EDF_SOW_High_Speed_Turbo_Pump_ZDR.pdf
PDF 90 KB Posted
- Attached to
- Turbo Molecular Pumping Station Federal contract opportunity
- Solicitation number
- SB1341-16-RQ-0643
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Applicable_Provisions_and_Clauses.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements Document
TITLE: Procurement of Turbo Molecular Pumping Station
LAB REQUESTING SERVICE: Material Measurement Laboratory, Chemical Sciences
Division, Gas Sensing and Metrology Group
I. BACKGROUND INFORMATION
Chemical Sciences Division Gas Sensing and Metrology Group develops new methodologies and instrumentation for the measurement of gas phase molecular absorption features. These methodologies and instrumentation include novel spectrometers that offer ultra-high sensitivity to trace gases, high fidelity and reproducibility in measured concentrations, and precision gas metrology. The Group is currently constructing a spectrometer to study the temperature dependence of molecular lineshapes, and requires oil-free vacuum pumping stations for evacuation of the vacuum jacket of the temperature control apparatus.
II. SCOPE OF WORK
The Gas Sensing and Metrology Group requires a high pumping speed, oil-free pump to provide a low ultimate pressure for the vacuum jacketing of a temperature regulation chamber for an ongoing molecular spectroscopy experiment. Turbo molecular pumping stations are a suitable technology for this application.
III. SPECIFICATIONS
The Contractor shall provide a turbo molecular pumping station that meets the following minimum technical specifications:
Pumping Station requirements:
Oil-free, dry pumps
Minimum pumping speed: 250 L/s
Ultimate pressure < 10-8 mbar
Flange: DN 100
Complete system including backing and turbo pump, controllers and cables
• Unit footprint shall be no larger than 55 cm by 45 cm
• Unit height shall be no more than 63 cm including and casters
Warranty:
The Contractor shall provide, at a minimum, a one year warranty for the equipment. The warranty shall cover all parts, labor and travel. The warranty shall commence upon successful completion of delivery and installation of all required specifications.
IV. DELIVERABLES
Description Quantity Due Date
Pumping station including backing and turbo pump
One (1) 6 weeks after award of this requirement.
Operations manual Two One
(21)
6 weeks after award of this requirement.
V. GOVERMNET ACCEPTANCE
Acceptance will occure after the Government Technical Point of Contact has confirmed that all minimum requirements in this document have been met.