Scope of Work Objective: The objective of this requirement is to conduct the work listed below onboard the Motor Vessel Sangamon and the Motor Vessel Beardstown for increased safety and to prevent the engines from overheating.
Scope:
MV Beardstown: The contractor shall provide all labor, materials, equipment, tools, crane, and crane operator to conduct the following work (quotes will include transport of vessels to maintenance location as an option).
A. Remove latching winch controls and install non-latching controls to the head deck and the wheelhouse dashboard.
B. Remove phase converter and install VFD’s for winches.
C. Install 200W Xenon searchlight.
D. Remove ladder to wheelhouse and install a staircase.
E. Install additional rubber to head log and bow corners.
F. Flush cooling system.
G. Cut tips off cooler pipes and replace thermostats. (To prevent engine from overheating)
H. Install cooler box circulation system.
MV Sangamon: The contractor shall provide all labor, materials, equipment, and tools to conduct the following work (quotes would include transport of vessels to work location as an option).
A. Remove latching winch controls and install non-latching controls to the head deck and the wheelhouse dashboard.
B. Remove phase converter and install VFD’s for winches.
C. Install 200W Xenon searchlight.
D. Remove ladder to wheelhouse and install a staircase.
E. Install ¾”x75’ synthetic face wires with 36” dipped eye on end.
F. Illuminate the rudder indicators.
G. Install cooler box circulation system.
Additional Requirements: The contractor shall provide a Marine Chemist Certificate at the beginning of the project in case of any hot work. The contractor will be required to provide replacement coolant.
Once installation of the components is complete, the contractor and government personnel will run and check the vessel/engine temperature for proper operation before the project is considered complete.
Vessel Details: (Both vessels are identical)
Make/Model: Marine Inland Fabricators/Clydesdale Truck-able Workboat
Engines: 2 per vessel- John Deere 6068 AFM85 300HP
Length: 25’ ¾”
Width: 14’ -9 ¾”
Height (from waterline): 20’ ¾”
Hull Depth: 6’ -10 3/8”
Beam: 13’ -11 ¾”
Location of Vessels:
MV Sangamon: Peoria Lock and Dam, 1071 Wesley Rd., Creve Coeur, IL 61610
MV Beardstown: LaGrange Lock and Dam, 714 1965E St., Versailles, IL 62378
Completion Date:
The contractor shall complete the work to both vessels no later than 45 days after award of the contract.
Pick up Point of Contact: Matt Whitley, Engineering Technician Email:
matthew.d.whitley@usace.army.mil mailto:matthew.d.whitley@usace.army.mil