-P-MCI Quantity: 2
NSN: 5930012568723
P/N: D-20900 Nomen: SWITCH ASSEMBLY
Additional Regulation or Supplemental Clauses Incorporated by Full Text
WSSTERMCZ01 CONFIGURATION MANAGEMENT AND CONTROLS (DEC 2023) (Jan 2025)
Prescription: Required in all Navy Aviation (Phil only) solicitations/contracts
1.0 Configuration Management
1.1 The cognizant Naval Air Systems Command (NAVAIR) Program Manager will maintain configuration control and change authority for all items in this contract.
1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.
NOTE: The latest revisions of the DOD Forms referenced in this term can be found at https://www.esd.whs.mil/dd. The latest revisions of the DIDs referenced in this term can be found at https://quicksearch.dla.mil/.
2.0 Engineering Changes
2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP's are classified as Class I (Major) or Class II (Minor).
For detailed classification criteria refer to the DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI-SESS- 80639E, Engineering Change Proposal (ECP).
NOTE: Any ECP or notification of an ECP submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS CM Team at usn.philadelphia.navsupwssphil.mbx.configuration-management@us.navy.mil.
2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant NAVAIR Program Office prior to any Class I ECP submission. The Contractor must submit all Class I changes, via the Defense Contract Management Agency (DCMA) Contract Management Office (CMO) and the Procurement Contracting Officer (PCO), to the cognizant NAVAIR Program Office for approval
The Contractor must notify the PCO of any pending or approved Class I engineering changes with another or disapproval.
Government activity that the Contractor proposes to incorporate under this contract. The cognizant NAVAIR Program Office will approve or disapprove of all Class I changes. Any approved Class I change may necessitate contract changes by the contracting officer, which changes may be handled under the Changes clause of this contract, FAR 52.243-1. The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.
2.1.2 Any Class II change involving a Critical Safety Item (CSI) must be submitted to the PCO for Class II (Minor) Changes:
NAVAIR Program Office approval unless NAVAIR has delegated approval authority to the cognizant DCMA CMO. For Class II changes to items without a criticality determination, the items will be considered CSI for the purposes of processing in accordance with this paragraph. Class II changes related to non-CSI's must be submitted to the cognizant DCMA CMO for concurrence in classification and may be implemented only upon receiving DCMA concurrence. Class II changes must be made at no additional cost to the Government.
2.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.
3.0 Variances
3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's approved configuration. RFV's are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Any variance requests to CSI's must be classified as major, at a minimum. For variances to items without a criticality determination, the items will be considered CSI for the purposes of processing and classified as a major, at a minimum. Variance requests shall be prepared in accordance with DI-SESS- 80640E - Request for Variance (RFV).
NOTE: Any RFV submitted to the PCO in accordance with this paragraph must also be submitted to the NAVSUP WSS RFV Review Team at usn.philadelphia.navsupwssphil.mbx.rfv-review-team@us.navy.mil.
NOTE: Should a variance be discovered after product delivery, the Contractor must notify the PCO and NAVSUP WSS Quality (NOE_N22@us.navy.mil).
3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests, via the DCMA CMO and the PCO, to the cognizant NAVAIR Program Office for approval or disapproval. All approved critical/major variances require a contract modification by the PCO prior to final inspection and acceptance of the items.
3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until approved by the cognizant DCMA CMO.
3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a critical, major, or minor variance.
WSSTERMCZ05 CONFIGURATION MANAGEMENT – MARITIME (DEC 2023) (Jan 2025)
Prescription: Required in all Navy Maritime (Mech only) solicitations/contracts
1.0 Configuration Management
1.1 The cognizant systems command (SYSCOM), Naval Sea Systems Command (NAVSEA) or Naval Information Warfare Systems Command (NAVWAR), Program Manager will maintain configuration control and change authority for all items in this contract.
1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.
NOTE: The latest revisions of the DOD Forms referenced in this term can be found at https://www.esd.whs.mil/dd. The latest revisions of the DIDs referenced in this term can be found at https://quicksearch.dla.mil/.
2.0 Engineering Changes
2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP's are classified as either Class I (Major) or Class II (Minor). For detailed classification criteria refer to DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI- SESS-80639E, Engineering Change Proposal (ECP).
NOTE: Any ECP or notification of an ECP submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS CM Team at usn.philadelphia.navsupwssphil.mbx.configuration-management@us.navy.mil.
2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant SYSCOM Program Office prior to any Class I ECP submission. The Contractor must notify the Procurement Contracting Officer (PCO) of any pending or approved Class I engineering changes with another Government activity that the Contractor proposes to incorporate under this contract. The cognizant SYSCOM Program Office will approve or disapprove of Class I changes. Any approved Class I change may necessitate contract changes by the PCO, which changes may be handled under the Changes clause of this contract, FAR 52.243-1 The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.
2.1.2 Class II (Minor) Changes: Class II changes must be submitted to the cognizant Defense Contract Management Agency (DCMA) Contract Management Office (CMO), or to the Supervisor of Shipbuilding (SUPSHIP) Groton, for concurrence in classification and may be implemented only upon receiving DCMA, SUPSHIP, or NAVSEA/NAVWAR Technical Warrant Holder (TWH) concurrence. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit the Class II (Minor) change to the PCO for approval or disapproval. Class II changes must be made at no additional cost to the Government.
2.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.
3.0 Variances
3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline. RFVs are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Variance requests must be prepared in accordance with DI-SESS-80640E - Request for Variance (RFV).
NOTE: Any RFV submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS RFV Review Team at usn.philadelphia.navsupwssphil.mbx.rfv-review-team@us.navy.mil.
3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests via DCMA or SUPSHIP and the PCO, to the SYCOM Program Office or their delegated representative, for approval or disapproval. All approved critical/major variances require a contract modification by the PCO prior to final inspection and acceptance of the items.
3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until the request is approved by the cognizant DCMA CMO, SUPSHIP, or SYSCOM TWH. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit minor variance requests via DCMA or SUPSHIP and the PCO, to the SYSCOM Program Office or their delegated representative, for approval or disapproval.
3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a major/critical or minor variance.
Section D - Packaging and Marking
NIIN: 012568723
ITEM NAME: SWITCH ASSEMBLY
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.
Marking - PACKAGING AND MARKING SHALL BE IN ACCORDANCE WITH BEST STANDARD COMMERCIAL
PACKAGING FOR OVERSEAS SHIPMENT.
Additional Regulation or Supplemental Clauses Incorporated by Full Text
WSSTERMDZ03 PRESERVATION, PACKAGING, PACKING AND MARKING (NOV 2024) (Jan 2025)
PRESERVATION, PACKAGING, PACKING AND MARKING
The contractor shall preserve, package, pack and mark all items as cited below. Where specifications or standards are cited herein the latest revision of that specification or standard shall apply.
1. PRESERVATION REQUIREMENTS
a. SYSTEM STOCK SHIPMENTS - The contractor shall preserve all items intended to in enter the military distribution system for stock accordance with the MIL-STD-2073-1, "Standard Practice for Military Packaging", Packaging Requirements Code specified in the Schedule.
When a Specialized Preservation Code/Method of Preservation (MOP) (Table J-Ia) is specified, and one or more of the following packaging fields (WM, CUD, CT, UC) value is a 00 (numeric), the Specialized Preservation/MOP procedure and materials takes precedence. Contractors should disregard the LP field and third digit of the PACK field and use the Unit Container Level (UCL) to identify the level of packing protection the unit container meets for packing requirements. When HM = D, the item is regulated in accordance with Title 49 Code of Federal
; when HM = N the item is not regulated for transportation.Regulations (CFR)
1) When a specified packaging material has an associated Qualified Products List (QPL), the contractor shall use only packaging materials produced by a manufacturer listed on the applicable QPL. Barrier materials that have QPLs are MIL-PRF-131, MIL-PRF-81705, MIL-PRF- 22191, MIL-PRF-3420 and MIL-PRF-22019. Sources for QPL material can be obtained from the Qualified Products Database at http://qpldocs.dla.mil/.
b. IMMEDIATE USE/INSTALLATION AND PART NUMBER BUY SHIPMENTS - Government PCO or ACO approval is required to use the packaging standards outlined in this paragraph. Any national stock numbered (NSN) item required for immediate use (used or consumed within or part numbered item (authority granted to ship without NSN) shall be preserved and packed in 7 days of receipt) or direct installation, accordance with ASTM D3951, "Standard Practice for Commercial Packaging", for all shipments to a Continental United States (CONUS) government activity or contractor-owned facility. All material destined for overseas shipment (OCONUS) shall be preserved in accordance with
MIL-STD-2073-1.
c. GOVERNMENT-OWNED MATERIAL - In the event that the contract expires, is terminated, or completed, and Government-owned material is to be returned to the supply system, the contractor shall preserve and package this material in accordance with the requirements of paragraph 1.a.
2. PROTECTION FROM DEGRADATION DUE TO ELECTROSTATIC (ES)/ELECTROMAGNETIC (EM) FORCES
a. When ASTM D3951 is authorized for packaging and the item is considered Electrostatic Discharge Sensitive (ESDS), protection shall be in accordance with ANSI/ESD S20.20-2021, "For the Development of an ESD Control Program for - Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)."
b. When MIL-STD-2073-1 is specified and the preservation method code (PMT) in the solicitation does not specify ESD/EM protection (PMT = GX) and the contractor's proposed item of supply is subject to degradation from ES/EM forces, contractors shall provide recommended packaging data with their proposals/quotes.
3. PACKING REQUIREMENTS - The contractor shall pack as follows:
Domestic Shipments (CONUS): Level B
Overseas Shipments (OCONUS) (including Navy ships at sea):
Via air, FPO, APO Level B
Via freight forwarder Level B
Via surface Level A
Exterior shipping containers for Packing Levels A and B are listed in MIL-STD-2073-1, Appendix C, Table C.II. Long-life reusable containers and wood containers are shipping containers which do not require overpacking for shipment.
4. MARKING REQUIREMENTS - All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129. In addition, the following specific requirements apply:
a. ADDITIONAL MARKING FOR SPARES ONLY Each MIL-STD-129 label shall also include the following:-
1) Procurement Instrument Identifier (PIID) - the 13-digit contract order number,
2) Contract Line Item Number (CLIN) - the 4-digit individual line item number (e.g. 0001, 0002, etc.), and
3) SubCLIN - the 6-digit sub line item number (e.g. 0001AA, 0001AB, 0002AA, 0002AB, etc.).
b. DEPOT LEVEL REPAIRABLE (DLR) LABELS
1) Items identified with a Cognizance (COG) Code of either "7" or an even number preceding the NSN, excluding 6A, 6H and 6X COGs (e.
g. 7RH 5826-014289999), are defined as Depot Level Repairable (DLR) items. DLR items require that a DLR label be placed on the outside of the unit, intermediate and shipping containers as close to the bar code label as possible.
2) Labels are available via the Naval Forms Online website: . The website will advise the https://forms.documentservices.dla.mil/order/ procedures for ordering and establishing an account.
3) NAVSUP WSS authorizes contractors to create and print their own DLR labels.
Labels shall follow the standard size and font options listed in below chart. Text shall be in all upper case letters of the same style font. The label used shall be sized proportionate to the size of the container. Labels shall be horizontally printed and consist of yellow "DLR" text font on a solid blue background. Labels shall meet requirements of MIL-STD-129 section 4.2.2. Labels shall be of a water-resistant grade of paper, film, or plastic, coated on one side with water-insoluble, permanent type adhesive. The adhesive shall adhere to metal, plastic, aluminum or fiberboard surfaces under high and low temperatures. Labels shall have a finish suitable for printing and writing on with ink without feathering or spreading, be capable of withstanding normal handling and storage conditions, and remain securely in position. Application specific performance criteria and durability requirements to ensure functionality in various climatic environments should be tailored, if required, using MIL-PRF-61002. MIL-PRF-61002 can be used as an acquisition tool when labels presently being used are not performing satisfactorily or when new conditions or applications require special label stock for those particular situations.
NSN DESCRIPTION
QUANTITY
PER UNIT PACKAGE
APPLICATION FORM NUMBER
0108LF5055300
DLR Label
2 in. x 3 in.
Unit
Container
NAVSUP 1397-1
0108LF5055000
DLR Label
3 in. x 5 in.
Intermediate / Shipping
Container
NAVSUP 1397
c. SPECIAL MATERIAL IDENTIFICATION CODE (SMIC) FOR NAVSUP WSS MARITIME REQUIREMENTS ONLY
1) Certain program related items are identified by a two-position SMIC, which appears as a suffix to the NSN (e.g. 1H 4730 009001317 L1), and require special markings. Containers shall be marked or labeled with letters, maximum two inches high on two (2) sides and two
(2) ends as follows:
SMIC MARKINGS COLOR TYPE CONTAINER
L1 LEVEL 1 RED Unit, intermediate and shipping (size permitting)
S1
SURFACE
LEVEL 1
RED Unit, intermediate and shipping (size permitting)
D4/D5/D7 DSS-SOC RED Unit, intermediate and shipping (size permitting)
C1 *
LEVEL 1 SPECIAL
CLEAN O2-N2
GREEN Unit, intermediate and shipping
CP/VG *
SPECIAL CLEAN
O2-N2 GREEN Unit, intermediate and shipping
D0/D6/D8 * DSS-SOC SPECIAL CLEAN O2-N2 GREEN Unit, intermediate and shipping
VU FBW SFCC VU BLUE Unit, intermediate and shipping (size permitting)
SW FBW SFCC SW BLUE Unit, intermediate and shipping (size permitting)
Q3/Q5 Q3 or Q5 RED Unit, intermediate and shipping
* denotes Oxygen Clean requirements in accordance with MIL-STD-1330 "Precision Cleaning and Testing of Shipboard Oxygen, Helium, Helium- Oxygen, Nitrogen, and Hydrogen Systems."
5. PALLETIZATION. Palletization of shipments shall be accomplished in accordance with MIL-STD-147 "DOD Standard Practice: Palletized Unit Loads." Failure to meet these palletization/packaging requirements and measures, without a written waiver from the PCO or ACO, may result in charges back to the contractor for repalletization and/or repackaging of items. Pallets shall conform to the requirements of American National Standards Institute, Material Handling-MH1-2016, Pallets, Slip Sheets, and Other Bases for Unit Loads. MH1-2016 may be obtained at the following website: http://www.mhi.org
a. General Purpose Unit Loads - When shipping directly to a Navy afloat unit, pallets meeting MH1-2016, Part No. MH1/9-02SW4048 or MH1 /9-10BW4048 for unit loads under 1,500 pounds and MH1/9-03SW4048 for unit loads over 1,500 pounds shall be used.
b. Hazardous Material Unit Loads - Unless otherwise specified in the contract or purchase order hazardous material containers, except cylinders and 55 gallon drums, shall be palletized utilizing MH1-2016 Part No. MH1/9-07SW4848 pallets.
c. Use of nonstandard commercial pallets is prohibited.
6. WOOD PACKAGING MATERIAL (WPM). All shipments destined to the DOD must be treated and marked in accordance with the International Standards for Phytosanitary Measures Guidelines for Regulating Wood Packaging Material in International Trade ( ) for ISPM 15 OCONUS shipments.
a. For all WPM furnished under this contract the contractor shall ensure the American Lumber Standards Committee (ALSC) approved mark is applied to every shipment regardless of destination.
b. Failure to comply with the requirements of ISPM 15 may result in refusal of the shipment, destruction or corrective treatment of WPM at the point of receipt and the associated costs charged back to the contractor.
7. NAVY SHELF-LIFE PROGRAM. Navy shelf-life requirements are listed under the item description in a 3-digit alpha/numeric code. Position one (1) is the DOD shelf-life code, defining the type of shelf-life for an item (Type I, non-extendible or Type II, extendible), and the number of months an item can remain ready for issue in a Navy specified package. Positions two (2) and three (3) combined form the Navy-unique shelf-life action codes used by storage activities, and do not impose any requirements on the contractor. The contractor shall use the applicable shelf-life paragraphs and table in MIL-STD-129 to apply either Type I or Type II shelf-life markings to an item's unit, intermediate and shipping containers. Contractors will ensure that at least eighty-five percent (85%) of the Navy shelf-life requirement is remaining when received by the first government activity.
8. REUSABLE NSN CONTAINERS. An item that has an NSN assigned in the "Container NSN" field (e.g. 8145 012622982) requires shipment in a reusable shipping and storage container.
a. REUSABLE CONTAINERS FOR NAVSUP WSS, MARITIME REQUIREMENTS - Reusable NSN containers for maritime material (designated by a COG Code of "7E", "7G" and "7H") shall be provided as contractor-furnished material (CFM).
b. REUSABLE CONTAINERS FOR NAVSUP WSS, AVIATION REQUIREMENTS - Reusable NSN containers (excluding fiberboard and most wood) for aviation material (designated by a COG Code of "7R", "6K" or "0R") shall be provided as government-furnished material (GFM).
Fast pack containers will not be provided as GFM. To obtain GFM reusable containers, the contractor must request via email usn.philadelphia.
navsupwssphil.mbx.navsupcrf@us.navy.mil at least 90 days prior to the anticipated shipping date, 30 days prior for repair contracts. If the Navy's Container Management Area (CMA) informs the contractor that containers are unavailable, the following alternate packaging requirements apply. The unavailability of reusable containers shall not be an excusable delivery delay.
ALTERNATE PACKAGING REQUIREMENTS FOR ITEMS ASSIGNED THE FOLLOWING CONTAINERS
Container NSN Container Part Number (80132) Alternate Packaging Code
IAW MIL-STD-2073-1
8145 002609548 P069-2
N 001 000 GX 1 00 K3 LT B ED
UCL = B
SPMK = 39
PACK = QFF
8145 002609556 P069-1
8145 002609559 P069-3
8145 002609562 P069-4
8145 010124088 P069-6
8145 010140440 P069-5
8145 011644073 P069-7
8145 012622982 15450-1
If MOP/PMT = GX
N 001 000 GX 1 00 K3 GH Z ED
Z= use 1.5" of "GH" cushioning between barrier bag and Unit Container
UCL = B
SPMK = 39
PACK = QFF
For all other MOPs/PMTs
N 001 000 51 1 00 EA GH F ED
UCL = B
SPMK = 03
PACK = QFF
8145 012622983 15450-2
8145 012622984 15450-3
8145 012622985 15450-4
8145 012622986 15450-5
8145 012622987 15450-6
8145 012622988 15450-7
c. All excess empty reusable shipping and storage containers shall be turned-in to the nearest Container Reuse and Refurbishment Center (CRRC). CRRC locations/points of contact: Program Manager - 215-697-2063
Norfolk, VA - 757-445-9099 ext. 124 Yokosuka, JAPAN - 011-81-46-816-6304
Cherry Point, NC - 252-466-2331 Lemoore, CA - 559-998-0220
Jacksonville, FL - 904-542-1014 Okinawa, JAPAN - 011-81-46-816-6304
San Diego, CA - 619-545-8360 Iwakuni, JAPAN - 011-81-46-816-6304
Puget Sound, WA - 360-476-9777 Bahrain - 011-318-439-9553
d. The stock-numbered, long-life, reusable containers identified herein as GFM are property of the U.S. Navy and only shall be used to fulfill orders from the Navy and U.S. Marine Corps; these containers shall not be used to fulfill orders from the U.S. Army, U.S. Air Force, any other agency of the U.S. Government or Foreign Military Sales (FMS) customer.
9. REUSABLE NSN CONTAINERS FOR FOREIGN MILITARY SALES (FMS), JOINT PROGRAM OFFICE (JPO) OR OTHER
FOREIGN FORCES ACQUISITION
a. Reusable shipping and storage containers shall be provided as CONTRACTOR-FURNISHED MATERIAL (CFM), unless otherwise specified.
b. Contractors may tender offers including alternate, non-reusable, packaging methods and be considered responsive.
10. HAZARDOUS MATERIALS. This section applies when items to be delivered under this contract are considered hazardous materials as defined by 49 CFR, FED-STD-313, or by the Government's technical representative.
a. Packaging and marking for hazardous materials shall comply with applicable requirements for Performance Oriented Packaging (POP) contained in 49 CFR and the international modal regulations. All performance test requirements shall be supported by test certificates and reports attesting to the date and the results obtained from performance oriented packaging testing. The contractor shall be responsible for assuring that sources providing performance testing services are registered with the U.S. Department of Transportation (DOT). The contractor's signed certification that the packaged configuration meets the applicable modal regulation shall be incorporated on the Wide Area Workflow Receiving Report (WAWF RR), DD Form 250, Material Inspection and Receiving Report, or other related acceptance documents if a WAWF RR, DD Form 250 is not used. The Shipper's Declaration for Dangerous Goods (SDDG) must be included for all air shipments. All test certificates, reports and training records shall be available for inspection by authorized Government representatives for a period of three years.
b. When a contract/order for hazardous material requires shipment to a military aerial port or through a military container consolidation point including DODAACs SW3225, SW3123, SW3142, N45627, FB4427, FB9150, FB4497, FY8910, FY9125, FB4418, FY4462, FB4484, FB4479, those shipments shall comply with NAVSUP PUB 505/AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipment.
11. SAFETY DATA SHEETS. As required by clauses FAR 52.223-3 "Hazardous Material Identification and Material Safety Data" and DFARS 252.223-7001 "Hazard Warning Labels" the contractor/offeror is required to list any hazardous material to be delivered under the resultant contract by the submission of Safety Data Sheets (SDSs) and Globally Harmonized System (GHS) compliant product label, when applicable, to the NAVSUP WSS or DLA Contracting Officer prior to award. An electronic copy in PDF format of the SDS and GHS product label must also be emailed to NAVSUP WSS Code N242 at Please include the NSN, CAGE, Part Number, quantity of NAVSUPWSSMECH.HAZMAT@US.NAVY.MIL.
hazardous material, contract number, and point of contact for hazardous material questions in the body of the email.
12. REPACKAGING TO CORRECT PACKAGING DEFICIENCIES
a. Notwithstanding inspection and acceptance by the Government of items furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the contractor guarantees that the preservation, packaging, packing and marking (PPP&M), and the preparation of, and method of shipment of such items will conform to the requirements of this contract.
b. Items that do not conform to the PPP&M requirements of this contract may have a Supply Discrepancy Report (SDR, SF-364) written against the contractor at the time of receipt.
c. The Government may at the option of the PCO or ACO, correct PPP&M deficiencies, without prior contractor notification, and require an equitable adjustment in the contract price to cover labor and material when corrective actions are warranted, or return the non-conforming material to the contractor for repackaging at the contractor's expense.
Section E - Inspection and Acceptance
NIIN: 012568723
ITEM NAME: SWITCH ASSEMBLY
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material.
4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.
4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings.
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-16 Responsibility for Supplies. Apr 1984
Additional Regulation or Supplemental Clauses Incorporated by Full Text
WSSTERMEZ03 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) (Jan 2025)
(a)
NOTE: When the "OTHER" block is selected, please identify the industry, military, or international Quality Management System that you intend to use. Your proposed system will be reviewed and assessed for suitability and equivalency.
(b) Measuring and Test Equipment
NOTE: When the "OTHER" block is selected, please identify the industry, military, or international Calibration Standard that you intend to use. Your proposed standard will be reviewed and assessed for suitability and equivalency.
(c) The contractor shall use and be compliant with the revision of the applicable Quality Management System and Calibration Standard in effect at time of the offeror's latest proposal submission.
Enclosure (1)
WSSTERMEZ04 INSPECTION AND ACCEPTANCE – SHORT VERSION (JUN 2002) (Jan 2025)
Supplies furnished hereunder shall be inspected at . Acceptance shall be at .
Manufacturing Site:
Address:
If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:
Packaging House:
Address:
Section F - Deliveries or Performance
Government Origin (Shipping Point)
Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes
Delivery Schedule From date of lead time event to delivery 180 Calendar Days Date of Award
2 Each Ship To DoDAAC: PTW004 CountryCode: USA
NOT SPECIFIED
ROUND THE WORLD LOGISTICS (USA), 333
CANTOR AVE, UNIT C
LINDEN, NJ 07036
UNITED STATES
JANE CHOU, Freight Forwarder East Coast Email: janechou@us.evergreen-logistics.com Telephone: 908 862 3535
000101 FoB Details Government Origin (Shipping Point)
000102 FoB Details Government Origin (Shipping Point)
FAR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .