SAM - FDC Philadelphia Solid Waste Removal 15BFA025Q00000027.pdf

PDF 438 KB Posted

Attached to
FDC Philadelphia Solid Waste Removal Federal contract opportunity
Solicitation number
15BFA025Q00000027
Issued by
Department of Justice Bureau of Prisons Field Acquisition Office

About this file

This is a Request for Quote (RFQ) issued by the Federal Bureau of Prisons Field Acquisition Office for solid waste removal services at the Federal Detention Center (FDC) in Philadelphia, Pennsylvania. The procurement is set aside 100% for small businesses under NAICS code 562111 with a size standard of 47 million.

The requirement is for a 32 cubic yard compactor rental and solid waste removal services, with an estimated 535 tons of waste per year. Contractor must provide all equipment, labor, and expertise including installation of a totally enclosed roll-on/off compactor with lockable hopper door. Pick-ups are required twice per week between 5:00-6:30am, with an estimated 124 pulls per year. The base period is 12 months from award with four 12-month option periods. Quotes are due January 9, 2025 at 10:00am Central Time and must be submitted electronically to jholleman@bop.gov. The anticipated award date is January 2025 with performance beginning February 1, 2025. Pricing must be provided for the base and all option years, with separate line items for compactor rental, pull fees, per-ton disposal fees, and trip charges.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Justice Federal Bureau of Prisons

Administration Division Field Acquisition Office Grand Prairie, Texas 75051

RE: Request for Quote 15BFA025Q00000027 Solid Waste Removal Services Federal Detention Center (FDC) – Philadelphia, Pennsylvania

Dear Quoter:

Attached is a solicitation package prepared by the Federal Bureau of Prisons, Field Acquisition Office, for the provision of Solid Waste Removal Services for FDC Philadelphia. This package contains all necessary information to submit a quote.

When submitting your quote, you shall consider all information provided herein. Please carefully follow all instructions located on pages 38-40 of the solicitation package concerning content, format, and submission of quotes.

All potential quoters are advised that this solicitation includes the clause at FAR 52.212-4 for Commercial Items. Paragraph (t), System for Award Management (SAM), of this clause requires that all quoters doing business with the Federal Government to be registered in the SAM database. Quoters should include their Unique Entity Number in their quotes. The Contracting Officer will verify registration in the SAM database prior to award by entering the potential awardees Unique Entity ID number into the SAM database. Failure to complete the registration procedures outlined in this clause may result in elimination from consideration for award. For the purposes of this solicitations, all quoters SAM registration should include NAICS code 562111.

If you have questions about the System for Award Management (SAM), Government procurements in general, or need assistance in the preparation of your quote, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org.

Quotes shall be received on or before the deadline of January 9, 2025, at 10:00 a.m. Central Time.

Quotes shall be submitted electronically via email to jholleman@bop.gov in pdf format only and will be deemed received at the time as indicated on the email notification. Faxed and hand delivered quotes will not be accepted.

Please submit any questions you may have in writing. Questions may be submitted via email to jholleman@bop.gov.

Sincerely, //s// John Holleman, Contracting Officer mailto:jholleman@bop.gov mailto:jholleman@bop.gov.

15BFA025Q00000027 Page 1 of 53

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 AND 30.

1. REQUISITION NUMBER PAGE 1 OF

5. SOLICITATION NUMBER

15BFA025Q00000027

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 6. SOLICITATION ISSUE

DATE

12/19/2024

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

John Holleman jholleman@bop.gov

b. TELEPHONE NUMBER (No collect calls)

202-598-6011

8. OFFER DUE DATE / LOCAL

TIME

01/09/2025 10:00 CT

CODE 15BFA0

Federal Bureau of Prisons

Field Acquisition Office

U.S. Armed Forces Reserve Complex

346 Marine Forces Drive

Grand Prairie, TX 75051

9. ISSUED BY UNRESTRICTED OR X SET ASIDE:100.00 % FOR

X SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

8(A)

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

562111

SIZE STANDARD:

47 mil

10. THE ACQUISITION IS

SEE SCHEDULE

11. DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

NET 30

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER THE

DEFENSE PRIORITIES AND

ALLOCATIONS SYSTEM -

DPAS (15 CFR 700)

13b. RATING

X REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

14. METHOD OF SOLICITATION

15B217CODE15. DELIVER TO CODE 15B21716. ADMINISTERED BY

Federal Bureau of Prisons FDC Philadelphia 700 Arch Street Philadelphia, PA 19106

FACILITY

CODE

CODE

TELEPHONE NUMBER

17a. CONTRACTOR/

OFFEROR

15B217CODE18a. PAYMENT WILL BE MADE BY

Federal Bureau of Prisons FDC Philadelphia 700 Arch Street Philadelphia, PA 19106

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER SEE ADDENDUM

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

To Provide Solid Waste Removal services for FDC Philadelphia in accordance with the Statement of Work

Unique Entity Number:

Firm Fixed Price

See Continuation Sheet(s) (Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

X 27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

X ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED.

29. AWARD OF CONTRACT: REFERENCE _____________________________

OFFER DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK

5) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (Type or print)

John Holleman

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

15BFA025Q00000027 Page 2 of 53

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

PARTIAL FINAL

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

COMPLETE PARTIAL FINAL

36. PAYMENT 37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 11/2021) BACK

15BFA025Q00000027 Page 3 of 53

Table of Contents

Section Description Page Number

1 Solicitation/Contract Form 2 Commodity or Services Schedule

2.1 Pricing Methodology

2.2 Schedule of Services/Statement of Work Solid Waste Removal

2.3 Special Contract Conditions

3 Contract Clauses 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Jun 2020) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services (Dec 2022) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.232-18 Availability of Funds (Apr 1984) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Nov 2021) 52.242-13 Bankruptcy (July 1995) 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services (May 2024) 52.216-18 Ordering (Aug 2020) 52.216-19 Order Limitations (Oct 1995) 52.216-21 Requirements (Oct 1995) 52.217-9 Option to Extend the Term of the Contract (Mar 2000) 52.232-19 Availability of Funds for the Next Fiscal Year (Apr 1984) 2852.201-70 Contracting Officer's Representative (COR) (NOV 2020) 2852.223-70 Unsafe Conditions Due to the Presence of Hazardous Material (NOV 2020)

BOP 2852.237-72 DOJ CONTRACTOR RESIDENCY REQUIREMENT BUREAU OF

PRISONS (JUNE 2004)

BOP 2852.242-71 EVALUATION OF CONTRACTOR PERFORMANCE UTILIZING CPARS

(APR 2011)

DOJ-01 Whistleblower Information Distribution (Oct 2021) DOJ-02 Contractor Privacy Requirements (JAN 2022) DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021) DOJ-04 Federal Workplace Responses to Domestic Violence, Sexual Assault, and Stalking

(DEC 2014)

DOJ-08 Continuing Contract Performance During a Pandemic Influenza or other National Emergency (OCT 2007)

4 List of Attachments 5 Solicitation Provisions

52.204-7 System for Award Management (Oct 2018) 52.212-1 Instructions to Offerors-Commercial Products and Commercial Services (Nov 2021) 52.217-5 Evaluation of Options (July 1990) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.204-29 Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures (Dec 2023) 52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services (Dec 2022) 2852.233-70 Protests Filed Directly with the Department of Justice (NOV 2020)

5.1 Tailoring/Quote Submission Requirements Instructions/Evaluation Award Methodology/

SAM/PTAC/FOIA

15BFA025Q00000027 Page 4 of 53

Section 2 - Commodity or Services Schedule

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Solid Waste Removal Base Year See Section 2.2 "Schedule of Services" on pages 5-7 of solicitation.

Effective Date of Award (EDOA)-through twelve months from

EDOA.

Estimated Maximum

PSC: S222

Base Period

1 YR $________ $_________________

ITEM NO. SUPPLIES/SERVICES EST.

QUANTITY

UNIT UNIT PRICE AMOUNT

0002 Solid Waste Removal Option Year 1 See Section 2.2 "Schedule of Services" on pages 5-7 of solicitation.

13 months from Effective Date of Award (EDOA) through 24 months from EDOA.

Estimated Maximum

PSC: S222

Unexercised Option 1

1 YR $________ $_________________

ITEM NO. SUPPLIES/SERVICES EST.

QUANTITY

UNIT UNIT PRICE AMOUNT

0003 Solid Waste Removal Option Year 2 See Section 2.2 "Schedule of Services" on pages 5-7 of solicitation.

25 months from Effective Date of Award (EDOA) through 36 months from EDOA.

Estimated Maximum

PSC: S222

Unexercised Option 2

1 YR $________ $_________________

ITEM NO. SUPPLIES/SERVICES EST.

QUANTITY

UNIT UNIT PRICE AMOUNT

0004 Solid Waste Removal Option Year 3 See Section 2.2 "Schedule of Services" on pages 5-7 of solicitation.

37 months from Effective Date of Award (EDOA) through 48 months from EDOA.

Estimated Maximum

PSC: S222

Unexercised Option 3

1 YR $________ $_________________

ITEM NO. SUPPLIES/SERVICES EST.

QUANTITY

UNIT UNIT PRICE AMOUNT

0005 Solid Waste Removal Option Year 4 See Section 2.2 "Schedule of Services" on pages 5-7 of solicitation.

1 YR $________ $_________________

15BFA025Q00000027 Page 5 of 53

49 months from Effective Date of Award (EDOA) through 60 months from EDOA.

Estimated Maximum

PSC: S222

Unexercised Option 4

Aggregate Total:$____________________(Base plus all option periods)

2.1 Pricing Methodology

Quoters are required to submit, as part of their quote, a completed copy of Section 2, “Commodity or Services Schedule.” The quantity of services to be provided by the Contractor is estimated. These estimates are not a representation to a quoter or contractor that the estimated quantities will be required or ordered, or that conditions affecting requirements will remain stable or normal.

Contract pricing shall include all charges to the Government for providing the services required by this solicitation.

Pursuant to FAR 17.203(b), the Government’s evaluation shall be inclusive of options. The Government will evaluate quotes for award purposes by adding the total price of all options to the total price of the base year requirement. Pursuant to FAR 17.203(d), the quoters may offer varying prices for options, depending on the quantities actually ordered and the dates when ordered.

2.2 Schedule of Services/Statement of Work Solid Waste Removal

Schedule of Services

Base Year -

Rental of (1) self-contained compactor with 32 cubic yard closed container. Estimated maximum.

12 months x $____________ per month = $____________ per year.

Pull fee for 32 cubic yard compactor. Estimated maximum.

124 each x $______________ per month = $____________ per year.

Per Ton disposal fee for an estimated 535 tons of solid waste. Estimated maximum.

535 Tons x $______________ per month = $____________ per year.

Trip charge for Government caused inability to pull compactor according to the Schedule identified in the Statement of Work. Estimated maximum.

12 each x $______________ per month = $____________ per year.

Total for Base Year: $________________

Option Year 1 –

Rental of (1) self-contained compactor with 32 cubic yard closed container. Estimated maximum.

12 months x $____________ per month = $____________ per year.

Pull fee for 32 cubic yard compactor. Estimated maximum.

124 each x $______________ per month = $____________ per year.

Per Ton disposal fee for an estimated 535 tons of solid waste. Estimated maximum.

15BFA025Q00000027 Page 6 of 53

535 Tons x $______________ per month = $____________ per year.

Trip charge for Government caused inability to pull compactor according to the Schedule identified in the Statement of Work. Estimated maximum.

12 each x $______________ per month = $____________ per year.

Total for Option Year 1: $________________

Option Year 2 –

Rental of (1) self-contained compactor with 32 cubic yard closed container. Estimated maximum.

12 months x $____________ per month = $____________ per year.

Pull fee for 32 cubic yard compactor. Estimated maximum.

124 each x $______________ per month = $____________ per year.

Per Ton disposal fee for an estimated 535 tons of solid waste. Estimated maximum.

535 Tons x $______________ per month = $____________ per year.

Trip charge for Government caused inability to pull compactor according to the Schedule identified in the Statement of Work. Estimated maximum.

12 each x $______________ per month = $____________ per year.

Total for Option Year 2: $________________

Option Year 3 –

Rental of (1) self-contained compactor with 32 cubic yard closed container. Estimated maximum.

12 months x $____________ per month = $____________ per year.

Pull fee for 32 cubic yard compactor. Estimated maximum.

124 each x $______________ per month = $____________ per year.

Per Ton disposal fee for an estimated 535 tons of solid waste. Estimated maximum.

535 Tons x $______________ per month = $____________ per year.

Trip charge for Government caused inability to pull compactor according to the Schedule identified in the Statement of Work. Estimated maximum.

12 each x $______________ per month = $____________ per year.

15BFA025Q00000027 Page 7 of 53

Total for Option Year 3: $________________

Option Year 4 –

Rental of (1) self-contained compactor with 32 cubic yard closed container. Estimated maximum.

12 months x $____________ per month = $____________ per year.

Pull fee for 32 cubic yard compactor. Estimated maximum.

124 each x $______________ per month = $____________ per year.

Per Ton disposal fee for an estimated 535 tons of solid waste. Estimated maximum.

535 Tons x $______________ per month = $____________ per year.

Trip charge for Government caused inability to pull compactor according to the Schedule identified in the Statement of Work. Estimated maximum.

12 each x $______________ per month = $____________ per year.

Total for Option Year 4: $________________

Aggregate Total of Base Year and All Options: $__________________

Statement of Work Solid Waste Removal

Introduction:

The Federal Bureau of Prisons, Field Acquisition Office in Grand Prairie, Texas, intends to make a single award for the provision of Solid Waste Removal Services for the Federal Detention Center (FDC), located in Philadelphia, Pennsylvania. The contract type is indefinite delivery / requirements contract with firm-fixed prices.

Place of Performance:

Services will be performed on-site at FDC Philadelphia, 700 Arch Street, Philadelphia, Pennsylvania 19106.General information regarding the BOP and its facilities are located at www.bop.gov .

Method of Performance:

The Contractor shall provide all equipment, labor, and expertise required for the removal and disposal of solid waste from FDC Philadelphia. The following equipment and related services shall be provided by the Contractor.

Equipment: One totally enclosed, roll on/off 32 cubic yard compactor, with a lockable loadable hopper door. Maximum height of 48". The compactor power unit shall operate on 480 Volts, 3 Phase Power. Minimum hydraulic packing force of 40,000 lbs. Cycle time of approximately 30 seconds. This compactor shall be located inside the secure perimeter of the institution in the rear dock. The waste will consist of paper, packaging, food waste, cans, and items similar to residential waste.

15BFA025Q00000027 Page 8 of 53

All equipment, supplies, compactor, and controls, to include a spare power-unit, shall be supplied by the Contractor. In the event the waste is frozen or stuck in the compactor, the Contractor is responsible for emptying the unit or providing an identical empty self-enclosed compactor at no additional cost to the institution.

When spills occur as a result of equipment failure, the Contractor shall be responsible for all spills and related clean-up cost. The Contractor shall ensure compactor locations are clean prior to removing the container from the area

The Contractor shall not be required to pay for the space occupied hereunder when in use on the premises of FDC Philadelphia. The Contractor shall not be required to pay the cost of any utilities for the operation of the compactor.

Installation: The Contractor shall provide and install compaction equipment at its own expense at the required location in the rear loading dock. All equipment furnished shall have all required safety devices identified with a control number and installed to prevent seepage and accumulation of debris underneath.

Service: The Contractor shall ensure that all solid waste is disposed of in accordance with Federal, State, and local law and regulations. All licenses, permits, and fees related to trash removal and disposal shall be the responsibility of the Contractor. The Government estimates that the contractor shall dispose of an estimated maximum 535 tons of solid waste per year.

The Contractor shall provide copies of all receipts related to the disposal of solid waste. The receipt must include the weight of the waste dumped. The receipts shall be addressed to the Facility Manager at FDC Philadelphia, PHI/Facilities-@bop.gov and shall be sent at least once per month, not later than the fifth working day of the month.

Maintenance: All required repairs to the supplied equipment shall be the responsibility of the Contractor. Response time is defined as the time at which the contractor is notified and the time at which the contractor arrives onsite at FDC Philadelphia to begin the repair process. The response time for repairs shall be Monday through Friday, 7:30 a.m. to 3:00 p.m., within four (4) hours of notification.

Weekend and holiday response time will be six (6) hours.

In the event the compactor cannot be repaired in place, the Contractor is responsible for providing an identical empty self-enclosed compactor at no additional cost to the institution within six (6) hours.

Performance Schedule:

The Contractor shall pull and exchange the compactor an estimated two times per week. A schedule of days, at the unilateral right of FDC Philadelphia, will be determined after contract award. The compactor will be removed from the institution no later than 5:00 a.m., emptied, cleaned, and returned to the institution no later than 6:30 a.m. in such a way as to ensure continuous availability to the institution. At no time shall FDC Philadelphia be without a compactor longer than the time necessary to remove full, empty, clean, and return empty detailed above.

Due to security requirements, the compactor shall be exchanged only during the hours above and will undergo special security procedures. The above schedule is subject to change based on the needs of the FDC Philadelphia.

Unless emergency situations dictate otherwise, a notice of 24 hours will be given if additional pulls are required. Any additional pulls requested by FDC Philadelphia in excess of the estimated maximum identified in the Section 2, Schedule of Services, shall be invoiced at the applicable contract rate identified in the Schedule of Services.

If a scheduled pull falls on a federal holiday, the pull shall be accomplished by the Contractor on the following business day.

Should the compactor be unable to be pulled successfully due to security reasons arising from action of FDC Philadelphia, the contractor will be paid the applicable trip charge as identified in the Schedule of Services. However, if the compactor is unable to be pulled successfully or on the scheduled day, due to reasons by the contractor, FDC Philadelphia reserves the unilateral right to determine the next pull based upon the needs of the institution.

Title to Equipment:

Title of the compactor will remain with the Contractor. All equipment and components of the compactor are the sole property of the Contractor.

15BFA025Q00000027 Page 9 of 53

In the event of termination, the Contractor shall properly remove all its property at its own expense, at a date/time determined by FDC Philadelphia. Upon the Contractor’s failure to do so, the BOP shall remove and store such property and charge the Contractor for any expenses incurred for such removal and storage.

Risk of Loss:

The Contractor assumes full risk of and responsibility for any loss, destruction or damage occurring to the trash removal equipment, components or containers, except such loss or damage as may be attributed to FDC Philadelphia by reason of negligence of its employees while acting within the scope of their employment. Additionally, the Contractor is responsible for all spills from the container during pick-up thru transportation to the disposal site.

2.3 Special Contract Conditions

Type of Contract: The Government contemplates a single award of an indefinite delivery/requirements type contract with firm-fixed unit prices resulting from this solicitation. It is anticipated that the contract resulting from this solicitation will be awarded in January 2025 and with an anticipated effective date of award (EDOA) of February 1, 2025. On or about the EDOA, FDC Philadelphia will issue a task order to the contractor. The contractor shall commence full performance of services on the EDOA. Therefore, all background clearances shall be completed prior to the EDOA.

The resulting contract will include a base year period from the effective date of award (EDOA) through 12 months from the EDOA with four (4) possible 12-month option years for renewal at the unilateral discretion of the Government. Quoters are advised that the Government has the unilateral right to exercise option periods in accordance with FAR 52.217-9, "Option to Extend the Term of the Contract.”

Performance Period(s): The anticipated effective date of award (EDOA) is February 1, 2025.

Base Year: EDOA through 12 months from EDOA;

Option Year 1: 13 months from EDOA through 24 months from EDOA;

Option Year 2: 25 months from EDOA through 36 months from EDOA;

Option Year 3: 37 months from EDOA through 48 months from EDOA;

Option Year 4: 49 months from EDOA through 60 months from EDOA.

Point of Acceptance: The point of acceptance for services is FDC Philadelphia.

Non-Personal Services Information: This service is a contractual arrangement and not a personnel appointment. Payment is based on the provision of an end product or the accomplishment of a specific task. The service does not constitute an employer/employee relationship. The contractor will not be subject to Government supervision, except for security related matters. However, contractor performance shall be monitored. The contractor shall attend all training required by the Bureau of Prisons for contract workers. The contractor will not be permitted to attend institution meetings, staff recalls or Government training sessions for institution staff.

Reviews: The Contracting Officer or designee is authorized to review by on-site survey, review of records, or by any other reasonable manner, the quality of supplies rendered under this contract. All records shall be subject to review by the Contracting Officer or other representative of the BOP.

Payments will be denied when such service does not support the charges or if the service is deemed not necessary or appropriate. Such determinations may be made by the Contracting Officer or COR, whichever is appropriate. All records shall be subject to review by the Contracting Officer or other delegated representatives of the BOP.

Contracting Officer Responsibility: Authority to negotiate changes in the terms, conditions, or amounts cited in this contract is reserved to the Contracting Officer. This responsibility may be delegated to an Administrative Contracting Officer by the Contracting Officer.

Contract Administration Office (CAO): The Contracting Office at FDC Philadelphia is assigned to be the CAO for a resultant contract. This assignment carries with it the authority to perform all normal contract administration functions as listed in FAR 42.302(a), items 1 through 70; to the extent those functions apply to this contract. This assignment also includes delegation of authority to perform functions specified in FAR 42.302(b), items 1 through 11.

15BFA025Q00000027 Page 10 of 53

Ordering Official: Task orders may be issued only by the Contracting Officer, Administrative Contracting Officer, or an ordering official for FDC Philadelphia with an appropriate certificate of appointment. Each task order will identify the services schedule for that period. Orders can be issued orally, by facsimile, mail, or electronic commerce methods. Task orders will take the form of a purchase request.

Contract Security/Investigative Requirements: The Contractor will not be subject to Government supervision, except for security related matters and monitoring of contract performance.

The following investigative procedures may be applied and appropriate forms completed before any Contractor employees are permitted inside an institution:

1. National Crime Information Center (NCIC) Check;

2. Declaration of Federal Employment (OF-306);

3. FD-258 (fingerprint check);

4. Law Enforcement Agency checks;

5. Vouchering of Employees;

6. Employment Resume;

7. Completed Contractor Pre-employment Questionnaire;

8. Release of Information;

9. Questionnaire for Sensitive Positions (SF-85for Low Risk, SF-85P for above low risk);

10. Credit Check, if applicable;

11.Urinalysis, if applicable.

In addition to the above procedures, Contractor employees must agree to undergo a urinalysis test (for the detection of marijuana and other drug usage). If a test result is positive, the individual(s) shall be excluded and the Contractor shall provide acceptable replacement personnel subject to the same security requirements. Before a quote can be considered for award, the Contractor must agree to submit to the all the above security requirements.

Statement of Equivalent Hires: The applicable fill in information for FAR 52.222-42, Statement of Equivalent Hires (May 2014) is as follows: Truckdriver, Heavy, Code 31363 - $27.88 plus benefits; Refuse Collector, Code 99730 - $22.78 plus benefits. As stated in the contract clause, this is for information purposes only.

Department of Labor Wage Determination: The applicable DOL Wage Determination for this procurement has been determined to be Wage Determination No. 2015-4233 Revision No. 30 Last Revision 07-22-2024. The current revision of the determination is attached for informational purposes.

Schedule of Insurance: In accordance with FAR 52.212-4(q), the Contractor shall comply with all applicable Federal, State, and local laws for the requirements of maintaining applicable insurance coverage.

15BFA025Q00000027 Page 11 of 53

Section 3 - Contract Clauses

A.1 ADDENDUM TO FAR 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services (Dec 2022)

The terms and conditions for the following clauses are hereby incorporated into this solicitation and resulting contract as an addendum to FAR clause 52.212-4.

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title Fill-ins (if applicable)

52.203-17 Contractor Employee Whistleblower Rights and

Requirement To Inform Employees of Whistleblower

Rights (Jun 2020)

52.204-13 System for Award Management Maintenance (Oct 2018)

52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services (Dec 2022)

52.228-5 Insurance-Work on a Government Installation (Jan

1997)

52.232-18 Availability of Funds (Apr 1984)

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors (Nov 2021)

52.242-13 Bankruptcy (July 1995)

Clauses By Full Text

52.216-18 Ordering (Aug 2020)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from the first day current option year through the last day of the current option year [insert dates].

15BFA025Q00000027 Page 12 of 53

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) A delivery order or task order is considered "issued" when--

(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;

(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or

(3) If sent electronically, the Government either--

(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or

(ii) Distributes the delivery order or task order via email to the Contractor's email address.

(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.

(End of clause)

52.216-19 Order Limitations (Oct 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than the deliverable as identified in Schedule of Services [insert dollar figure or quantity], the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor--

(1) Any order for a single item in excess of the estimated quantities in the Schedule of Items within the current option year [insert dollar figure or quantity];

(2) Any order for a combination of items in excess of the estimated quantities in the Schedule of Items within the current option year [insert dollar figure or quantity]; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

52.216-21 Requirements (Oct 1995)

(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated" or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause.

Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the

15BFA025Q00000027 Page 13 of 53

Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after the last day of the effective option year. [insert date].

(End of clause)

52.217-9 Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within prior to expiration of the current option year. [insert the period of time within which the Contracting Officer may exercise the option]; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days [60 days unless a different number of days is inserted] before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years (months)(years).

(End of clause)

52.232-19 Availability of Funds for the Next Fiscal Year (Apr 1984)

Funds are not presently available for performance under this contract beyond September 30 of the base year or any option year exercised. The Government's obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond September 30 of the base year or any option year exercised, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

2852.201-70 Contracting Officer's Representative (COR) (NOV 2020)

(a) Mr./Ms. Chris Wallace of FDC Philadelphia , ______________________________ , 215-521-4008 , is hereby designated to act as Contracting Officer's Representative (COR) under[Contract Number] , for the period of [Period] (specify the performance period of the contract that the designation covers).

(b) Performance of work under this contract is subject to the technical direction of the COR identified above, or another representative designated in writing by the Contracting Officer. The term “technical direction” includes, without limitation, the following:

(i) Receiving all deliverables;

15BFA025Q00000027 Page 14 of 53

(ii) Inspecting and accepting the supplies or services provided in accordance with the terms and conditions of this contract;

(iii) Clarifying, directing, or redirecting the contract effort, including shifting work between work areas and locations, filling in details, or otherwise serving to accomplish the contractual statement of work to ensure the work is accomplished satisfactorily;

(iv) Evaluating performance of the Contractor; and

(v) Certifying all invoices/vouchers for acceptance of the supplies or services furnished for payment.

(c) The COR does not have the authority to issue direction that:

(i) Constitutes a change of assignment or work outside the contract specification/work statement/scope of work.

(ii) Constitutes a change as defined in the clause entitled “Changes” or other similar contract term.

(iii) Causes, in any manner, an increase or decrease in the contract price or the time required for contract performance;

(iv) Causes, in any manner, any change in a term, condition, or specification or the work statement/scope of work of the contract;

(v) Causes, in any manner, any change or commitment that affects price, quality, quantity, delivery, or other term or condition of the contract or that, in any way, directs the contractor or its subcontractors to operate in conflict with the contract terms and conditions;

(vi) Interferes with the contractor's right to perform under the terms and conditions of the contract;

(vii) Directs, supervises, or otherwise controls the actions of the Contractor's employees or a Subcontractor's employees.

(d) The Contractor shall proceed promptly with performance resulting from the technical direction of the COR. If, in the opinion of the Contractor, any direction by the COR or the designated representative falls outside the authority of (b) above and/or within the limitations of (c) above, the Contractor shall immediately notify the Contracting Officer.

(e) Failure of the Contractor and Contracting Officer to agree that technical direction is within the scope of the contract is a dispute that shall be subject to the “Disputes” clause and/or other similar contract term.

(f) COR authority is not re-delegable.

(End of Clause)

2852.223-70 Unsafe Conditions Due to the Presence of Hazardous Material (NOV 2020)

(a) “Unsafe condition” as used in this clause means the actual or potential exposure of Contractor or Government employees to a hazardous material.

(b) “Hazardous Material” as used in this clause includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract), any other potentially hazardous material requiring safety controls, or any other material or working condition designated as hazardous by the Contracting Officer's Representative (COR).

(c) The Occupational Safety and Health Administration (OSHA) is responsible for issuing and administering regulations that require Contractors to apprise its employees of all hazards to which they may be exposed in the course of their employment; proper conditions and precautions for safe use and exposure; and related symptoms and emergency treatment in the event of exposure.

(d) Prior to commencement of work, Contractors are required to inspect for and report to the Contracting Officer the presence of, or suspected presence of, any unsafe condition including asbestos or other hazardous materials or working conditions in areas in which they will be working.

(e) If during the performance of the work under this contract, the Contractor or any of its employees, or subcontractor employees, discovers the existence of an unsafe condition, the Contractor shall immediately notify the Contracting Officer, or designee (with written notice provided not later than three (3) working days thereafter), of the existence of an unsafe condition. Such notice shall include the Contractor's recommendations for the protection and the safety of Government, Contractor and subcontractor personnel and property that may be exposed to the unsafe condition.

(f) When the Government receives notice of an unsafe condition from the Contractor, the parties will agree on a course of action to mitigate the effects of that condition and, if necessary, the contract will be amended. Failure to agree on a course of action will constitute a dispute under the Disputes clause of this contract.

(g) Nothing contained in this clause shall relieve the Contractor or subcontractors from complying with applicable Federal, State, and local laws, codes, ordinances and regulations (including the obtaining of licenses and permits) in connection with hazardous material including but not limited to the use, disturbance, or disposal of such material.

(End of Clause)

BOP 2852.237-72 DOJ CONTRACTOR RESIDENCY REQUIREMENT BUREAU OF PRISONS (JUNE 2004)

For three of the five years immediately prior to submission of an offer/bid/quote, or prior to performance under a contract or commitment, individuals or contractor employees providing services must have:

1. Legally resided in the United States (U.S.);

15BFA025Q00000027 Page 15 of 53

2. worked for the U.S. overseas in a Federal or military capacity; or

3. been a dependent of a Federal or military employee serving overseas.

If the individual is not a U.S. citizen, they must be from a country allied with the U.S. The following website provides current information regarding allied countries: http://www.opm.gov/employ/html/citizen.htm By signing this contract or commitment document, or by commencing performance, the contractor agrees to this restriction.

[End of Clause]

BOP 2852.242-71 EVALUATION OF CONTRACTOR PERFORMANCE UTILIZING CPARS (APR 2011)

The services, although not directly supervised, shall be reviewed by Federal Bureau of Prisons (BOP) staff to ensure contract compliance. The contractor's performance will be evaluated in accordance with FAR 42.15. Contract monitoring reports will be prepared by the Contacting Officer's Representative (COR) and maintained in the contract file.

In accordance with FAR 42.1502 and 42.1503, agencies shall prepare an evaluation of contractor performance and submit it to the Past Performance Information Retrieval System (PPIRS). The BOP utilizes the Department of Defense (DOD) web-based Contractor Performance Assessment Reporting System (CPARS) to provide contractor performance evaluations. The contractor shall provide and maintain a current e-mail address throughout the life of the contract. The contractor will receive an e-mail from the Focal Point thru the following website addresswebptsmh@navy.milwhen the contract is registered in CPARS. The e-mail will contain a "user ID" and temporary password to register in the CPARS system. The contractor must be registered to access and review its evaluation and/or provide a response. If assistance is required when registering, please contact the Contracting Staff/Focal Point.

(End of Clause)

DOJ-01 Whistleblower Information Distribution (Oct 2021)

Within 30 days of contract award, the contractor and its subcontractors must distribute the “Whistleblower Information for Employees of DOJ Contractors, Subcontractors, Grantees, or Sub-Grantees or Personal Services Contractors” (“Whistleblower Information”) document to their employees performing work in support of the products and services delivered under this contract (https://oig.justice.gov/sites/default/files/2020-04/NDAA-brochure.pdf). By agreeing to the terms and conditions of this contract, the prime contractor acknowledges receipt of this requirement, in accordance with 41 U.S.C. § 4712 and FAR

3.908 & 52.203-17, and commits to distribution. Within 45 days of award, the contractor must provide confirmation to the contracting officer verifying that it has distributed the whistleblower information as required.

(End of Clause)

DOJ-02 Contractor Privacy Requirements (JAN 2022)

A. Limiting Access to Privacy Act and Other Sensitive Information

(1) Privacy Act Information

In accordance with FAR 52.224-1 Privacy Act Notification (APR 1984) and FAR 52.224-2 Privacy Act (APR 1984), if this contract requires Contractor personnel to have access to information protected by the Privacy Act of 1974, the contractor is advised that the relevant DOJ system of records notices (SORNs) applicable to this Privacy Act information may be found at https://www.justice.gov/opcl/doj-systems-records.[1] Applicable SORNs published by other agencies may be accessed through those agencies’ websites or by searching the Federal Digital System (FDsys) available at http://www.gpo.gov/fdsys/. SORNs may be updated at any time.

(2) Prohibition on Performing Work Outside a Government Facility/Network/Equipment

Except where use of Contractor networks, IT, other equipment, or Workplace as a Service (WaaS) is specifically authorized within this contract, the Contractor shall perform all tasks on authorized Government networks, using Government-furnished IT and other equipment and/or WaaS and Government information shall remain within the confines of authorized Government networks at all times. Any handling of Government information on Contractor networks or IT must be approved by the Senior Component Official for Privacy of the component entering into this contract. Except where remote work is specifically authorized within this contract, the Contractor shall perform all

15BFA025Q00000027 Page 16 of 53 tasks described in this document at authorized Government facilities; the Contractor is prohibited from performing these tasks at or removing Government-furnished information to any other facility; and Government information shall remain within the confines of authorized Government facilities at all times. Contractors may only access classified materials on government furnished equipment in authorized government owned facilities regardless of remote work authorizations.

(3) Prior Approval Required to Hire Subcontractors

The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (Subcontractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any Subcontractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.

(4) Separation Checklist for Contractor Employees

The Contractor shall complete and submit an appropriate separation checklist to the Contracting Officer before any employee or Subcontractor employee terminates working on the contract. The Contractor must submit the separation checklist on or before the last day of employment or work on the contract. The separation checklist must verify: (1) return of any Government-furnished equipment; (2) return or proper disposition of personally identifiable information (PII)[2], in paper or electronic form, in the custody of the employee or Subcontractor employee including the sanitization of data on any computer systems or media as appropriate; and (3) termination of any technological access to the Contractor’s facilities or systems that would permit the terminated employee’s access to PII or other sensitive information.

In the event of adverse job actions resulting in the dismissal of a Contractor or Subcontractor employee before the separation checklist can be completed, the Prime Contractor must notify the Contracting Officer within 24 hours and confirm receipt of the notification. In the case the Contractor is unable to notify the Contracting Officer, then the Contractor should notify the Contract Officer’s Representative (COR).

Contractors must complete the separation checklist with the Contracting Officer or COR by returning all Government-furnished property including, but not limited to, computer equipment, media, credentials and passports, smart cards, mobile devices, Personal Identity Verification (PIV) cards, calling cards, and keys and terminating access to all user accounts and systems. Unless the Contracting Officer requests otherwise, the relevant Program Manager or other Key Personnel designated by the Contracting Officer or COR may facilitate the return of equipment.

B. Privacy Training, Safeguarding, and Remediation

(1) Required Security and Privacy Training for Contractors

The Contractor must ensure that all employees take appropriate privacy training, including Subcontractors who have access to PII as well as the creation, use, dissemination and/or destruction of PII at the outset of the employee’s work on the contract and every year thereafter. Training must include procedures on how to properly handle PII, including heightened security requirements for the transporting or transmission of sensitive PII, and reporting requirements for a suspected breach or loss of PII.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .