SATPC0034195 Tab 04 4 SOW_Redacted.pdf
PDF 169 KB Posted
- Attached to
- FY24 PowerFLOW License Renewal Federal contract opportunity
- Solicitation number
- 80NSSC24861310Q
About this file
This document outlines requirements for the renewal of PowerFLOW software licenses and annual support. NASA Langley Research Center requires PowerFLOW Suite licenses including PowerCASE, PowerACOUSTICS, PowerACOUSTICS Far Field Noise, PowerDELTA, PowerINSIGHT, PowerVIZ, PowerFLOW High Subsonic core, and PowerFLOW Simulation Core. The performance period is April 6, 2024 through April 5, 2025. The National Aeronautics and Space Administration Shared Services Center intends to issue a sole source contract to DS Government Solutions for these items under FAR 13.106-1(b)(1)(i). Responses regarding conducting the procurement on a competitive basis are due no later than February 7, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0034195 Tab 07 Capability Statement SAM.gov Posting Commerical.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
The information listed in the table below is required to complete the PowerFLOW Licenses & Annual Support Renewal.
2. Characteristics, Scope, and Specs
Installed Base Number Version Licensing Scheme Short
Ref Product Name Pricing Structure Qty
LN00026559836 PowerFL OW Suite Concurrent (Shareable) PCA PowerCASE YLC 5
LN00026559840 PowerFL OW Suite Concurrent (Package) PAC-K PowerACOUSTICS YLC 5
LN00026559841
PowerFL OW Suite Concurrent (Package) PAF-K PowerACOUSTICS Far Field
Noise YLC 5
LN00026559837
PowerFL OW Suite Concurrent (Shareable) PDE PowerDELTA YLC 5
LN00026559838
PowerFL OW Suite Concurrent (Shareable) PIN PowerINSIGHT YLC 5
LN00026559839
PowerFL OW Suite Concurrent (Shareable) PVZ PowerVIZ YLC 5
LN00026944933
PowerFL OW Suite Token Based PWH PowerFLOW High Subsonic core YLC 1800
LN00026559842
PowerFL OW Suite Token Based PWS PowerFLOW Simulation Core YLC 1800
3. Place of Performance NASA Langley Research Center 1 Nasa Dr, Hampton, VA 23666
4. Period of Performance
Period of Performance dates of 4/6/2024 - 4/5/2025.
File details come from the government source that posted it. Updated .