SATPC0032922 Tab 04 4 SOW_Redacted.pdf

PDF 122 KB Posted

Attached to
OptiTrack Motion System Federal contract opportunity
Solicitation number
80NSSC23842357Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This statement of work outlines the technical requirements for purchasing an OptiTrack motion capture system and components for use on a pilot excavator. Key details include the purchase of one Motive:Tracker 3.X+ license, one security key, various camera mounts and markers, Ethernet cables in different lengths, one eSync 2 unit, one PoE+ Ethernet switch, two active base stations, two active pucks, one calibration square, one calibration wand kit, and 36 OptiTrack SlimX 13 cameras with 850nm band-pass filters and no sync ports. Delivery and performance will take place at NASA's Kennedy Space Center in Florida within 30 days after receipt of order. The related federal contract opportunity is solicitation number 80NSSC23842357Q for an OptiTrack motion capture system from the National Aeronautics and Space Administration Shared Services Center.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

The objective is to purchase the OptiTrack SlimX 13 Camera System and Components for continue use for the Pilot Excavator.

2. Characteristics, Scope, and Specs

Quantity OEM Part # Product Description

1 MTV-TKR-3 Motive:Tracker 3.X+ License

1 SECKEY Security Key

36 TRA1010

Manfrotto Super Clamp with 3-way Head (#056, #035 &

#037)

2 MKR190M4-10 Marker: 19.0 mm (3/4"), M4 thread - 10 pack

20 MBA19MMR Marker Base Adhesive Dot - Large 19 mm (3/4") - Rubber

20 MB20W05HM4F

Marker Base: Flexible, M4 thread, 20 mm base (L), 5 mm height (S)

36 CBL2000 150ft Cat6A Shielded Ethernet Cable

3 CBL1096 75ft Cat6A Shielded Ethernet Cable

5 CBL1065 Ethernet Cable, Cat 6 : 3 feet

1 OPTESY2 eSync 2

2 SWT1080 Ethernet PoE+ Switch : D-LINK DGS-1250-28XMP-6KV

1 ACTTK0001 Active BaseStation

2 ACTPUK0001 Active Puck

1 CSA-200 CSA-200 Active Calibration Square

1 CWA-500 CWA-500 Active Calibration Wand Kit

SX13.LENS0032.FSBP.N

S

SlimX 13|56° x 46° FOV (5.5mm)|Filter Switcher:

850nm Band-Pass (IR) / 700nm (Visible)|No Sync Port

(sync through eSync 2 only)

3. Place of Performance

NASA Kennedy Space Center

NASA Parkway

KSC, FL 32899

4. Period of Performance

Period of Performance Dates: 30 Days ARO

File details come from the government source that posted it. Updated .