Solicitation attached. A site visit will be held on Wednesday May 27 2015 at 10 00am. If you are interested in attending this site visit please e-mail Josh Alderoty at Joshua.alderoty nist.gov with the subject Site Visit for Electrical IDIQ before May 26th at 5pm. This will be the only site visit held for this requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| Site_Visit_Sign_In.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
11. The contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
NSN 7540-01-155-3212
calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
See Attached
STANDARD FORM 1442 (REV. )
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( )
20b. SIGNATURE 20c. OFFER DATE
STANDARD FORM 1442 (REV. ) BACK
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 3 OF 75 SB1341-15-RP-0020
0001 Electrical Construction Multiple Award Task Order Contract (MATOC), firm-fixed-price Indefinite-Delivery Indefinite-Quantity (IDIQ) for repairs, renovations, and alterations to facilities and utilities located at the NIST Gaithersburg, Maryland campus.
Contractor to provide all labor, material, equipment, and supervision to complete Electrical Construction activities to include: electrical equipment installation (transformers, panel boards, UPS, motors), lighting, life safety, conduit, wiring, and electrical maintenance.
PR NUMBER: NB193000-15-02128
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination Period of Performance: 07/01/2015 to 06/30/2016
1.00 JB
OPT
0002 Option Year 1: Electrical Construction Multiple Award
Task Order Contract (MATOC), firm-fixed-price Indefinite-Delivery Indefinite-Quantity (IDIQ) for repairs, renovations, and alterations to facilities and utilities located at the NIST Gaithersburg, Maryland campus.
Contractor to provide all labor, material, equipment, and supervision to complete Electrical Construction activities to include: electrical equipment installation (transformers, panel boards, UPS, motors), lighting, life safety, conduit, wiring, and electrical maintenance.
PR NUMBER: NB193000-15-02128
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination Period of Performance: 07/01/2016 to 06/30/2017
1.00 JB
OPT
0003 Option Year 2: Electrical Construction Multiple Award
Task Order Contract (MATOC), firm-fixed-price Indefinite-Delivery Indefinite-Quantity (IDIQ) for repairs, renovations, and alterations to facilities and utilities located at the NIST Gaithersburg, Maryland campus.
Contractor to provide all labor, material, equipment, and supervision to complete Electrical Construction activities to include: electrical equipment installation (transformers, panel boards, UPS, motors), lighting, life safety, conduit, wiring, and electrical maintenance.
PR NUMBER: NB193000-15-02128
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
1.00 JB
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 4 OF 75 SB1341-15-RP-0020
FOB : Destination Period of Performance: 07/01/2017 to 06/30/2018
OPT
0004 Option Year 3: Electrical Construction Multiple Award
Task Order Contract (MATOC), firm-fixed-price Indefinite-Delivery Indefinite-Quantity (IDIQ) for repairs, renovations, and alterations to facilities and utilities located at the NIST Gaithersburg, Maryland campus.
Contractor to provide all labor, material, equipment, and supervision to complete Electrical Construction activities to include: electrical equipment installation (transformers, panel boards, UPS, motors), lighting, life safety, conduit, wiring, and electrical maintenance.
PR NUMBER: NB193000-15-02128
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination Period of Performance: 07/01/2018 to 06/30/2019
1.00 JB
OPT
0005 Option Year 4: Electrical Construction Multiple Award
Task Order Contract (MATOC), firm-fixed-price Indefinite-Delivery Indefinite-Quantity (IDIQ) for repairs, renovations, and alterations to facilities and utilities located at the NIST Gaithersburg, Maryland campus.
Contractor to provide all labor, material, equipment, and supervision to complete Electrical Construction activities to include: electrical equipment installation (transformers, panel boards, UPS, motors), lighting, life safety, conduit, wiring, and electrical maintenance.
PR NUMBER: NB193000-15-02128
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination Period of Performance: 07/01/2019 to 06/30/2020
1.00 JB
Table of Contents
PAGE 5 OF 75 SB1341-15-RP-0020
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS
B. 1 1352.216-75 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (APR 2010)
SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C. 1 Statement of Work
C. 2 Statement of Work - Task Order 1
SECTION G CONTRACT ADMINISTRATION DATA
G. 1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
G. 2 1352.201-72 CONTRACTING OFFICER?s REPRESENTATIVE (C0R) (APR 2010)
G. 3 1352.216-76 PLACEMENT OF ORDERS (APR 2010)
G. 4 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
G. 5 52.232-99 DEV PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS CONTRACTORS (AUG 2012)
G. 6 NIST LOCAL-40 BILLING INSTRUCTIONS FOR DELIVERY/TASK ORDERS
SECTION H SPECIAL CONTRACT REQUIREMENTS
H. 1 1352.216-74 TASK ORDERS (APR 2010)
SECTION I CONTRACT CLAUSES
I. 1 52.202-1 DEFINITIONS (NOV 2013)
I. 2 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I. 3 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
I. 4 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
I. 5 52.210-1 MARKET RESEARCH (APR 2011)
I. 6 52.214-22 EVALUATION OF BIDS FOR MULTIPLE AWARDS (MAR 1990)
I. 7 52.216-27 SINGLE OR MULTIPLE AWARDS (OCT 1995)
I. 8 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)
I. 9 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I. 10 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011). 16
I. 11 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
I. 12 52.216-18 ORDERING (OCT 1995)
I. 13 52.216-19 ORDER LIMITATIONS (OCT 1995)
I. 14 52.216-22 INDEFINITE QUANTITY (OCT 1995)
I. 15 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
I. 16 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
I. 17 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
I. 18 52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)
I. 19 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION
CONTRACTS (MAY 2008)
I. 20 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
I. 21 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR
TRANSACTIONS RELATING TO IRAN--REPRESENTATION AND CERTIFICATIONS (DEC 2012)
I. 22 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)
I. 23 52.233-2 SERVICE OF PROTEST (SEP 2006)
I. 24 52.233-3 PROTEST AFTER AWARD (AUG 1996)
I. 25 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
I. 26 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
I. 27 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
I. 28 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
I. 29 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
I. 30 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
Table of Contents
PAGE 6 OF 75 SB1341-15-RP-0020
I. 31 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
I. 32 52.236-8 OTHER CONTRACTS (APR 1984)
I. 33 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (APR 1984)
I. 34 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
I. 35 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
I. 36 52.236-12 CLEANING UP (APR 1984)
I. 37 52.236-13 ACCIDENT PREVENTION (NOV 1991)
I. 38 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
I. 39 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
I. 40 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)
I. 41 52.243-1 CHANGES--FIXED-PRICE (AUG 1987)
I. 42 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (APR 2015)
I. 43 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I. 44 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
I. 45 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
SECTION J LIST OF ATTACHMENTS
J. 1 General Purpose Laboratory Buildings User Guide
J. 2 Guidelines for Contractors
J. 3 Safety Procedures
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L. 1 Instructions to Offerors
SECTION M EVALUATION FACTORS FOR AWARD
M. 1 Evaluation Criteria
PAGE 7 OF 75 SB1341-15-RP-0020
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B. 1 1352.216-75 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (APR 2010)
During the term of the contract, the Government shall place orders totaling a minimum of $10,000.00 . The amount of all orders shall not exceed $9,800,000.00 for all awardees. .
(End of clause)
PAGE 8 OF 75 SB1341-15-RP-0020
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C. 1 Statement of Work
Statement of Work, Electrical Construction Requirements Contract, NIST Classification Code:
Z- Maintenance, repair, and alteration of real property NAICS Code:
Subsector 238, Specialty Contractors/238210-Electrical Contractors and other Wiring Installation Contractors.
Synopsis:
The National Institute of Standards and Technology (NIST) intends to award a Multiple Award Task Order Contract (MATOC). The contracts will be awarded as firm-fixed-price Indefinite- Delivery Indefinite-Quantity (IDIQ) contract with a base period of one year and four one-year option periods. The MATOC is for repairs, renovations, and alterations to facilities and utilities located at the NIST Gaithersburg, Maryland campus. This procurement will result in the award of up to three (3) Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) contract, awarded to multiple contractors. The task orders will be competed amongst the multiple awardees.
The contract award will be based on Best Value to the Government, which may or may not result in accepting the lowest offered price. To determine best value, the Governments proposal evaluation will consist of, but not be limited to, evaluation of the offeror’s technical and management capabilities as well as price/cost on the first task order included in this solicitation.
Specifically, the major factors in the Technical Proposal shall consist of Safety Program and record, Management Ability, Past Performance, Quality Control Program, Subcontracting Support Capability and Clarity of Proposal. Specifically, the evaluation of price/cost will be based primarily upon each Offeror’s Completeness, Reasonableness, and Realism.
The contractor shall implement contract management systems involved in supporting, monitoring and controlling the project operations. The contractor shall implement necessary work control procedures to ensure quality and timely work completion and tracking of the work progress. The contractor shall plan and schedule work to assure material, labor and equipment are available to complete the work within the specified time limits and in conformance with the quality and safety and health standards required. The contractor shall provide adequate on site supervision of all subcontractor employees at all time for all active work sites. The contractor shall perform all required work in conformance with industry standards and higher NIST safety standards.
Individual task orders will vary in size and complexity. The task orders will include, but are not limited to, interior and exterior electrical, mechanical, plumbing, sheet metal, painting, demolition, concrete masonry, and welding. All work shall be in conformance with the requirements of the contract including furnishing all materials, labor, tools, equipment, transportation, supervision, management and other services (including engineering/technical support), items and incidentals necessary thereto.
The base contract period is for 12 months. The contract will contain four additional twelve month option periods. The minimum contract amount is $10,000.00.The maximum contract amount, including all option periods, is $9,800,000. The task order minimum is $2,000.00. The task order maximum is $300,000.00. The proposed contract work will be at the NIST campus, in Gaithersburg, Maryland. Proposals under the IDIQ contract will be required within 15 work days for tasks under $10,000 and within 10 work days for urgent mission critical tasks and within 20 work days for tasks over $10,000. Prior to receiving a notice to proceed, the Contractor shall
PAGE 9 OF 75 SB1341-15-RP-0020
submit an Activity Hazard Analysis (AHA) to the Government for approval. Refer to the attached Safety procedures for guidance in preparing the AHA.
This acquisition will be solicited as a 100% small business set aside. All small business organizations (SB SDB, WOSB, HUBZone, and VOSB and SDVOSB) are encouraged to respond to this notice.
Statement of Work, Electrical, IDIQ Contract, NIST Work may include, but not limited to:
Install, or modify, electrical branch circuits from 120 volt single phase up to 208 volt three phase, utilizing EMT, rigid conduit, and wiremold raceway systems.
Install 277/480 Volt service.
Install transformers, panel boards, motors, and various other electrical equipment and devices.
Trouble shoot, identify, and repair electrical faults and problems.
Install lighting (120 V to 277 V), including re-lamping and ballast replacement.
Work from building plans, blueprints, wiring diagrams, engineering drawings, and electrical O&M manuals to plan and lay out the routing, placement type, size, gauge, balance, load, continuity, and safe operation of electrical lines, circuits, systems, equipment, and controls.
Install life safety systems, including fire alarm (Simplex), exhaust fan/fume hood interlock, gas monitoring, and laser safety interlock systems.
Install exterior power distribution systems, with concrete duct banks.
Electrical maintenance/repair of street lights, transformers, switchgear, panel boards, and distribution systems.
Electrical Work – Electrical power and distribution, Uninterruptible Power Systems, Generators, lighting, alarms, gas monitoring systems, Direct Digital Controls, Simplex Fire Alarm, and communication systems.
Note: All work must be performed in accordance with industry, NIST, and OSHA standards, The National Electric Code (NFPA 70, current edition), and NFPA 70E, Standard for Electrical Safety in the Workplace, current edition. All Lock out/tag out procedures must be followed at all times.
All workers must have the appropriate personal protective equipment (PPE).
General Notes:
Tasks will be performed in and around occupied areas performing scientific/research experiments where vibration, noise, outages of utilities, and disturbances to the physical environment may hinder the ability of the Government to perform required activities. All activities must be planned, scheduled and posted for a minimum of two weeks, unless prior authorization is given by the Contracting Officer, prior to the activity beginning. Certain activities may have to be performed outside of normal business hours. In this event, overtime rates would be applicable.
Attachments for Information and Reference:
Task order Scope of Work (include proposal cost with breakdown on labor and materials) General Purpose Laboratory Buildings (GPL), 220, 221, 223, 224, 225, 226 Standards, with AML and ACSL user guides.
Guide for Architect/Engineering Firms Performing Professional Services for NIST (the A/E Guide).
Safety procedures
C. 2 Statement of Work - Task Order 1
PAGE 10 OF 75 SB1341-15-RP-0020
Bldg. 224 Bus Duct Relocation Statement of Work
Project:ऀBus Duct Relocation Attic
LOCATION:ऀBLDG. 224
COR: ऀJohn Filano
There are numerous bus duct switches in the attic of bldg. 224 that are inaccessible for service and maintenance. Some switches have light fixtures that are located in front of them and the light fixture can be moved. Most bus duct switches will need to be relocated to a more accessible location.
Objectives:
The objective is to obtain an Electrical Contractor to relocate/replace bus duct switches and reconnect power feeds.
Construction Contractor Requirements:
Provide construction services to perform necessary electrical work. All work must conform to the requirements of the National Electric Code (NEC).
Construction statement of work:
The contractor shall provide all the necessary services, including labor, materials, equipment, supplies and supervision as necessary, but not limited to the following, to fulfill the requirements of this project. See drawing 224-398 for all bus duct locations.
Job Specific Safety Plan: The contractor shall submit a job specific safety plan prior to startup of work. All work will be performed with the bus ducts de-energized.
Light Fixture Relocation: At columns J17 and J34 there are light fixtures located in front of bus duct switches that need to be moved. The contractor will relocate the light fixtures and reuse any hardware. The contractor will be responsible for providing any additional hardware and wiring to relocate light fixtures.
Bus Duct Switch Relocation/Replacement: The contractor shall relocate bus duct switches per drawing 224-398. All 200 amp switches will be re-used. Any switches smaller than 200 amps will be replaced with new switches per the below specifications:
PAGE 11 OF 75 SB1341-15-RP-0020
Manufacturer: Siemens Energy & Automation, Inc.
Model: XLVB or equivalent Voltage: 120/208V; 3 phase w/neutral Temperature Rise: 55 deg C above 40 deg C ambient maximum for continuous rated current.
Bus Materials: Current-carrying copper conductors, fully insulated with Class 130C insulation except at stabs and joints; plated surface at stabs and joints.
Enclosure: Steel, with manufacturer's standard finish Fittings and Accessories: Manufacturer's standard.
Any switches that are marked for removal or replacement shall be turned over to the Government at the conclusion of the project.
Conduit and fittings: Where 3” rigid conduit is being cut or uncoupled, the contractor will install a 24”x24” junction box. The contractor shall build a support frame for the junction box using unistrut that is secured to the floor. To connect cut 3” rigid conduit to the new junction box, the contractor will use threadless fittings. All new conduit shall be run with EMT and will use compression fittings.
Wiring: Most bus duct switch moves will require additional wiring. The contractor shall make a splice connection at the junction box and install new thhn copper wire that is the same size as the existing wire.
Jobsite Restrictions: The bus ducts in the attic of bldg. 224 are broken into four (4) zones (northeast, northwest, southeast, and southwest). Each zone will have to be isolated before work can begin. Since this work will shut off power to all the labs in each zone, this work will have to be completed on the weekends. There will be one outage per weekend for each zone. NIST requires a 2 week notice before scheduling any outage. Once an award has been made, the contractor will provide NIST with a proposed schedule to ensure that proper outage notifications can be given to the building occupants.
Period of Performance/Schedule:
The following is the schedule for the 56 calendar days (8 weeks) to complete the project from Notice to Proceed:
1. Initial Meetingऀ0.0 week
2. Safety Planऀ1.0 week
3. Verify/Purchase Materialऀ3.0 weeks
4. Northeast Outageऀ1.0 week
5. Northwest Outageऀ1.0 week
6. Southeast Outageऀ1.0 week
7. Southeast Outageऀ1.0 week
PAGE 12 OF 75 SB1341-15-RP-0020
ऀऀTotalऀऀ8.0 weeks
Deliverables:
Contractor will provide submittals for bus duct switches, wiring, conduit, and fittings. Deliver all submittals to John Filano, NIST, 100 Bureau Drive, Stop 1930, Building 302, Room A121, Gaithersburg, MD 20899-3511.
Safety plan submitted to NIST Plant Safety Office
Government Furnished Information:
The Government will provide the drawings/documentation for the project, as necessary. The contractor shall be responsible to verify those drawings against field conditions before starting the project. The contractor shall notify the COR of any discrepancies found in field during walk down of the project.
Points of contact:
Plant Division COR for this contract:
•ऀJohn FilanoऀऀऀMechanical Engineerऀऀ301-975-6995 •ऀJohn.filano@nist.gov
Chief, Operations Engineering Group:
•ऀTodd SnoufferऀऀऀMechanical Engineerऀऀ301-975-6524 •ऀtodd.snouffer @nist.gov
End of Statement of Work
PAGE 13 OF 75 SB1341-15-RP-0020
SECTION G
CONTRACT ADMINISTRATION DATA
G. 1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.
G. 2 1352.201-72 CONTRACTING OFFICER?s REPRESENTATIVE (C0R) (APR 2010)
(a) TBD is hereby designated as the Contracting Officer?s Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:
Phone Number: TBD Email: TBD
(b) The responsibilities and limitations of the COR are as follows:
(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.
(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer.
The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.
Each task order is anticipated to be made using the Lowest Price Technically Acceptable process.
G. 3 1352.216-76 PLACEMENT OF ORDERS (APR 2010)
(a) The contractor shall provide goods and/or services under this contract only as directed in orders issued by authorized individuals. In accordance with FAR 16.505, each order will include:
(1) Date of order;
(2) Contract number and order number;
(3) Item number and description, quantity, and unit price or estimated cost or fee;
(4) Delivery or performance date;
(5) Place of delivery or performance (including consignee);
(6) Packaging, packing, and shipping instructions, if any;
(7) Accounting and appropriation data;
(8) Method of payment and payment office, if not specified in the contract;
(9) Any other pertinent information.
(b) In accordance with FAR 52.216-18, Ordering, the following individuals (or activities) are authorized to place orders against this contract:
(c) If multiple awards have been made, the contact information for the DOC task and delivery order ombudsman is Joshua Alderoty
PAGE 14 OF 75 SB1341-15-RP-0020
Anticipated
G. 4 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
(a) The base period of performance of this contract is from 07/01/2015 through 06/30/2016 . If an option is exercised, the period of performance shall be extended through the end of that option period.
(b) The option periods that may be exercised are as follows:
Period Start Date End Date Option I 07/01/2016 06/30/2017 Option II 07/01/2017 06/30/2018 Option III 07/01/2018 06/30/2019 Option IV 07/01/2019 06/30/2020
(c)The notice requirements for unilateral exercise of option periods are set out in FAR 52.217-9.
G. 5 52.232-99 DEV PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS CONTRACTORS (AUG 2012)
This clause implements the temporary policy provided by OMB Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors, dated July 11, 2012.
(a) Upon receipt of accelerated payments from the Government, the contractor is required to make accelerated payments to small business subcontractors to the maximum extent practicable after receipt of a proper invoice and all proper documentation from the small business subcontractor.
(b) Include the substance of this clause, including paragraph (b), in all subcontracts will small business concerns.
(c) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
G. 6 NIST LOCAL-40 BILLING INSTRUCTIONS FOR DELIVERY/TASK ORDERS
(a) NIST prefers electronic Invoice/Voucher submissions and they should be emailed to INVOICE@NIST.GOV.
(b) Each Delivery/Task Order Invoice or Voucher submitted shall include the following: (1) Contract Number; identified in Block 2 of the OF347. (2) Delivery/Task Order number identified in Block 3 of the OF347. (3) Contractor Name and Address. (4) Date of Invoice. (5) Invoice Number. (6) Amount of Invoice and Cumulative Amount Invoiced to-date. (7) Contract Line Item Number (CLIN). (8) Description, Quantity, Unit of Measure, Unit Price, and Extended Price of Supplies/Services Delivered. (9) Prompt Payment Discount Terms, if Offered. (10) Any other information or documentation required by the contract.
(c) In the event electronic submissions are not used, the Contractor shall submit an original invoice or voucher in accordance with paragraph (b) above to the address identified in Block 21 of the OF347.
(END OF CLAUSE)
PAGE 15 OF 75 SB1341-15-RP-0020
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H. 1 1352.216-74 TASK ORDERS (APR 2010)
(a) In task order contracts, all work shall be initiated only by issuance of fully executed task orders issued by the Contracting Officer. The work to be performed under these orders must be within the scope of the contract. The Government is only liable for labor hours and costs expended under the terms and conditions of this contract to the extent that a fully executed task order has been issued and covers the required work and costs. Charges for any work not authorized shall be disallowed.
(b) For each task order under the contract, the Contracting Office shall send a request for proposal to the contractor(s). The request will contain a detailed description of the tasks to be achieved, a schedule for completion of the task order, and deliverables to be provided by the contractor.
(c) The contractor shall submit a proposal defining the technical approach to be taken to complete the task order, work schedule and proposed cost/price.
(d) After any necessary negotiations, the contractor shall submit a final proposal.
(e) Task orders will be considered fully executed upon signature of the Contracting Officer. The contractor shall begin work on the task order in accordance with the effective date of the order.
(f) The contractor shall notify the Contracting Officer of any instructions or guidance given that may impact the cost, schedule or deliverables of the task order. A formal modification to the task order must be issued by the Contracting Officer before any changes can be made.
(g) Task orders may be placed during the period of performance of the contract. Labor rates applicable to hours expended in performance of an order will be the contract rates that are in effect at the time the task order is issued.
(h) If multiple awards are made by the Government, the CO shall provide each awardee a fair opportunity to be considered for each task order over the micro-purchase threshold unless one of the exceptions at FAR 16.505(b) applies.
PAGE 16 OF 75 SB1341-15-RP-0020
SECTION I
CONTRACT CLAUSES
I. 1 52.202-1 DEFINITIONS (NOV 2013)
(Reference 52.202-1)
I. 2 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(Reference 52.203-5)
I. 3 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
(Reference 52.203-6)
I. 4 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
(Reference 52.203-7)
I. 5 52.210-1 MARKET RESEARCH (APR 2011)
(Reference 52.210-1)
I. 6 52.214-22 EVALUATION OF BIDS FOR MULTIPLE AWARDS (MAR 1990)
(Reference 52.214-22)
I. 7 52.216-27 SINGLE OR MULTIPLE AWARDS (OCT 1995)
(Reference 52.216-27)
I. 8 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)
(Reference 52.219-6)
I. 9 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
(Reference 52.223-6)
I. 10 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011)
(Reference 52.223-18)
I. 11 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
(Reference 52.236-26)
I. 12 52.216-18 ORDERING (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 07/01/2015 through 06/30/2016
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
PAGE 17 OF 75 SB1341-15-RP-0020
(End of Clause)
I. 13 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) "Minimum order." When the Government requires supplies or services covered by this contract in an amount of less than $2,000.00 the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) "Maximum order." The Contractor is not obligated to honor--
(1) Any order for a single item in excess of $300,000.00
(2) Any order for a combination of items in excess of $300,000.00 or
(3) A series of orders from the same ordering office within 10 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 14 days after issuance, with written notice stating the Contractor`s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
I. 14 52.216-22 INDEFINITE QUANTITY (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor`s and Government`s rights and obligations with respect to that order to the same extent as if the order were completed during the contract`s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after six months after the end of ther period of performance of the base or option period
I. 15 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 60 calendar days before the end of the period of performance
PAGE 18 OF 75 SB1341-15-RP-0020
I. 16 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days of the end of the contract provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years
I. 17 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
(a) "Hazardous material," as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).
(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.
| Material | Identification No. | | (If none, insert "None") | |
(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.
(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause.
Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.
(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.
(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.
(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.
(h) The Government`s rights in data furnished under this contract with respect to hazardous material are as follows:
(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to--
(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;
(ii) Obtain medical treatment for those affected by the material; and
(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.
PAGE 19 OF 75 SB1341-15-RP-0020
(2) To use, duplicate, and disclose data furnished under this clause, in accordance with paragraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.
(3) The Government is not precluded from using similar or identical data acquired from other sources.
I. 18 52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)
As required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C. 6962(c)(3)(A)(i)), the offeror certifies, by signing this offer, that the percentage of recovered materials content for EPA-designated items to be delivered or used in the performance of the contract will be at least the amount required by the applicable contract specifications or other contractual requirements.
(End of Provision)
I. 19 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION
CONTRACTS (MAY 2008)
(a) In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired--
(1) Competitively within a timeframe providing for compliance with the contract performance schedule;
(2) Meeting contract performance requirements; or
(3) At a reasonable price.
(b) Information about this requirement is available at EPA`s Comprehensive Procurement Guidelines web site, http://www.epa.gov/cpg/. The list of EPA-designated items is available at http:// www.epa.gov/cpg/products.htm.
I. 20 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
(a) Except as authorized by the Office of Foreign Assets Control (OFAC) in the Department of the Treasury, the Contractor shall not acquire, for use in the performance of this contract, any supplies or services if any proclamation, Executive order, or statute administered by OFAC, or if OFAC`s implementing regulations at 31 CFR chapter V, would prohibit such a transaction by a person subject to the jurisdiction of the United States. (b) Except as authorized by OFAC, most transactions involving Cuba, Iran, and Sudan are prohibited, as are most imports from Burma or North Korea, into the United States or its outlying areas. Lists of entities and individuals subject to economic sanctions are included in OFAC?s List of Specially Designated Nationals and Blocked Persons at http://www.treas.gov/offices/enforcement/ofac/sdn. More information about these restrictions, as well as updates, is available in the OFAC?s regulations at 31 CFR Chapter V and/or on OFAC?s website at http://www.treas.gov/offices/enforcement/ofac.
(c) The Contractor shall insert this clause, including this paragraph (c), in all subcontracts.
I. 21 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR
TRANSACTIONS RELATING TO IRAN--REPRESENTATION AND CERTIFICATIONS (DEC 2012)
(a) Definitions.
"Person"--
(1) Means--
(i) A natural person;
PAGE 20 OF 75 SB1341-15-RP-0020
(ii) A corporation, business association, partnership, society, trust, financial institution, insurer, underwriter, guarantor, and any other business organization, any other nongovernmental entity, organization, or group, and any governmental entity operating as a business enterprise; and
(iii) Any successor to any entity described in paragraph (1)(ii) of this definition; and
(2) Does not include a government or governmental entity that is not operating as a business enterprise.
"Sensitive technology"--
(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically--
(i) To restrict the free flow of unbiased information in Iran; or
(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and
(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).
(b) The offeror shall e-mail questions concerning sensitive technology to the Department of State at CISADA106@state.gov.
(c) Except as provided in paragraph (d) of this provision or if a waiver has been granted in accordance with 25.703-4, by submission of its offer, the offeror--
(1) Represents, to the best of its knowledge and belief, that the offeror does not export any sensitive technology to the government of Iran or any entities or individuals owned or controlled by, or acting on behalf or at the direction of, the government of Iran;
(2) Certifies that the offeror, or any person owned or controlled by the offeror, does not engage in any activities for which sanctions may be imposed under section 5 of the Iran Sanctions Act.
These sanctioned activities are in the areas of development of the petroleum resources of Iran, production of refined petroleum products in Iran, sale and provision of refined petroleum products to Iran, and contributing to Iran`s ability to acquire or develop certain weapons or technologies;
and
(3) Certifies that the offeror, and any person owned or controlled by the offeror, does not knowingly engage in any transaction that exceeds $3,000 with Iran`s Revolutionary Guard Corps or any of its officials, agents, or affiliates, the property and interests in property of which are blocked pursuant to the International Emergency Economic Powers Act (50 U.S.C. 1701 et seq.) (see OFAC`s Specially Designated Nationals and Blocked Persons List at http://www.treasury.gov/ofac/downloads/ t11sdn.pdf).
(d) Exception for trade agreements. The representation requirement of paragraph (c)(1) and the certification requirements of paragraphs (c)(2) and (c)(3) of this provision do not apply if--
(1) This solicitation includes a trade agreements notice or certification (e.g., 52.225-4, 52.225-6, 52.225-12, 52.225-24, or comparable agency provision); and
(2) The offeror has certified that all the offered products to be supplied are designated country end products or designated country construction material.
(End of provision)
I. 22 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)
(a) "Definitions." As used in this clause-- "Original contract price" means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) "Amount of required bonds." Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) "Performance bonds (Standard Form 25)." The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) "Payment Bonds (Standard Form 25-A)." The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) "Additional bond protection."
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) "Furnishing executed bonds." The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
PAGE 21 OF 75 SB1341-15-RP-0020
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier`s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:
U.S. Department of Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782.
Or via the internet at http://www.fms.treas.gov/c570/.
(e) "Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)." Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
I. 23 52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the General Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the contracting officer
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
I. 24 52.233-3 PROTEST AFTER AWARD (AUG 1996)
(a) Upon receipt of a notice of protest (as defined in FAR 33.101) or a determination that a protest is likely (see FAR 33.102(d)), the Contracting Officer may, by written order to the Contractor, direct the Contractor to stop…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .