S02. Statement of Bid Items.pdf
PDF 118 KB Posted
- Attached to
- Y1DA--Replace Second Floor Flooring Federal contract opportunity
- Solicitation number
- 36C25021B0035_1
About this file
This memorandum outlines bid items for a federal contract to replace flooring at a Veterans Affairs medical center. The base bid item involves removing and replacing approximately 7,300 square feet of second floor corridor flooring and base at the main Medical Center building over 133 days. The work includes general trades as well as approximately 2,090 square feet of hazardous material abatement, and must be performed during evenings and weekends to avoid disrupting medical center operations. The related solicitation was amended to remove alternate bid items and update the base bid item scope and pricing terms, with the bid response deadline remaining August 17, 2021. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is the contracting agency for the second floor flooring replacement project at the specified medical center location.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02. Solicitation 36C25021B0035_1 Update.pdf | ||
| S06. 36C25021B0035 0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Memorandum Veterans Affairs
Date: May 10, 2021
From: Chief, Engineering Service 138 (A)
Subj: Bid Items Replace Second Floor Flooring #541-21-201
To: Network Contracting Activity 10 (NCO10) Attn: Stanley Burdine – Administrative Contracting Officer
Bid Items
Bid Item 1: Base Bid
Description:
This is a multi-phased project that will remove and replace approximately 7,300 square foot of corridor flooring and base on the Second Floor of the main Medical Center. Work includes General trades; no Mechanical or Electrical scope is required. Approximately 2,090 square foot of hazardous material abatement is included in the scope. Work includes all labor, material, equipment and supervision to perform the required construction work on this Project. All work to be done during evenings and weekends.
Duration: 133 days
Glen Zeisset
COR