SATPC0037753 Tab 10 Redacted BNJ.pdf
PDF 623 KB Posted
- Attached to
- Viscometer Federal contract opportunity
- Solicitation number
- 80NSSC25896893Q
About this file
This document is a Brand Name Justification (BNJ) form used by the National Aeronautics and Space Administration Shared Services Center (NASA NSSC) for a procurement action. The document provides multiple potential justification pathways for a single-source or brand-name acquisition, specifically for a solicitation (80NSSC25896893Q) involving a Viscometer. The form indicates that the procurement will be conducted under Federal Acquisition Regulation (FAR) guidelines, with potential justifications ranging from urgent agency needs to unique or highly specialized product requirements. The justification appears to cover acquisitions under $25,000 or $30,000, depending on the specific procurement method (open market or SEWP/IDIQ), and includes provisions for brand name item acquisitions and limited source justifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0037753 Tab 04 4 SOW.pdf | ||
| SATPC0037753 Tab 10 Open Market RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 2 V3.0 01/18/2023
****FOR NSSC SAT USE ONLY****
The above justification in pursuant to one of the following (only select one):
- Recommendation and Determination to Solicit from One Source (RDSS): For open market purchases, pursuant to FAR 5.101(a)(1), the proposed contract action will be placed on SAM.gov under the authority of FAR 13.106 - 1(b)(1)(i).
- Recommendation and Determination to Solicit from One Source (RDSS): For open market purchases, pursuant to FAR 5.101(a)(2), the proposed contraction action was not placed on SAM.gov as oral solicitation will be used to solicit quotation under the authority of FAR 13.106-1(c).
- Recommendation and Determination to Solicit from One Source (RDSS): For open market purchases, pursuant to FAR 5.202(a)(2), the proposed contract action is exempt from publication on SAM.gov because the government would be seriously injured if the Agency complies with the time periods specified in FAR 5.203.
- Brand Name Justification (BNJ): For open market purchases, pursuant to FAR 13.106-1(b)(1)(i), the acquisition of the referenced brand name item is hereby justified. (Under $25,000)
- Brand Name Justification (BNJ): For open market purchases, pursuant to FAR 13.106-1(b)(1)(i), the acquisition of the referenced brand name item is hereby justified. Pursuant to FAR 5.201, any contract action over $25,000 shall be synopsized in the Government wide Point of Entry (GPE) and the brand name justification must be attached.
SEWP/IDIQ Brand Name Justification (BNJ): For schedule/IDIQ purchases, pursuant to FAR 16.505(4)(i)(ii), the acquisition of the referenced brand name item(s) is hereby justified. (under $30,000)
SEWP/IDIQ Brand Name Justification (BNJ): For schedule/IDIQ purchases, pursuant to FAR 16.505(a)(4)(i)(ii)(iii)(A), the acquisition of the referenced brand name item(s) is hereby justified. Any action over $30,000 the brand name shall be posted on the agency website used to solicit offers for orders.
- Limited Source Justification (LSJ) Sole Source: For GSA orders, pursuant to FAR 8.405-6(a)(1)(i)(B), only one source is capable of providing the supplies or services required at the level of quality required because the supplies or services are unique or highly specialized. Action will be performed against GSA Contract ___________________.
- Limited Source Justification (LSJ) Brand Name: For GSA orders, pursuant to FAR 8.405-6(b), the item is peculiar to one manufacturer. A brand name item, whether available on one or more schedule contracts, is an item peculiar to one manufacturer.
- Exception to Fair Opportunity (EFO): For SEWP orders or orders placed against other IDIQ contracts, under the authority of the Federal Acquisition Streamlining Act (FASA) and Pursuant to FAR 16.505(b), exemption under FAR 16.505(b)(2) used is based on the following:
(A) The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays
(B) Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized.
(C) The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.
I hereby accept the above stated recommendation and determine that the circumstances of the contract action deem only one source reasonably available.
X
File details come from the government source that posted it. Updated .