SATPC0038125 Tab 04 3 SOW Rev.pdf
PDF 441 KB Posted
- Attached to
- SW - IDEAS (BK Connect). Federal contract opportunity
- Solicitation number
- 80NSSC25900797Q
About this file
This Statement of Work (SOW) details the NASA Glenn Research Center's requirement for renewal of maintenance and support for current IDEAS licensing from Hottinger Bruel & Kjaer (HBK). The document outlines the need for software licenses, patches, support, and upgrades for multiple BK Connect software modules, including Data Viewer, Hardware Setup, Correlation Analysis, Modal Analysis, External File Importers, and Tescia Data Analysis seats.
The contract covers a one-year period from April 1, 2025 to March 31, 2026, with performance to be conducted at the John H. Glenn Research Center and Neil Armstrong Test Facility, with options for on-site or teleworking. The procurement is a sole-source contract, with specific requirements that all software, licenses, and support must be obtained through an authorized vendor, and all terms and conditions must be included in the documentation. The total contract includes multiple floating licenses across various software modules, with a total invoice value of approximately $7,424.00.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0038125 Tab 07 Capability Statement Commercial.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Objective/Requirements The Research and Engineering Directorate, at GRC, requires the renewal of maintenance and support for our current IDEAS licensing. The licensing owned needs to have the maintenance and support renewed for another year so we can get patches, SW Support, and upgrades from the Vendor. Any third-party vendor selected must be an approved reseller. The software, licenses and support MUST be obtained only thru an authorized vendor and any terms and conditions associated to the order must be included in the documentation we receive from any bidders. Terms and conditions must be included in the order.
1. Characteristics, Scope, and Specs
2. Place of Performance John H, Glenn Research Center, Neil Armstrong Test Facility and Engineering Users On-site or Teleworking
3. Period of Performance April 1, 2025 – March 32, 2026
File details come from the government source that posted it. Updated .