SATPC0031002 Tab 04 4 SOW.pdf
PDF 98 KB Posted
- Attached to
- Transfer Port Manufacturing Federal contract opportunity
- Solicitation number
- 80NSSC23833845Q
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0031002 Tab 10 RFQ Open Market (full and open).pdf | ||
| SATPC0031002 Questions and Answers.pdf | ||
| SATPC0031002 CAD Model Reference.pdf | ||
| SATPC0031002 SP10021Rev1 (drawing).pdf | ||
| SATPC0031002 SP10018Rev1 (drawing).pdf | ||
| SATPC0031002 sp10037_rev_1 (drawing).pdf | ||
| SATPC0031002 Tab 10 RFQ Open Market.pdf | ||
| SATPC0031002 SP10019 (drawing).pdf | ||
| SATPC0031002 sp10013_rev_1 (drawing).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Aeronautics and Space Administration
Lyndon B. Johnson Space Center 2101 NASA Road 1 Houston, Texas 77058-3696
Latest Version: 002 Last Updated: 08/04/2022
STATEMENT OF WORK
Procurement of Manufacturing for Transfer Port Hardware
Manufacturing capability is being procured to be used at JSC for Transfer Port demonstrations. The parts should be manufactured according to the following details:
1. QTY 1 of part SP10013-301 – BULKHEAD FRAME ASSEMBLY should be constructed according to the attached drawing and subsequent parts list.
2. QTY 1 of part SP10037-301 – BULKHEAD HATCH ASSEMBLY should be constructed according to the attached drawing and subsequent parts list.
3. QTY 3 of part SP10018-301 – FLIPPER BASE ASSEMBLY, SUITPORT EVALUATION should be constructed according to the attached drawing and subsequent parts list.
4. QTY 3 of part SP10019-301 – FLIPPER LATCH ASSY should be constructed according to the attached drawing and subsequent parts list.
5. QTY 15 of part sp10021-001 – FLIPPER SHOULDER BUSHING should be constructed according to the attached drawing.
6. Utilize all drawing notes and specs called out in all drawings. Referenced documents are included in the attachment. CAD models of the parts are provided for reference.
7. The full assembly should be delivered to NASA Johnson Space Center and delivery fees should be part of the cost estimate along with an estimated lead time (8-10 weeks preferred).
cdguidr1 Highlight cdguidr1 Highlight cdguidr1 Highlight cdguidr1 Highlight cdguidr1 Highlight
File details come from the government source that posted it. Updated .