This document is a Statement of Work (SOW) for an Emerson DeltaV Upgrade Hardware & Software Services contract at the NASA Langley Research Center. The SOW outlines the requirements, which include installing new remote client base stations and servers, thin clients, and workstations; upgrading the DeltaV software; migrating the DeltaV database; restoring Continuous Historian data files; replacing unsupported controllers; testing OPC connectivity; and ensuring backup procedures are working. The work is to be performed onsite at the NASA Langley Research Center over a 5-7 week period of performance.
The related federal contract opportunity is a sole source procurement for these Emerson DeltaV upgrade services, to be awarded to ROBERT E MASON & ASSOCIATES INC under the authority of FAR 13.106-1(b)(1)(i). NASA/NSSC is the procuring agency, and the NAICS code is 332911. Interested organizations may submit capabilities and qualifications by 5/31/2024, but the government has sole discretion on whether to compete the effort.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o 1 – Remote Client Base Stations Servers o 4 – Thin Clients o Workstations used to remote into virtual machines
One of the pro stations above will be a repurposed physical server. Uninstall current DeltaV and install the new version of DeltaV
Database final migration from current to final version of DeltaV v15.LTS
Restore DeltaV Continuous Historian data files to new Application station server
Restore AMS database files Setup McAfee anti-virus software unmanaged Replace (6) controllers that are not supported.
Flash (3) new redundant MQ controllers, (3) existing redundant MQ controllers, (1) simplex MQ controller and I/O as required to current revision
Test OPC connection to 3rd party application Ensure daily back-up .bat file is executing properly Check user settings for system operation
3. Place of Performance Michael Croft; Building 1215; Room 102 NASA Langley Research Center (LaRC) 1 NASA Way Hampton, VA 23681
4. Period of Performance 5 – 7 Weeks ARO