Navigation System Prognostic Service Development FY23-FY24

Description: This task will mature a collaboratively developed modeling and simulation (M&S) tool designed to assess the performance Global Navigation Satellite System (GNSS) in complex environments.

Existing validated M&S tools will be used to the greatest degree possible. This new capability that has been prototyped and demonstrated to be feasible will continue to be developed into a prognostic service to provide the infrastructure necessary for future AAM/UAM operations. This development will incorporate GPS and other viable GNSS services to provide the end user with the flexibility necessary to support mission-critical advanced air mobility capabilities.

Task Structure: The continuation task will focus on the final deployment of a designed prognostic service.

Modeling tool deployment and transition o Support modeling tool deployment in a representative compute architecture o Provide transition support for modeling tool to non-NASA users o Implement incorporation of sensor network measurements into the model

Technical Details: NASA seeks to extend the modeling capability developed in previous tasking to include additional geographic regions, incorporate GPU acceleration, and add measurements from local monitoring receivers.

Deliverables

GIT repository with all the following requirements:

o Code

Local interface (real-time/on board) Visualization Tools Server Front End Server Back End Unit/Automation Tests o Documentation Top level explanation API explanation Input creation and output handling Additional Resources (E.g., links to papers) o User Manual Requirements Installation process Execution process o Container (Docker, or similar) All deliverables will be per FAR 52.227-14 Rights in General Alt. III & IV.

Cost and Schedule

Estimated duration: 12 calendar months Estimated level of effort: 1.2 FT