SATPC0037134 Tab 04 4 SOW_Redacted.pdf

PDF 118 KB Posted

Attached to
MicroTest Rig (MTR-3-XR) System Federal contract opportunity
Solicitation number
80NSSC25889911Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This Statement of Work outlines NASA Glenn Research Center's requirement for a MicroTest Rig MTR-3XR system to test composite micropillars within a scanning electron microscope for a Center Innovation Fund project.

The procurement includes one MTR-3 Test Rig System with control electronics and software, an in-situ test frame upgrade for dual use in SEM and Zeiss Xradia Versa, 40 hours of on-site operations training, tensile grip and compression platens, and shipping/installation to Columbus, OH. Additional components include consumables and spare parts such as reusable specimen blocks, load cell modules (50g, 250g, and 1000g), and a 2-year extended warranty. The place of performance is NASA Glenn Research Center in Cleveland, OH, with a shipping lead time of 30 days after receipt of order. This is being pursued as a sole source requirement through NASA Shared Services Center.

View the file

Other files for this federal contract opportunity

Other files attached to MicroTest Rig (MTR-3-XR) System, newest first.
File Type Posted
SATPC0037134 Tab 07 Capability Statement Commercial.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

NASA Glenn Research Center has a requirement for MicroTest Rig MTR-3XR system to test composite micropillars within a scanning electron microscope as part of a Center Innovation Fund project.

2. Characteristics, Scope, and Specs

Qty Description Part #

MTR-3 Test Rig System (includes control electronics, rack, all cabling (2 feedthroughs), computer (see system control below), test control software MTR-2001

In-situ Test Frame Upgrade, MTR-3-XR (dual use in SEM and Zeiss Xradia Versa) MTR-2201

1 Operations Training (40 hours on-site) MTR-1002

Set of 1 Pin load tensile grip plus 2 Compression platens MTR-1201

1 Shipping/Installation - FOB Columbus, OH, USA DEL-0002 Qty Consumables/spare parts Part #

1 set of 5 reusable specimen blocks MTR-1101 1 Load cell module, 50g MTR-1051 1 Load cell module, 250g MTR-1251 1 Load cell module, 1000g MTR-11k1 1 Extended Warranty – 2 year term MTR-9000

3. Place of Performance

NASA Glenn Research Center

Building 49, Room 142 21000 Brookpark Road Cleveland, OH 44135

4. Period of Performance

Shipping lead time: 30 Days ARO

File details come from the government source that posted it. Updated .