SATPC0040648 TAB 04 4 SOW.pdf

PDF 96 KB Posted

Attached to
Cryocooler and Heat Exchanger for LH2 Simulation Loop Federal contract opportunity
Solicitation number
80NSSC26928258Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This is a Statement of Work for the procurement of a cryocooler system to be delivered to NASA's Marshall Space Flight Center (MSFC). The contractor shall design, construct, ensure proper operation, and deliver a complete cryocooler system within 9 months of contract award. The system must include a compressor, cold head with integrated helium gas heat exchanger, control panel, flex lines connecting the compressor to the cold head, and all relevant documentation.

The cryocooler system must meet specific performance and technical requirements: achieve 100 watts or greater heat removal capacity at 20K temperature with a base temperature equal to or less than 17K; the cold head must feature ½" VCR fittings for helium loop connection and withstand a maximum allowable pressure of at least 300 psig; the system shall be mountable to a 16" OD ASA flange with 12" nozzle; operate on 480VAC, 3-phase, 60 Hz power; require water cooling at 5 gallons per minute or less at 80°F; and include flex lines between the compressor and cold head with a minimum length of 10 feet. Work shall be performed at the vendor's facility with delivery to MSFC.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements Procure a cryocooler system designed for 100 watt heat removal at 20K temperature, including compressor, cold head, helium gas heat exchanger integrated with cold head, control panel, flex lines from compressor to cold head, and relevant documentation.

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties:

Design and construct the cryocooler system Ensure proper operation Deliver system to MSFC

The cryocooler shall have the following specifications:

100 watt or greater specified heat removal at 20K temperature Base temperature equal to or less than 17K Cold head shall have an integrated heat exchanger designed to cool helium gas and a maximum allowable pressure of at least 300 psig (this is not the same specification as the compressor helium operating pressure)

System power shall be 480VAC, 3 phase, 60 Hz Water cooling requirement shall be equal to or less than 5 gallons per minute at

80 F Flex lines from compressor to cold head shall have a length of at least 10 feet

3. Place of Performance Vendor facility, delivered to MSFC

4. Period of Performance MSFC shall take delivery within 9 months after award