SATPC0035544 Tab 04 4 SOW.pdf
PDF 130 KB Posted
- Attached to
- Test leads, manifolds Federal contract opportunity
- Solicitation number
- 80NSSC24870710Q
About this file
This document is a Statement of Work (SOW) for an investigation of the Explosive Transfer Line for the NASA NESC program. The SOW covers the deliverables for various inert hardware components, including a 4-port manifold, unions, test tips, and a FCDC assembly. The vendor shall also supply aerospace grade confined detonating cord. The hardware does not require flight certification or acceptance data packages. The period of performance for the Section 1.0 deliverables is estimated to be 24 weeks after award.
The related federal contract opportunity is a Special Notice for "Test leads, manifolds" issued by the National Aeronautics and Space Administration Shared Services Center. The solicitation number is 80NSSC24870710Q. No further details are provided in the document beyond the attachment of the SOW.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0035544 Tab 07 Capability Statement FBO Posting.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR NESC EXPLOSIVE TRANSFER LINE
INVESTIGATION
1.0 Scope
This Statement of work will cover the deliverables listed below from Pacific Scientific Energetic Materials Company
LLC (Brand Name):
Line Item
Quantity Device Configuration/Notes
1 5 P/N: 813488-1 4 Port Manifold (INERT)
2 5 P/N: 150496-1 Union (1 input, 1 output INERT)
3 20 P/N: 810475-1 SMDC Test Tips
4 3 P/N: 830074-01 FCDC Assembly
The vendor shall supply aerospace grade confined detonating cord of approximately 2.5 grains per foot.
2.0 Data Deliverables
The hardware does not require flight certification or acceptance data packages.
3.0 Period of Performance
NASA is estimating a period of performance for Section 1.0 deliverables of this document to be complete 24 weeks after ATP.
File details come from the government source that posted it. Updated .