SATPC0041725 TAB 07 SOW PRINTED.pdf

PDF 60 KB Posted

Attached to
Maintenance Agreement Extension for Spirent GPS/GNSS Simulators Federal contract opportunity
Solicitation number
80NSSC26937837Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This is a Statement of Work (SOW) for extending maintenance and support coverage of Spirent GPS/GNSS simulator systems at NASA Goddard Space Flight Center (GSFC), Code 524.

The procurement covers maintenance and support services for eleven Spirent GSS9000 GPS/GNSS simulator systems currently operating in the Space Navigation Laboratory (SNL). These simulators provide hardware-in-the-loop (HWIL) capabilities essential for developing, testing, verifying, and validating advanced navigation technologies for NASA missions. The contractor shall provide repair of malfunctioning hardware, software updates and patches, technical support and troubleshooting assistance, and general maintenance services necessary to maintain system operability and support NASA testing and development activities. Coverage periods vary by system: one simulator (serial number 90002403) requires maintenance from July 1, 2026 through June 30, 2027, while the remaining ten simulators require coverage from June 1, 2027 through May 31, 2028. The systems include various configurations of 12-channel and 16-channel GPS simulators with support for multiple satellite systems (GPS L1/L2/L5, Galileo E1/E5, BeiDou B1/B2, and GLONASS L1/L2). All maintenance and support services must be provided in accordance with the applicable maintenance agreement for each covered simulator system.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Maintenance Agreement Extension for Spirent GPS/GNSS Simulators

Objective / Requirements / Background

Code 524 at NASA Goddard Space Flight Center (GSFC) operates eleven (11) Spirent GSS9000 GPS/GNSS simulator systems in the Space Navigation Laboratory (SNL). These simulators provide critical hardware-in-the-loop (HWIL) GPS/GNSS simulation capabilities supporting the development, testing, verification, and validation of advanced navigation technologies for NASA missions.

The objective of this procurement is to extend maintenance and support coverage for the simulator systems identified below during the specified periods of performance.

Characteristics, Scope, Specifications, and Period of Performance

Provide maintenance and support coverage for the following Spirent GSS9000 GPS/GNSS simulator systems. Support shall include maintenance services, repair of malfunctioning hardware, software updates, technical support, and other services necessary to maintain system operability.

Item Simulator Description Serial

Number Period of

Performance

GSS9000 2 RF 16-channel GPS L1/L2/L5 Simulator System

90002403 July 1, 2026 June 30, 2027

GSS9000 1 RF 16-channel GPS L1/L2/L5, Galileo E1/E5, BeiDou B1/B2 Simulator System

90000349 June 1, 2027 May 31, 2028

GSS9000 1 RF 16-channel GPS L1/L2, GLONASS L1/L2 Simulator System

90000387 June 1, 2027 May 31, 2028

GSS9000 1 RF 16-channel GPS L1/L2, BeiDou B1/B2 Simulator System

90000389 June 1, 2027 May 31, 2028

GSS9000 1 RF 16-channel GPS L1/L2, Galileo E1/E5 Simulator System

90000388 June 1, 2027 May 31, 2028

GSS9000 1 RF 12-channel GPS L1/L2/L5 Simulator System (including SimSAAS)

90000625 June 1, 2027 May 31, 2028

Item Simulator Description Serial

Number Period of

Performance

GSS9000 1 RF 16-channel GPS L1/L2/L5, Galileo E1/E5 Simulator System

90002272 June 1, 2027 May 31, 2028

GSS9000 1 RF 16-channel GPS L1/L2/L5 Simulator System

90002273 June 1, 2027 May 31, 2028

GSS9000 1 RF 16-channel GPS L1/L2/L5 Simulator System

90002276 June 1, 2027 May 31, 2028

GSS9000 1 RF 16-channel GPS L1/L2/L5 Simulator System

90002277 June 1, 2027 May 31, 2028

GSS9000 1 RF 16-channel GPS L1/L2/L5 Simulator System

90002278 June 1, 2027 May 31, 2028

Deliverables or Delivery Schedule

The contractor shall provide maintenance and support coverage for all simulator systems listed above during their respective periods of performance. Services shall include:

Repair of malfunctioning hardware as required.

Software updates and patches as available and applicable.

Technical support and troubleshooting assistance as required.

Maintenance services necessary to maintain system operability and support NASA testing and development activities.

The contractor shall provide all maintenance and support services in accordance with the applicable maintenance agreement for each covered simulator system.

File details come from the government source that posted it. Updated .