SATPC0032045 Tab 04 4 SOW.pdf

PDF 100 KB Posted

Attached to
VIC-3D Digital Image Correlation System (HW and SW) Federal contract opportunity
Solicitation number
80NSSC23841753Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This statement of work outlines requirements for a VIC-3D Digital Image Correlation System to be delivered to NASA Langley Research Center. The scope includes a VIC-3D system with iris cameras and analysis software, additional VIC-2D software, image acquisition software, an aluminum cart workstation, digital cameras, lenses, extension rings, polarizing filters, an analog data acquisition system, LED lighting systems, a stereo mounting system, tripods, calibration targets, carrying cases, speckle pattern application kits, post-processing licenses, system maintenance, training, and a two-year warranty on non-consumables. The period of performance is 12-16 weeks for delivery to NASA Langley Research Center located at 11 West Taylor St. Bldg 1146 in Hampton, Virginia. The related federal contract opportunity is solicitation number 80NSSC23841753Q issued by the National Aeronautics and Space Administration Shared Services Center for the VIC-3D Digital Image Correlation System and associated hardware and software.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Objective/Requirements

NASA Langley Research Center has a requirement for the VIC-3D Digital Image Correlation System.

Characteristics, Scope, and Specs

Item Description Qty VIC-3D VIC-3D Digital Image Correlation System

-Vic-3D 9 with iris Digital Image Correlation Analysis Software

-Vic Fulcrum Software Module (for vibration or fatigue synchronization)

-Vic-2D 7 with iris Digital Image Correlation Analysis Software

(included at no additional cost)

-Vic-Snap FC Image Acquisition Software

-One CSI Aluminum Cart Workstation with no PC or monitors;

includes UPS, rear access panel, and four locking drawers

-Two 12.3 Megapixel (4096 x 3000 @ 20 fps) Digital Cameras

-Two f2.8/25mm lenses

-Two f2.8/50mm lenses

-Two Extension Ring Sets (includes 0.5, 1, 2, 5, 10, 20, 40mm rings)

-Four M30.5 x 0.5 Mounted Linear Glass Polarizing filters

-One analog data acquisition system for LS, Gauge, Fulcrum, &

HS

up to 1MS/s / 8 channels

-Two CSI LED Lighting Systems with Positioning Arms w/polarizing filters

-One Aluminum Channel Stereo Mounting System with fine adjustment for low-speed cameras

-One Professional tripod

-One Super Pro Tripod Head

-One Professional Tripod Bag

-Eight aluminum composite calibration targets (FOV: 1-18") with carrying case

-Includes one "Image Correlation for Shape, Motion and

Deformation Measurements" book

-Two hard-sided carrying cases for cameras, lenses, and accessories

-VIC Speckle Pattern Application Full Kit (.007, .013, .026, .05, .1, .2" dot size roller wheels, stamps, with ink pad, ink, & case)

-Includes one post-processing license on USB dongle

-Using CSI Gold System Maintenance contract in place at LaRC

-Includes delivery and two-day onsite training

-Two year warranty on all non-consumables Real-Time VIC-3D Full-Field Real-Time Analysis Software Module (up to 10

Hz) Add-on

Place of Performance

NASA LaRC 11 West Taylor St. Bldg 1146 Hampton, VA 23681 Attn:

Period of Performance

12-16 weeks for delivery

File details come from the government source that posted it. Updated .