SATPC0032092 Tab 07 SOW_Redacted.pdf
PDF 12 KB Posted
- Attached to
- Magnetron Sputter System Up-Grade Federal contract opportunity
- Solicitation number
- 80NSSC23841877Q
About this file
This statement of work outlines requirements for upgrading a magnetron sputter system at NASA Langley Research Center. The scope of work includes supplying and installing an RF power supply module rated for 600W at 13.56MHz along with an auto matching box, software upgrades for PLC and CIMON programming, electrical wiring system interlocks and recipes. On-site installation is required by one technician for 1.5 weeks including airplane travel, lodging, meals, transportation and labor costs. The period of performance is 1.5 weeks to complete installation, functionality testing and performance verification. The related federal contract opportunity posted on the National Aeronautics and Space Administration Shared Services Center website with solicitation number 80NSSC23841877Q is also for the magnetron sputter system upgrade at the same location.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
Magnetron Sputter System Up-Grade (Attach RF Power)
2. Characteristics, Scope, and Specs
Description: Magnetron Sputter System Up-Grade (Attach RF Power) Quantity
RF power & Auto matching box (supply)
600W, 13.56MHz Power Supply Module
Software upgrade (supply)
PLC & CIMON Programing
Electrical Wiring
System Interlock & Recipe
On-site Installation: One Man for 1.5week (service)
Airplane Fee
Room Charge & Meals (one room)
Transportation Cost (Rent Car & Insurance)
Labor Costs (one man)
3. Place of Performance
NASA Langley Research Center
Hampton VA 23681
4. Period of Performance
Installation including functionality and performance check will be completed in 1.5 weeks.
File details come from the government source that posted it. Updated .