SATPC0038788 Tab 04 4 SOW..pdf
PDF 120 KB Posted
- Attached to
- Quantel Laser SHG/THG Unit Purchase Federal contract opportunity
- Solicitation number
- 80NSSC25907246Q
About this file
This Statement of Work (SOW) details a procurement for optical components for NASA Langley, specifically for a Quantel Laser SHG/THG Unit. The document outlines five specific line items with unique part numbers, including an optical bench, multiple optical crystals for second harmonic generation (SHG) and third harmonic generation (THG), with specific wavelength generation requirements ranging from 212nm to 568nm.
The procurement will be delivered to NASA Langley located at 4 S Marvin St in Hampton, VA, with an estimated delivery lead-time of 30 days after receipt of order (ARO). The acquisition appears to be a sole-source requirement, focused on precise optical components designed to meet specific scientific or research instrumentation needs, with each component serving a specialized function in wavelength generation and optical signal manipulation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0038788 Tab 06 RDSS..pdf | ||
| SATPC0038788 Tab 07 Capability Statement SAM.gov.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
The information listed below is required to complete this purchase.
2. Characteristics, Scope, and Specs
LINE PART NO. DESCRIPTION QTY.
1 PMEX0067 OP/QSC/UV2-DT
Optical Bench & associated parts to fit SHG and THG
2 PMEX0042 OP/QSC/BBO3
Crystal to achieve 284 nm as a SHG with 568nm
3 PMEX0043 BBO 4 Crystal Crystal use as a SHG to generate 212nm after THG
4 PMEX0041 OP/QSC/BBO2
Crystal use as a THG to generate 212nm by mixing 318nm & 636nm
5 PMEX0063 OP/QSC/DCP 1
3. Place of Performance
NASA LANGLEY
4 S MARVIN ST
236812109 HAMPTON, VA
4. Period of Performance
Estimated delivery lead-time is 30 days ARO.
File details come from the government source that posted it. Updated .