STATEMENT OF WORK SAMPLE
1. Objective/Requirements
T-VAC Chamber, (Equipment) Model5ST-2-A-0.169T-VTVQ-C.
2. Characteristics, Scope, and Specs
PROCESS AND CHAMBER OVERVIEW
Air Circulation Vertical
Heat Rating
2 KW
Refrigeration Rating
2.0 HP
Refrigeration Type Cascade, Air Cooled
Required Voltage 230V-1Phase-60Hz RLA 35A, Fuse for 45A
Heat Type Nichrome wire
Operating Temp. Range -70°C to +177°C
Temperature Control ±1°C
Altitude Range Sea level to 0.169 Torr (200,000 feet), ±5 Torr
Vacuum Pump Type Oil Sealed Rotary Lobe Type
EQUIPMENT DESCRIPTIONS AND MATERIALS
Nominal Dimensions Width Depth Height
Interior 21” 21” 25”
Exterior 52” OAW 63” OAD 78” OAH
Material of Construction Material Thickness Finish
Interior
Walls and Ceiling Type 304 Stainless Steel 14 Gauge Mill
Floor Type 304 Stainless Steel 14 Gauge Mill
Exterior
Exterior Cold Rolled Steel 18 Gauge White Powder Coat
Insulation Fiberglass & Urethane Standard
3. Place of Performance
Wallops Flight Facility 34200 Fulton Street Wallops Island, VA 23337
4. Period of Performance
48 – 52 Weeks ARO
| Air Circulation Vertical: | |
| Heat Rating 2 KW: | |
| Vacuum Pump Type Oil Sealed Rotary Lobe Type: | |
| Width: | |
| Depth: | |
| Height: | |
| Interior: | |
| Exterior: | |
| Insulation: | |
| Fiberglass Urethane: | |
| Standard: | |
| 2023-04-19T14:36:16-0400 | |
| BRETT VINCENT |