SATPC0031002 Tab 04 4 SOW.pdf

PDF 98 KB Posted

Attached to
Transfer Port Manufacturing Federal contract opportunity
Solicitation number
80NSSC23833845Q
Issued by
National Aeronautics and Space Administration Shared Services Center

View the file

Other files for this federal contract opportunity

Other files attached to Transfer Port Manufacturing, newest first.
File Type Posted
SATPC0031002 Tab 10 RFQ Open Market (full and open).pdf PDF
SATPC0031002 Questions and Answers.pdf PDF
SATPC0031002 CAD Model Reference.pdf PDF
SATPC0031002 SP10021Rev1 (drawing).pdf PDF
SATPC0031002 SP10018Rev1 (drawing).pdf PDF
SATPC0031002 sp10037_rev_1 (drawing).pdf PDF
SATPC0031002 Tab 10 RFQ Open Market.pdf PDF
SATPC0031002 SP10019 (drawing).pdf PDF
SATPC0031002 sp10013_rev_1 (drawing).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Aeronautics and Space Administration

Lyndon B. Johnson Space Center 2101 NASA Road 1 Houston, Texas 77058-3696

Latest Version: 002 Last Updated: 08/04/2022

STATEMENT OF WORK

Procurement of Manufacturing for Transfer Port Hardware

Manufacturing capability is being procured to be used at JSC for Transfer Port demonstrations. The parts should be manufactured according to the following details:

1. QTY 1 of part SP10013-301 – BULKHEAD FRAME ASSEMBLY should be constructed according to the attached drawing and subsequent parts list.

2. QTY 1 of part SP10037-301 – BULKHEAD HATCH ASSEMBLY should be constructed according to the attached drawing and subsequent parts list.

3. QTY 3 of part SP10018-301 – FLIPPER BASE ASSEMBLY, SUITPORT EVALUATION should be constructed according to the attached drawing and subsequent parts list.

4. QTY 3 of part SP10019-301 – FLIPPER LATCH ASSY should be constructed according to the attached drawing and subsequent parts list.

5. QTY 15 of part sp10021-001 – FLIPPER SHOULDER BUSHING should be constructed according to the attached drawing.

6. Utilize all drawing notes and specs called out in all drawings. Referenced documents are included in the attachment. CAD models of the parts are provided for reference.

7. The full assembly should be delivered to NASA Johnson Space Center and delivery fees should be part of the cost estimate along with an estimated lead time (8-10 weeks preferred).