Salient Characteristics - Temperature Bath 1.pdf
PDF 111 KB Posted
- Attached to
- 7013 Temp Bath Federal contract opportunity
- Solicitation number
- FA442721QZ008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Temp Bath Sources Sought.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salient Characteristics for
60 MXS/MXMD
Power Measurement Calibration System Replacement
60 MXS / MXMD requires a replacement Fluke 7013-26 Dual Wet Well Temperature Bath or Hart Scientific 5309
The contractor shall provide the following:
Duel Wet Well Temperature Bath
- The Temperature Bath shall have sufficient space to accommodate several units under test, as well as a SPRT thermometer as a standard (2” diameter port or larger)
- The Temperature Bath shall have a minimum of 12” insertion depth
- The Temperature Bath shall have sufficient flow to generate a uniform temperature throughout the port, free of gradients to within .05 deg C
- The Temperature Bath shall have sufficient heating and cryogenic capacity to be able to reach and stabilize from ambient to 300 deg C in < 45 minutes, and from ambient to -100 deg C in < 90 minutes
- The Temperature Bath shall operate on 220VAC, 60 Hz single phase power
- The Temperature Bath shall be optimized for DOW 710, and Halocarbon 0.8 fluid
- The item shall have a warranty period of no less than 1 year (3-5 years highly desirable), which shall include repair/replacement of any defective components, or performance failure
- The item shall be furnished with any necessary accessories such as clamp stands, or ambient guards
- The replacement item shall be shipped to us ready for operation (after being filled with the appropriate heat transfer fluid)
- The Temperature Bath must ride on wheels or casters to facilitate relocation
- The Temperature Bath must be settable to 2 decimal places (C or F)
- IEEE-488 and RS-232 communication/control capability is highly desirable
Special Requirements:
- The replacement item shall be safely and securely packaged, and shipped to the 60th Maintenance Squadron via traceable mean in a timely manner once the contract is awarded. The time between contract award, and delivery of the item shall not exceed 145 days.