SCOPE OF WORK-ZSU Propane Solicitation-March 2022 (002).docx

DOCX document 19 KB Posted

Attached to
Zuni Service Unit Propane Refill Services Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document outlines a scope of work for propane refill services and a related sources sought notice. The scope of work details safety procedures and inspection requirements for filling three large storage tanks at a hospital and smaller tanks at government housing units in Zuni, New Mexico. It seeks a contractor to purchase propane and make deliveries on an as-needed basis. The sources sought notice is to determine if qualified small business Indian firms or small businesses can provide the propane refill services. Interested parties must register in SAM and respond by March 31 with company information, socioeconomic status, and a capabilities statement demonstrating relevant experience filling large propane tanks and managing fuel services for a health facility and housing. The response will help the Albuquerque Area Indian Health Service determine the appropriate acquisition method, including whether a total small business set-aside is feasible.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

FILLING STORAGE CORGO LP PROPANE TANKS FOR ZUNI IHS HOSPTIAL

HOSPITAL AND GOVERNMENT HOUSING UNITS

I. SUMMARY:

The purpose of this contracts to purchase LP Propane Gas for Zuni Comprehensive Community Health Center Hospital’s three (3) 12,000 gallon tanks to supply propane gas for 4 low pressure boilers, 8 tank less water heater and kitchen stove and ovens. Also to purchase propane for the Government Housing units eighteen (30) 250 gallon tanks and thirteen (13) 500 gallon tanks to supply propane gas for residential houses furnaces, kitchen ovens and stoves. With the recent dramatic increase in fuel cost, purchase of propane gas will exceed the $1,000,000 level for the three vendors identified for each.

Delivery shall be made only when requested by a designated Authorized Ordering Official. The contractor shall submit all copies to the Zuni Hospital Maintenance Department, Hwy RT 301 North B-avenue P.O. Box 467, Zuni, New Mexico 87327-0467.

II. PROJECT SCOPE AND DESCRIPTION:

A. DESCRIPTION OF PROJECT – SAFETY PRECAUTIONS AND PROCEDURES:

1. Check area for hazardous conditions and possible sources of ignition. Sources of ignition capable of igniting LP gas are not permitted near a point of transfer. If any are found, further operation should be delayed until the situation is corrected. Be sure the vehicle is equipped with an 18 lbs. B: C dry chemical fire extinguisher.

2. Park vehicle in proper position and location to make delivery.

3. Set Parking brakes and place chocks to prevent rolling of vehicle

4. Before connecting to customer storage tank, check the name plate on the tank to be sure it is the proper tank and belongs to the Zuni Indian Health Service Hospital and Government housing units.

B. PROPANE TANK – STORAGE CONTAINERS:

1. For propane, the tank must have a minimum design pressure of at least 250 psi. Tanks marked 200 psi manufactured under Par-U-68 and U-69 of 1949 or earlier editions of ASME code are acceptable for propane storage, reference NFPA 58.

C. FILLING PROPANE TANK – FILLING PROPANE TANK FROM BOBTAIL TRUCK:

1. The following procedures for filling propane storage containers for Zuni Hospital and government housing units from Bobtails in metered delivery truck service are based on common industry practices, manufacturer’s Instructions, provisions listed in NFPA 58, 2001 edition. Liquefied Petroleum Gas Code and U.S. DOT cargo tank unloading regulations.

2. To make the maximum allowable fill:

Rotary Gauge. Set the gauge to the maximum allowable fill percent for the current product temperature. Open the fixed liquid level gauge and leave it open throughout the delivery. Close the delivery hose valve immediately when the fixed liquid level gauge valve delivers liquid (white mist). Close the fixed liquid gauge.

Maximum Fill Bleeder. Open the fixed liquid level gauge to the maximum fixed liquid level and check the gauge frequently throughout delivery. Close the delivery hose valve immediately when white mist appears at the fixed liquid level gauge. Close the fixed liquid level gauge.

D. CHECK AREA FOR POSSIBLE SOURCE OF IGNITION:

1. According to the Department of Transportation, CFR 49, Part 397.13 no person may smoke or carry a lighted cigarette, cigar or pipe on or within 25 feet of: (1) a motor vehicle which contains explosives, oxidizing materials, or flammable materials, or (2) an empty tank motor vehicle which has been used to transport flammable liquids or gases and which when used was required to be marked or placarded in accordance with U.S. DOT regulations.

2. Survey the Storage Area. Before positioning the delivery vehicle, survey the storage area on foot. If the tank container cannot be seen from the cab of the truck, the driver shall stop the engine, engage the parking brake and set the chock blocks.

E. INSPECT THE HOSPITAL/GOVERNMENT HOUSING UNIT ABOVE GROUND PROPANE TANK SYSTEM:

1. The delivery Driver is required by various regulations and industry standards, including DOT and NFPA 58, to check various portions of the propane system whenever a delivery is made. Before proceeding with the delivery, visually check the following conditions:

A. Storage Containers: The distances required by NFPA 58 are maintained. The point of transfer is at least 25 feet from ignition. Storage container(s) are on a stable footing. There is no evidence of excessive corrosion. It does not need painting. There is no evidence of leakage. The gauges are working properly. Valves are protected with a hood, dome, or cover.

B. Regulators: The regulator is located so that it will not be affected by the elements (freezing rain, sleet, snow, ice, mud or debris). There is no evidence leaking. The vent is terminated a minimum of three feet from a building opening. The vent opening is pointing down (in the 6 o’clock position) or under the cover.

C. Filter Valve: The protective cap on the filler valve is in place. There is no evidence of leaking. There is no evidence of debris in the valve. The delivery hose end valve is free of debris. The delivery hose end valve was free of debris prior to connecting to the container filler valve.

F. Close Out:

The contractor shall provide (2) copies of all propane gas delivery invoices. The documents to include calculations of cost and gallons delivered, and preventive maintenance instructions, and testing and inspections.

File details come from the government source that posted it. Updated .