About this file
This document is a Recommendation and Determination to Solicit from One Source or Brand Name issued by the NASA Shared Services Center dated March 15, 2017.
NASA recommends sole-source procurement from MTS Systems Corporation for an MTS FlexTest 40 Controller with an estimated cost and lead time of 95 days after receipt of order. The controller is required for equipment located in the Materials Research Lab (Building 1205) within the Research Directorate's Durability Damage Tolerance and Reliability Branch. The justification for sole-source procurement is based on compatibility and interchangeability requirements with existing MTS hardware and software currently supporting the NASA Engineering and Safety Center and multiple branches. The MTS controller is being procured as a replacement for failed equipment. According to the document, MTS is the only viable source due to the complexity of the equipment, the need for manufacturer-specific parts, specialized knowledge requirements, warranty obligations, and the necessity for re-installation, calibration, and repair services distributed across multiple buildings and organizations. The document asserts that procurement from an alternative vendor would negatively impact project schedules, potentially cause loss of equipment operation, delay critical flight-required activities, and would be operationally and financially prohibitive to evaluate or pursue.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0042252 Tab 07 Capability Statement.pdf | ||
| SATPC0042252 Tab 04 4 SOW..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 V2.0 3-15-2017
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
NASA SHARED SERVICES CENTER
RECOMMENDATION AND DETERMINATION TO SOLICIT FROM ONE SOURCE
OR BRAND NAME
PICK ONE
Sole Source:
☒I recommend that NASA, NASA Shared Services Center negotiate with MTS Systems Corporation only for MTS FlexTest 40 Controller. The total estimated cost of this effort is and the estimated period of performance or lead-time for delivery is 95 days ARO.
OR
Brand Name Justification:
☐I recommend that NASA, NASA Shared Services Center negotiate only with vendors who can provide the subject brand name from Manufacture Name for Product being purchased. The total estimated cost of this effort is $Dollar Amount and the estimated period of performance or lead-time for delivery is 30 days
ARO.
This recommendation is for the acquisition of supplies or services determined to be reasonably available from only one source/only one manufacture. Competition is impractical for the following reasons (please answer the questions below):
1. What are the reasons for soliciting only the suggested source/suggested brand name? Please provide the unique characteristics of the items or services along with the supporting rationale and the market research performed to substantiate your reason for the suggested source/brand name.
The MTS Controller requested in this procurement is needed for equipment located in the Materials Research Lab (buildings 1205) within the Research Directorate for the Durability Damage Tolerance and Reliability Branch (DDTRB). MTS equipment systems are an important part of laboratory testing. As these systems get older and fail, it is important to upgrade the systems to increase maintain functionality.
We are replacing a failed controller with these new systems. Compatibility and interchangeability are needed for use with existing mts hardware and software that are currently in use supporting the NESC, and multiple branches. The specified Systems and vender will ensure compatibility is critical to ongoing work in the lab. Re-installation, calibration, and repair are needed on this equipment distributed across both buildings and organizations to maintain functioning of the laboratories. Due to the complexity, need for manufacture specific parts, knowledge of equipment, need of warranty, MTS is the only source for these services.
2. What is the impact to the government if another vendor/brand is used? Include any dollar, schedule, or compatibility impacts if possible.
Procurement of a non MTS vender will affect schedule of planned work, cause possible loss of operation of the equipment and require a postponement of project and critical flight required activities. To pursue the evaluation or procurement of an alternate solution would be both operationally cost and time prohibitive.