This document is a Statement of Work (SOW) for office upgrades at three buildings (N215, N219, and T12-B) at the NASA Ames Research Center in Moffett Field, CA. The SOW covers the design, installation, and build-up of various office furnishings and equipment, including sit/stand desks, whiteboards, bookshelves, chairs, writing desks, and conference tables. The total square footage of the three buildings is approximately 24,413 sq ft. The period of performance is June 2024.
The related federal contract opportunity is a sole source award to C & J Maintenance Construction for these office upgrades under the authority of FAR 13.106-1(b)(1)(i). NASA/NSSC is the procuring agency, and performance will be located at the NASA Ames Research Center. The NAICS code is 561210. Interested organizations may submit their capabilities in writing by July 25, 2024, for the government's consideration of a competitive procurement.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
OBJECTIVE
N215, N219 and T12-B Office Upgrades
SCOPE OF WORK
1. Upgrade Design
a. Design Options to meet Standard Requirements
b. Supply ergonomic and functionality Sit/Stand Desks
2. Build Up (N215, N219 & T12-B)
a. Installation of:
i. Sit/Stand Desks (28)
ii. Whiteboards (12)
iii. Bookshelves to be bracket/braced (18)
iv. Chairs (21)
v. Writing Desk (5.25 Ft) (6)
vi. Conference Tables (6ft) (3)
b. All items will need to be moved from temporary storage to location.
3. T12-B Room 120 - Cube Set Up
a. Power installation
b. Bracing
4. N215 Room 204 - Cube Set Up
a. Power installation
b. Bracing
SPECS
1. Approximately 11,266 Sq. Ft. for Overall Building N215
2. Approximately 8,390 Sq. Ft. for Overall Building N219
3. Approximately 4,757 Sq. Ft. for Overall Building T12-B
PLACE OF PERFORMANCE
1. NASA Ames Research Center – Building N215 Moffett Field, CA 94035
2. NASA Ames Research Center – Building N219 Moffett Field, CA 94035
3. NASA Ames Research Center – Building T12-B Moffett Field, CA 94035
PERIOD OF PERFORMANCE
June 2024