SATPC0032743 Tab 04 4 SOW.pdf
PDF 116 KB Posted
- Attached to
- Purchase pressure transducers to support project CCE-Phase 4 Windmill/Engine Test Federal contract opportunity
- Solicitation number
- 80NSSC23845899Q
About this file
This statement of work outlines requirements for the purchase of pressure transducers to support windmill and engine testing. The National Aeronautics and Space Administration requires the delivery of 16 pressure transducers from Setra, including five model 2041025PD2F2B0293N, three model 2041050PG2F2B0293N, six model 2041100PG2F2B0293N, and two model 2041500PG2F2B0293N. The contractor must calibrate the transducers prior to shipping them. Delivery is needed by November 30th, 2023 to the 10x10 SWT facility at Glenn Research Center in Brookpark, Ohio. Installation will occur in December 2023 and January 2024, with testing running from February 1st, 2024 through June 30th, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0032743 Tab 10 Open Market RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements Purchase pressure transducers needed for CCE-Phase 4 Windmill/Engine Test.
2. Characteristics, Scope, and Specs
The contractor shall provide the following Setra pressure transducers:
o 5 x model # 2041025PD2F2B0293N.
o 3 x model # 2041050PG2F2B0293N.
o 6 x model # 2041100PG2F2B0293N.
o 2 x model # 2041500PG2F2B0293N.
Transducers shall be calibrated by the contractor prior to shipping.
Reference attached quote sheet for further information.
3. Place of Performance 10x10 SWT facility at Glenn Research Center, Brookpark, OH.
4. Period of Performance Contractor will provide transducers to GRC by November 30, 2023 to support the project testing schedule.
10x10 SWT personnel will install transducers during December, 2023 and January, 2024.
Testing shall occur between 1 February, 2024 and June 30, 2024.
Prepared by: Bret Warren, 10x10 SWT, 3 August 2023.