S02 - Combined Synopsis - Perry CBOC.pdf

PDF 646 KB Posted

Attached to
S201--FY21: Perry Janitorial Service Federal contract opportunity
Solicitation number
36C24820Q1426
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

View the file

Other files for this federal contract opportunity

Other files attached to S201--FY21: Perry Janitorial Service, newest first.
File Type Posted
36C24820Q1426_2.docx DOCX document
36C24820Q1426.docx DOCX document
Attachment B-1 - Cost Price Schedule.pdf PDF
Attachment D-1 - Perry CBOC Floor Plan_Redacted.pdf PDF
Attachment D2 - Wage Determination.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMBINED SYNOPSIS/SOLICITATION RFQ 36C24820Q1426

General Information

Action Code:

Document Type:

RFQ Number:

Posted Date:

Response Date:

Classification Code:

Set Aside:

NAICS Code:

Contracting Office Address

NCO 8

ATTN: James Blue

300 E. University Ave. STE 180

Gainesville, FL 32601-3460

Description

Combined Synopsis Solicitation

RFQ

36C24820Q1426

09/23/2020 by 4:30PM

S201

Service-Disabled Veteran Owned

Small Business 561720

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in

FAR Subpart 12.6 in conjunction with Part 13, as supplemented with additional information included in this notice. This procurement is being conducted under Subpart 13.5 Simplified Procedures for Certain

Commercial items. This announcement constitutes the only solicitation for this action. Quotes are being requested, and a written solicitation will not be issued.

This solicitation is issued as a Request for Quote (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2020-08 effective

08/13/2020.

The Network Contracting Office 8-RPO East intends to award a firm fixed priced contract with four option periods for Janitorial Services in accordance with the below Performance Work Statement (PWS) and attached Price Schedule.

The associated North American Industrial Classification System (NAICS) code for this procurement is

561720 – Janitorial Services with a small business size standard of $19.5 million.

Prospective offerors shall be a registered in the System for Award Management (SAM) at http://www.sam.gov to be considered for an award of a federal contract, and registration shall be complete and not missing elements such as representations and certifications.

For evaluation purposes, to be considered as a Service Disabled Veteran Owned Small Business

(SDVOSB), prospective offerors shall be a verified SDVOSB in the VA Center for Verification and

Evaluation (CVE) Veteran Information Pages (VIP) pages https://www.vip.vetbiz.gov/ at the date and time set for receipt of offers.

08/28/2020 http://www.sam.gov/ http://www.sam.gov/ http://www.vip.vetbiz.gov/

SITE VISIT: A Site Visit will be conducted at the Perry CBOC, located at 1224 N. Peacock Ave.

Perry, FL 32347 on Tuesday, 09/08/2020 at 11:30 a.m. This Site Visit is not mandatory but is highly encouraged. All potential contractors must ensure all personnel who are planning on attending the Site

Visit must utilize Personal Protective Equipment to reduce the spread of COVID-19. Any personnel who are experiencing COVID symptoms should NOT attend the Site Visit.

VENDOR QUESTIONS: All questions regarding this RFQ must be in writing and may be sent by e‐ mail to james.blue3@va.gov. Questions must be received no later than Thursday, 09/10/2020 by 4:00

PM Eastern. No further questions will be accepted after that date and time.

ANSWERS TO VENDOR QUESTIONS: Answers to vendor questions will be posted on Contract

Opportunities no later than Wednesday, 09/16/2020 by 4:00 PM Eastern.

You are reminded that representatives from your company SHALL NOT contact any Malcom Randall

VA Health Care System staff to discuss this RFQ during this RFQ process. All questions and concerns regarding this RFQ shall be directed to James Blue, the Contracting Officer.

QUOTE SUBMISSION: Offers are due on/or before Wednesday, 09/23/2020 by 4:30 PM

Eastern. Quotes shall be sent by e‐mail “only” to the Contracting Officer (James Blue) at james.blue3@va.gov. The Government will award a Firm Fixed Priced (FFP) contract resulting from this RFQ to the responsible vendor whose quote is Technically Acceptable and whose quote offers the best value to the Government utilizing the comparative evaluation procedures IAW FAR 13.106-2 (3).

Quotes shall include:

(1) Technical/Management Approach: The Technical/Management Subfactors will be evaluated and rated either Acceptable or Unacceptable. For a quotation to be rated overall Technically

Acceptable, each of the following subfactors must be rated Acceptable.

a. Subfactor 1: Briefly provide a plan for furnishing all labor, services, and equipment to deliver the services listed in the Performance Work Statement.

(2) Past Performance: Vendors may provide up to 3 references for projects in similar size and scope to include Contract/Project Name, Location, Start/Stop Date, Scope of Project, and Name and Phone Number of Reference.

(3) Price: Vendors shall quote prices for required services listed in the Statement of Work by completing all pricing in attached Price Schedule. The completed Price Schedule must be submitted with the offerors final quote.

mailto:james.blue3@va.gov mailto:james.blue3@va.gov

36C24820Q1426

Table of Contents

SECTION A

A.1 COMBINED SYNOPSIS/SOLICITATION

SECTION B - CONTINUATION OF COMBINED SYNOPSYS/SOLICITATION

B.1 CONTRACT ADMINISTRATION DATA

B.2 PERFORMANCE WORK STATEMENT

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT

2018)

C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) ... 30

C.4 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA

ACQUISITION OF COMMERCIAL ITEMS (APR 2020)

C.5 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND

COMPLIANCE (JUL 2018)

C.6 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

C.7 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JUN 2020)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

SECTION E - SOLICITATION PROVISIONS

E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (OCT 2018)

E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (DEC 2019)

E.3 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

E.4 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)

E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—

COMMERCIAL ITEMS (JUN 2020)

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C248

Department of Veterans Affairs

Network Contracting Office 8 (NCO 8)

Commerce Building

300 E. University Ave. Ste. 180

Gainesville FL 32601-3460

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or

[X] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually []

c. Other [x] Monthly

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment

Requests.

Department of Veterans Affairs

Financial Services Center

P.O. Box 149971

Austin TX 78714-9971

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

B.2 PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

JANITORIAL SERVICES

Section 1: General Information

1.1 General: This is a non-personal services contract to provide janitorial services for the VA facility locations specified in section 1.3. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.2 Period of Performance: Base Year of October 01, 2020 thru September 30, 2021 and Four (4), One (1) year option periods.

1.3 Place of Performance:

Office Information Location Size

Perry CBOC 1224 N. Peacock Ave.

Perry, Fl 32347

Approximately 1,586sq. ft.

1.4 Hours of Operation The work required by the contract shall be performed daily, 5 days a week, excluding Federal Holidays. Work shall begin between the hours of 8:00 a.m. and 4:30p.m., all work must be completed within normal operational hours. Any work needed outside these hours must be coronated within 2 business days prior with the COR. other times may be scheduled for floor projects

(see each line item for specific times required). Contractor shall provide proposed work schedule to the

Contracting Officer’s Technical Representative (COR) within ten (10) calendar days from receipt of

Award. National holidays: The ten holidays observed by Federal Government are:

New Year’s Day January 1

Martin Luther King DayThird Monday in January

Presidents’ Day Third Monday in February

Memorial Day Last Monday in May

Independence Day July 4

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans’ Day November 11

Thanksgiving Day Fourth Thursday in November

Christmas Day December 25

When one of the above designated legal holidays falls on a Sunday, the following Monday shall be observed as a legal holiday by U.S. Government agencies. When a legal holiday falls on a Saturday, the preceding Friday shall be observed as a holiday by U.S. Government agencies.

1.5 Work Schedule: Prior to commencing performance under this contract, the Contractor shall provide a proposed work schedule to the COR describing how services will be accomplished. All work shall be coordinated with the COR or designated representative when accomplished during normal business hours to avoid disruptions or conflicts between the Government functions and the provision of service under this contract.

1.7 Type of Contract: The government will award a Firm Fixed Price contract.

1.8 Contract Changes: Additional cleaning required by changes in mission assignments must be documented by a written contract modification. If the contractor receives a request from VA personnel directing or requesting work that the contractor believes is not within the terms of the PWS or the contract, then the contractor must notify the Contracting Officer Representative (COR) and the

Contracting Officer of the request. The only person that has the authority to modify the terms of the contract or request work for which compensation will be provided is a Contracting Officer.

1.9 Invoicing: All invoices from the contractor shall be submitted electronically in accordance with

VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

VA’s Electronic Invoice Presentment and Payment System – The FSC uses a third-party contractor, Tungsten, to transition vendors from paper to electronic invoice submission. Please go to this website:

http://www.tungsten-network.com/US/en/veterans-affairs/ to begin submitting electronic invoices, free of charge.

More information on the VA Financial Services Center is available at http://www.fsc.va.gov/einvoice.asp.

Section 2: Definitions & Acronyms

2.1 Definitions:

Aseptic Cleaning. Techniques and procedures used under sterile conditions. Aseptic cleaning is the effort taken to clean the interior of building and keep people free from hospital micro-organisms.

Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

Contracting Officer (CO). A person with the authority to enter into, administers, and/or terminates contracts and makes related findings. The Contracting Officer is the only individual who has the authority to contractually bind the Government. The Contracting Officer may designate a Government employee to act as his authorized technical representative.

Contracting Officer Representative (COR). The person has been designated as the authorized representative of the Contracting Officer acting within the limits of his/her authority. This individual shall not be authorized to award, agree to, or sign any contract or modification thereto, or in any way to obligate the payment of money by the Government. The COR advises the Contracting Officer on matters relating to this contract, verifies completion of the work, certifies invoices related to completed work, and ensures compliance with all provisions of the contract.

Corrective Action. Action taken by the Contractor to correct a deficiency and identify the cause(s) of the deficiency.

http://www.tungsten-network.com/US/en/veterans-affairs/ http://www.fsc.va.gov/einvoice.asp

Custodial Cleaning. Providing an array of cleaning functions that are vital to the daily operation of the facility so as to present a clean facility.

Joint Commission (JC). A national organization dedicated to improving the care, safety, and treatment of patients in health care facilities, and publishers of the Joint Commission on Accreditation Manuals.

Protection. This is preventing damages to surfaces and equipment caused by normal use or improper cleaning procedures.

Quiet Zone. Means normally a noise level of less than 72.B (A) at five feet from the source in patient-occupied areas.

Soil. Dust, dirt, stains, grease, smudges, streaks, spots, lint, odors, organisms, vomits, or any agents that is injurious to health. Soil can be visible such as dust, or can be invisible such as organisms, and odors.

Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

Work Day. The number of hours per day the Contractor provides services in accordance with the contract.

2.2 Acronyms:

CBI Compliance and Business Integrity

CEH Certified Executive Housekeeper

COR Contracting Officer Representative

EPA Environmental Protection Agency

ID Identification

IT Information Technology

JC Joint Commission

IHEA International Executive Housekeeper Association

NEHA National Executive Housekeeping Association

OSHA Occupational Safety and Health Agency

PWS Performance Work Statement

QASP Quality Assurance Surveillance Plan

VA Veterans Affairs

Section 3: Government Furnished Property, Equipment, and Services.

3.1 All equipment, material and supplies shall be furnished by the contractor.

The Contractor shall comply with applicable Federal, State, and local safety and fire regulations and codes. The Contractor shall keep abreast of and comply with changes in these regulations and codes applicable to the contract. Any and all materials and equipment used in performance of this contract will be removed from the facility or stored properly at the end of the workday and secured during the workday. If there is not adequate space to store all equipment on site, the contractor will be responsible for bringing equipment to and from the facility.

Section 4: Contractor Furnished Items and Services

4.1 Unless otherwise indicated or specified, the Contractor shall furnish at their own expense all labor, materials, supplies, machinery, and appliances that may be necessary or appropriate in the performance of this contract. This includes furnishing restroom supplies such as toilet tissue, multifold paper towels, and antimicrobial soap. The Contractor shall also furnish plastic linings for all receptacles that are to be changed daily. These items must comply with 52.208-9 “Contractor Use of Mandatory Sources of Supply of Services”.

NOTE: The COR has the authority to approve all supplies for use and Safety Data Sheet (SDS) sheets are required to be given to the COR upon request.

4.2 Soap dispensers shall not be of the refillable type, where topping off of a dispenser reservoir is done from a larger bulk container. Soap dispensers will be of the design that refills come in disposable bags. Soap should be an antimicrobial soap of the same type currently used in the NF/SG hospitals since it has been vetted by Infection Control and has proven user acceptance. Variations in product selection should be approved by Infection Control at the Gainesville or Lake City facility. Literature on the antimicrobial hand soap used at this facility and throughout the clinics will be provided upon request.

4.3 Contractor shall be responsible for ensuring all equipment, tools, and supplies used meet the necessary safety requirements and employees have full working knowledge of their use.

Section 5: Specific Tasks

Standards: Aseptic areas apply to the kitchen, dining, and restrooms. Custodial standards apply to the common areas, excluding the dining area, and the rooms. There may some cases where a room requires a

“terminal cleaning” in the case of a sick patient or otherwise. Upon request from VA staff, the contractor shall perform a terminal clean to affected areas.

5.1 Tasks and Cleaning Standards

The following table summarizes the tasks required under this PWS.

Tasks Frequency

1. Empty waste cans and reline Daily

2. Place furniture in proper locations Daily

3. Spot clean/wash interior windows and door glass Daily

4. Dust mop/wet mop all tile floors Daily

5. Clean public restrooms Daily

6. Check and Refill all paper towel, toilet paper, and soap dispensers Daily

7. Clean and organize all housekeeping closets Daily

8. Clean/sanitize all bathrooms utilizing a germicidal disinfectant Daily

9. Buff all VCT floors Weekly/as needed

10. Dust all horizontal and vertical surfaces Daily

11. Spot clean furniture As needed

12. Spot clean waste cans As needed

13. Empty Recycling Containers As needed

14. Wash walls and doors As needed

15. Vacuum carpets, entrance mats, and runners Daily

16. Polish all stainless steel Weekly

17. Strip and refinish all tile floors 2 times a year/as needed

18. Shampoo/extract carpets utilizing soil retardant Monthly/as needed

19. Interior and Exterior of windows and doors on first floor level. Daily/ spot clean as needed

20. Hard surfaces Daily/ as needed

21. Change curtains Semi-annually or as needed

22. Unoccupied room cleaning Weekly

1. Carpet Maintenance: Vacuum all carpeted areas in the corridors, elevators, offices, group rooms and public areas. Furniture shall be moved for thorough cleaning and replace the furniture after cleaning. Spot cleaning as required so that the carpet presents a uniform and clean appearance, free of spots and stains. The Contractor shall report any tears, burns and raveling to the attention of the COR or designated representative.

a) Light Shampoo to protect carpet with soil-repellent and/or static free application of treatment as required.

b) Deep Steam Clean by using “steam” or other residue-free cleaning product. The carpet shall be dried to the touch upon completion.

2. Door and Doorjambs: Perform spot cleaning by damp-wiping and polishing unpainted metal doors, washable surfaces of walls, partitions, doors and fixtures, and handrails. Sanitize as needed.

3. Ducts, Light Fixtures, Vents and Louvers: These areas are to be cleaned and vacuumed. The ducts shall be cleaned as needed.

4. Elevators: The Contractor shall clean all interior surfaces, including doors, metal thresholds, tracks, fans. Spot-clean walls.

5. Entrance Area: Sweep landing, steps, sidewalk of front entrance area, clean the walk-off mats, hose off as required, and remove standing water. The Contractor shall damp-mop the entrance and lobby floors during inclement weather. Trash containers located inside and outside of entrances shall be emptied.

6. Floor maintenance (non-carpeted):

a) Hard Surface Floor Maintenance: Stripping and refinishing of all VCT flooring will be performed 2X a year or every 6 months. A minimum of 4 coats of wax will be applied. In between the semi-annual stripping/refinishing process, all VCTs will be scrubbed and recoated to maintain a standard uniform glossy appearance. This process is typically less labor intensive (about half the time that of the stripping process) and should be scheduled quarterly or as required by the COR. A non-skid wax is required. A uniform glossy appearance is free of scuffmarks, heel marks, wax build-up, and other stains and discoloration

(dirt should not be visible underneath the wax/finish and corners free of dirt/debris). When floors are stripped, baseboards and doors should remain clean always. Floors should be burnished in between recoats or as needed. Contractor will be responsible for moving furniture out of the area being resurfaced and back when the job is completed. The scheduling of this task will be coordinated between the Contractor CEH, COR and staff occupying building to ensure there is no disruption to staff and visitors.

b) The Contractor shall wet-mop and scrubs using germicidal type detergent to sanitize all accessible areas including corners and abutments. The Contractor shall remove any splash marks or mop streaks on furniture, walls, baseboards, etc., or mop strands remaining in the area. The Contractor shall not mop wood or carpeted floors. The Contractor shall change water in mop bucket in between room cleanings.

c) The Contractor shall sweep, dust, and damp mop hard-surfaces, resilient flooring to include normal traffic areas, group rooms, and restrooms. The floors shall be swept, dusted and damp mop using a treated or dust- free method/mop. The Contractor shall ensure that the cleaning includes the corners and abutments. The Contractor shall tilt or move chairs, trash receptacles, and other easily movable items so as to clean underneath and shall return items to their proper position.

d) The Contractor shall buff all floors accessible to floor machine unless specified elsewhere as having carpet or special flooring. The Contractor shall apply a uniform coating of non-skid floor finish to protect and restore gloss or sheen. The Contractor shall remove excess floor finish solutions. The Contractor shall apply these techniques only to the portion of the floor needing work, to bring the entire floor up to standard.

7. Furniture and Flat Surface Cleaning: (Low Dusting refers to areas 36” and below) The Contractor shall dust all uncluttered horizontal surfaces within reach with a treated dust cloth (i.e., desks, counters, file cabinets, ledges, bookcases, tables, credenzas, window sills, etc.). The Contractor shall dust vertical surfaces and underneath desks in such a manner as to prevent airborne dust.

a) The Contractor shall dust furniture items such as chairs, file cabinets and other types of office furniture. The Contractor shall damp-dust other office furniture such as vinyl chairs, lamps, telephones, furniture bases, picture frames. The Contractor shall not dust typewriters, computers, business machines and equipment of similar nature.

b) Furniture and Flat Surfaces Cleaning (High Dusting refers to areas higher than 36” up to

70”): High dusting includes all the wall surfaces, door frames, shelves, equipment, window sills, ledges, hand rails, etc. that are 70 inches from the floor or more.

8. Furniture: The Contractor shall vacuum upholstered furniture; clean behind furniture and corners, in particular. Move items as necessary to ensure thorough and adequate cleaning; replace to original position.

a) The Contractor shall spot clean upholstered furniture as required.

b) The Contractor shall steam clean or deep-clean upholstered furniture as required.

9. Doors (Entrance areas): The Contractor shall clean all glass partitions, interior and exterior glass doors, display cases, directory boards, and draft shields on windows, mirrors and adjacent trim.

10. Stairwells: The Contractor shall sweep, dust and damp mop as needed. Lamps, vents, ceiling and wall areas shall be free of cobwebs, dust, debris and insects.

11. Walls: Spot/Clean/Wash. The Contractor shall spot-clean wall surfaces to remove cobwebs, fingerprints, smudges. The Contractor shall sanitize the walls as needed.

12. Venetian Blinds: The Contractor shall vacuum and damp clean all blinds to remove surface dust, vacuum drapes in place.

13. Window Cleaning Interior: The Contractor shall wash all windows on interior surfaces, damp-wipe window sashes/sills. The contractor is not responsible for the highest interior windows.

14. Dining room, kitchen, and break areas: The contractor shall clean dining room, kitchen, and break areas daily; trash is to be removed as needed. All tables and counter tops are to be wiped down daily and as needed throughout day. All kitchen appliances, refrigerators, microwave oven, conventional oven, dishwasher, etc. are to be cleaned daily and as needed. The contractor is to work with staff to schedule cleaning of refrigerator.

15. Information Technology (IT) Closets: The Contractor shall coordinate with the VA IT staff to gain access to these secured areas in order to sweep and dust mop floors monthly. The Contractor shall not use any type of liquids, vacuums or duster in these closets. The Contractor shall not unplug any IT equipment unless performed by IT staff. To maintain the proper air temperatures in the IT rooms, the entry doors shall not be left open.

16. Ceilings: The Contractor shall dust and remove cobwebs from the ceilings, vents and light fixtures.

17. Unoccupied Rooms: Cleaning of unoccupied rooms should be performed weekly to remove dust from all surfaces, the restroom should be cleaned and the commode flushed to prevent hard water deposits.

18. Miscellaneous

a) Water Fountains: The Contractor shall empty, rinse and sanitize drinking fountains, water coolers, the hot/cold water dispensers with a germicidal type detergent. The Contractor shall re-stock those water coolers with cups.

b) Polish Metal. The Contractor shall polish the brass and other metal, aluminum, stainless steel hardware on doors, push bars, and the kicking plates.

19. Restrooms

a) The Contractor shall clean and sanitize sinks, urinals, and toilets.

b) The floor traps shall be maintained free from odor at all times.

c) The Contractor shall sweep and wet-mop the floors daily and spray buff as required. The

Contractor shall apply a uniform coating of non-skid floor finish. The Contractor shall remove any excess floor finish solutions.

d) The Contractor shall damp-wipe walls, doors, partitions, mirrors, shelving, and window frames and sills. The Contractor shall use an approved germicide/detergent in restrooms to disinfect all surfaces of partitions, stalls, faces of toilet bowls, urinals, lavatories, showers, dispensers, and other such surfaces.

e) The Contractor shall damp-wipe and polishes the chrome fixtures.

f) The Contractor shall clean (descale) toilet bowls and urinals.

g) The Contractor shall furnish and replenish restroom supplies for example: soap dispensers, paper towels, toilet tissue and sanitary napkins. The Contractor shall ensure sufficient supplies are provided.

h) The Contractor shall empty, clean, disinfect, and re-line all sanitary napkin and all waste receptacles.

20. Waste

a) On a daily basis, all trash containers throughout the facility shall be emptied and returned to their original locations. Boxes, cans, paper placed near a trash receptacle and marked

“TRASH” shall be removed. All trash containers, waste baskets, etc. shall be fitted with a biodegradable disposable plastic liner. All plastic liners for trash receptacles of any sort shall be replaced with new ones when receptacle is emptied. The trash shall be deposited in the nearest outside trash collection container as directed by the COR. Trash receptacles shall be left clean, free of foreign matter, and free of odors. The Contractor shall change out sharps containers in exam rooms, medication rooms, or any other designated area when 2/3 full and place sharps container(s) in soiled utility room for scheduled pick-up.Litter Removal: The

Contractor shall pick up and dispose of litter and trash from the entrances and perimeter of the building.

b) ‘Red Bag’ Bio-hazardous: All receptacles lined with "Red Bags" (plastic bags containing bio-hazardous medical waste material) shall be serviced. The Contractor shall pick up the Red

Bag waste and deposit it in specially designated, locked "infectious waste" bins or lockers, usually located at the rear of the facility, in a safe and timely manner, and in accordance with established standards and procedures. NOTE: Red Bags may not be used for any other purpose.

21. Supplies:

a) Contractor shall ensure examination rooms/restrooms are stocked sufficiently so that supplies including soap for the soap dispensers, paper towels, and toilet paper are not depleted. Supplies shall be stored in designated areas and shall be kept up off the floor.

If supplies run out prior to the next service date, contractor shall refill within 24 hours of notification.

b) Soap dispensers shall not be of the refillable type, where topping off of a dispenser reservoir is done from a larger bulk container. Soap dispensers will be of the design that refills come in disposable bags. Soap should be an antimicrobial soap of the same type currently used in the NF/SG hospitals since it has been vetted by Infection Control and has proven user acceptance. Variations in product selection should be approved by

Infection Control at the Gainesville or Lake City facility. Literature on the antimicrobial hand soap used at this facility and throughout the clinics will be provided upon request.

5.2 Contractor Personnel

1. The Contractor shall assign an International Executive Housekeeper Association (IHEA)

Certified Executive Housekeeper (CEH) to supervise and train the contracted personnel. The supervisor shall develop and evaluate the environmental sanitation procedures in order to insure compliance with all provisions contained in this contract.

2. The CEH shall have at least one (1) year of prior experience as a CEH Manager within the last three years. Written certification of experience and copies of any formal training program (i.e.

National Executive Housekeeping Association (NEHA) shall be submitted to the COR before starting work. The COR’s approval must be received prior to an employee working at any of the facilities.

3. The CEH or stand-in representative shall be available during normal duty hours to respond by telephone within thirty (30) minutes of notification by the COR and shall be available to meet with COR or designated representative within 2 hours after notification to discuss problems areas.

After normal duty hours, the CEH or stand-in representative shall be available within 3 hours.

4. The contractor’s employees shall be fluent in English and shall be able to read, write, speak, understand and communicate effectively in English.

5. Prior to beginning performance under this contract, the Contractor shall provide the following:

a) List of employees who will provide services under this contract

b) Name, telephone number and address of the CEH

c) List of shift supervisors

6. The Contractor shall notify the COR in writing whenever there is a change of personnel appointed to fulfill supervisory or shift leader function or when there is a planned absence of key personnel. The CEH shall, in the absence of the Contractor, act as the Contractor Representative.

He/she shall have full authority to act for the Contractor on all matters relating to daily operations of this contract.

7. The Contractor shall not consume food, snacks, drinks or tobacco products except during specified break periods in appropriate designated break areas only.

8. The Contractor is responsible for compliance with all appropriate Joint Commission record keeping requirements.

9. The Contractor shall also be responsible for adhering to all requirements under the Privacy Act due to the possibility that confidential medical record information may be accessible and/or visible to contractor employees during performance of their daily duties. The Contractor shall obtain a signed “Confidentiality Certificate” from each employee prior to allowing them to start work under this contract. The contractor shall keep a copy of confidentiality certificate on site for inspection purposes.

10. The Contractor is not required to have physical examination prior to work on this contract;

however, the Contractor is expected to be in good physical health and able to work in patient care areas without risk to the patients. The Contractor shall not be assigned to this contract if not in good physical health or pose a risk to patients. The Contractor who acquires a communicable illness shall not perform service under the contract and shall be free of illness before returning to work.

5.3 Safety Training Requirements

1. The Contractor shall consider the clinical environment and instruct his/her employees on applicable safety precautions and special requirements. These requirements may include, but are not limited to, such conditions as cleaning of human excretions, blood, vomit, etc., from both floors and walls. The contractor shall maintain acceptable sanitation standards in accordance with standard commercial practice. Daily handling of known infectious materials, knowledge of aseptic techniques as related to working in this type of environment or any careless handling of this type of material could be a source of infection for patients and personnel.

2. Handling of Infectious Medical Waste (“Red Bag” Waste and “Sharps” Containers):

3. The Contractor may be required to collect bio-hazardous “Red Bags” waste (double-bagged) and solid, enclosed “SHARPS” containers from the medical facility exam and treatment rooms, and to deposit the bags and containers in designated bio-hazardous waste container. The Contractor shall maintain records on employee training and shall notify the COR appointed under this contract, as to when new annual training is required. The Contractor shall provide a certification of annual training for each employee.

4. To ensure competent and safe performance of the work under this contract, the Contractor shall provide appropriate training to employees prior to the beginning of service under this contract. This includes any OSHA or specific SDS instructions for chemicals, etc., use in performance of the contract.

5.4 Contractor’s Attire and Identification

1. The Contractor shall wear a standard custodial type uniform which is easily recognizable and clearly distinguish them as the “Contractor.” Uniforms shall present a neat, distinctive appearance; shall be clean and maintained in good repair; and shall be worn as designed by the manufacturer. Standard custodial type uniform is defined as collared work short (button-down or polo style) and pants or skirt of twill or similar material (no denim). The Contractor shall wear appropriate footwear that will cover the entire foot for safety purposes.

2. Identification Tags/Cards. The Contractor shall wear on the front of the uniform, clearly readable name identification (ID) logo identifying the contractor’s and employee’s name. The

Government will issue ID cards to the Contractor after background checks have been completed.

The Contractor shall obtain “Visitors’ Badges” during the interim period via VA Police or Human

Resource Department.

3. In special sanitation and/or “isolation” situations, the Contractor may be required to wear special protective clothing and shoe covers, which will be supplied by the medical facility. Such items are to remain the property of the Government and shall not be removed from the premises of the medical facility. They will be received, worn, and turned in or disposed of as directed by the

COR. All other safety or protective clothing or equipment shall be provided and maintained by the Contractor at the Contractor’s own expense.

4. Contractor’s Personal Hygiene: The Contractor’s attire and presentation shall be appropriate per industry standard.

5.5 Contractor Training

1. Contractor personnel shall not be assigned to work until they have completed initial orientation and required training as indicated below under item 5.5.2. Exception: An exception will be made during the first sixty (60) days of contract performance, whereby Contractor’s employees who have had general janitorial and OSHA training will be permitted to start work at the VA medical facilities, on the condition that the training specified herein shall be completed within sixty (60) days after contract effective date. The Contractor shall provide an initial training plan to the COR for approval. The initial plan shall include topics, brief statement of content and method of training. Documentation verifying the content of such training and orientation shall be transmitted to the COR.

2. Minimum Contractor-Furnished Training: Initial training shall cover the topics listed below. The

Contractor shall accomplish the training within 5 work days.

a) General orientation of basic bacteriological concepts, including the basics of how disease is caused and transmitted, how it can be prevented, reduced or contained through proper environmental sanitation methods.

b) Infection control orientation, relating duty functions to the technical provision of this specification.

c) Proper use and handling of germicidal detergents, supplies and equipment.

d) Care and maintenance of Contractor and Government-furnished property.

e) Familiarization with local fire preventing and safety procedures.

f) Familiarization with applicable facility polices/regulations and their effect on sanitation

Services.

g) Familiarization with the Contractors procedures manual.

h) Individual duties and responsibilities.

i) Procedures for replenishing cleaning supplies and obtaining equipment repair.

j) Role of Contractor’s personnel in the facility and their impact on patient care

k) Techniques/methods for measuring quality of work performance

l) Basic orientation to the facility, function, mission, goals

m) Facility emergency fire and disaster program

n) Hazardous Communication Standard

o) Utility Operation

p) Standard Precautions

q) Emergency Preparedness

r) Body Mechanics/Lifting

s) Accident Reporting

t) Sexual Harassment

u) Ethics

v) TB-Precautions (PPD Hep B)

w) Mercury/Spills

x) Chemo Waste Handling

y) Linen exchange services, including proper handling and care of all linens.

3. Compliance and Business Integrity (CBI) Awareness Training: The Contractor shall complete initial compliance awareness training within thirty (30) days of contract award effective date.

The Contractor shall also meet the annual compliance awareness refresher training.

4. Remedial Training: When notified, the Contractor shall complete remedial training and education to address any detected compliance issues.

5. Proof of Training: The Contractor shall submit proof of training by providing a copy of the training to the COR or designated representative. The COR will retain proof of training in accordance with applicable Records Control Schedule.

5.6 Contractor’s Quality Control Plan

1. The Contractor shall establish and maintain a complete quality control program to ensure the requirements of the contract are met. One copy of the Contractor’s basic Quality Control

Program shall be provided to the COR 15 days after contract award effective date. An updated copy shall be provided the COR as changes occur. The quality control program shall include, but are not be limited to the following:

a) An inspection system covering the required services. The plan shall specify the areas to be inspected on either a scheduled or unscheduled basis and how often inspections shall be accomplished.

b) The plan shall provide methods for identifying and preventing deficiencies and how the

Contractor shall prevent the level of performance from becoming unacceptable.

c) On-site records of all inspections conducted by the Contractor and necessary corrective action taken.

d) A system to record all inspections conducted by the Contractor and record corrective action.

These documents shall be made available to the COR or designated representative during the term of the contract.

5.7 Fire Prevention and Emergency Procedures

1. The Contractor shall take such safety precautions as necessary to protect the lives and health of occupants of the buildings.

2. Any hazardous incidents created by the Contractor shall be corrected immediately.

3. The Contractor shall comply with applicable Federal, State, Local and facility safety and fire regulations and codes which are in effect at the beginning of the contract period. The Contractor shall keep abreast of and comply with changes in these regulations and codes applicable to the contract.

4. The Contractor shall follow applicable facility policies concerning fire and/or disaster events.

5. Posting Warning Signs: The Contractor shall display approved warning devices in all areas where operations may cause traffic obstruction or personnel hazard. The cleaning of lobbies and corridors, resulting in a temporary wet or slippery floor surface, shall be, appropriately posted with signs and shall be accomplished so that it will not be necessary for personnel or patients to cross the wet surface to gain access to other areas.

5.8 Building Security and Keys

1. The Contractor shall be responsible for safeguarding all Government property provided for the

Contractor’s use. At the close of each work period, Government facilities, equipment and materials shall be secured.

2. The Government shall provide the Contractor with keys to access the required rooms. Access to restricted areas shall be provided to the Contractor by prior arrangements with the COR. With the exception of keys issued to CEH, keys provided to other Contractor personnel shall not be removed from the premises. Keys shall not be duplicated or issued to any other individuals. All keys not issued for the performance of work being accomplished at the present time shall be secured or returned. The COR or designated representative will perform an inventory of keys assigned to the Contractor at the end of the contract period or as needed. Any keys lost by the

Contractor will be replaced by the Government, and the Contractor shall be charged the replacement value of the lost key. The Contractor shall also be responsible for any expense incurred for re-keying of the Facility caused by the lost key. The Contractor shall notify the COR of any lost or suspected lost key within 24 hours.

3. The Contractor shall not lend keys or open locked rooms or areas to permit entrance by persons other than the Contractor’s assigned staff. The Contractor shall be responsible for securing areas upon completion of duties. There may be certain areas identified by the COR in which

Contractor personnel must immediately notify the COR or Security Personnel if a door is found unlocked.

4. When leaving a work area, the Contractor shall turn off lights if the area is unoccupied unless otherwise directed by the COR. The Contractor shall secure and lock the window(s) before leaving the area and if there is difficulty securing the areas, the Contractor shall notify the COR or designated representative.

5. The Contractor shall comply with the security clearances or access controls imposed.

6. The Contractor shall turn in all lost articles found during the performance of duties to the COR or designated representative.

7. If the contractor does not have access to an area due to either not having a key or otherwise, the contractor shall immediately notify the COR and cc the Contracting Officer in writing, so that appropriate action can be taken.

8. The engineering, IT, and telephone closets are restricted access. The contractor will not have keys to those areas and will require an escort to those areas.

5.9 Interference to Normal Function

The Contractor shall delay or interrupt their work at any time to avoid interference with patient care procedures and the normal function of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment, and carts.

5.10 Damage and Equipment Loss

1. The Contractor shall report damages or disfigurement of Government-owned furnishings, fixtures, equipment, and architectural or building structures to the COR immediately. The

Contractor shall provide a written report of any damage or disfigurement to items to the COR or designated representative within 24 hours. The Government will not be responsible for

Contractor’s equipment or belongings that are lost, stolen or damaged.

2. The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. Any damage must be reported to the COR immediately for appropriate action.

3. Damage to the building, its contents or loss of Government property, in excess of $100,000 will require a Report of Survey or Investigative Report by VA Personnel. Appropriate Government personnel will conduct the investigation. The responsible party will be required to replace and/or submit payment for damage or loss.

4. The Contractor shall use reasonable care or be liable for the cost of repairs and/or replacement of damages to Government-owned equipment, fixtures, furnishings, grounds and architectural or building structures.

5.11 Handling of Government Furniture and Equipment

1. The COR or designated representative will instruct the Contractor what Government items should not to be moved or otherwise handled. Any medical apparatus in use on or by a patient will not be moved or otherwise handled by the Contractor except when prior arrangements have been made with the nurse supervisor.

2. In emergency situations, the Contractor’s assistance may be required to help move patients out of harm’s way.

5.12 Conservation of Utilities

1. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under condition which precludes the waste of utilities, which shall include:

a) The Contractor shall not adjust any mechanical equipment controls for heating, ventilation and air conditioning system unless otherwise directed by the COR or designated representative.

b) The Contractor shall turn-off all water faucets or values when not in usage.

c) The Contractor shall not use Government telephones for personal reasons.

5.13 Applicable Regulations and Manuals

1. All work under this contract must be performed in accordance with (1) current Joint Commission

Manual (JC); (2) Occupational Safety and Health Agency (OSHA); (3) Environmental Protection

Agency (EPA) and Hazardous Materials requirements; (4) regulations cited in this Performance

Work Statement (PWS) and (5) industry standards.

2. Documents applicable to work described in this section are mandatory and are listed below. The

Government will provide the Contractor copies of all regulations, manuals and specifications such as those listed below. Supplements and amendments will be updated and will be considered to be full force and effective immediately upon receipt by the Contractor. The policies and procedures of mandatory directives shall be adhered to at all times. The Contractor shall insure that all mandatory publications are posted and up to date.

a) Security Clearances, Access Controls, Identification Badges

b) Facility policies concerning fire / disaster program.

c) Parking Requirements

d) Infection Control Manuals

5.14 Security Requirements

1. All contractor employees and subcontractor employees requiring access to VA information and

VA information systems shall complete the following before being granted access to VA information and its systems:

a) Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, Appendix E relating to access to VA information and information systems;

b) Successfully complete the VA Cyber Security Awareness and Rules of Behavior training and annually complete required security training;

c) The contractor shall provide to the COR a copy of the training certificates and certification of signing the Contractor Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required.

5.15 Information Security Requirements

1. The C&A requirements do apply and that a Security Accreditation Package is required. The vendor will be in contact or will have access to VA sensitive information. VA sensitive information procedures will be followed per VA Handbook 6500.6.

2. Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

3. Information Security and Privacy Training

a) All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and its systems;

b) Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, VA Handbook 6500.6, Appendix E relating to access to VA information and information systems;

c) Successfully complete the VA Cyber Security Awareness and Rules of Behavior training and annually complete required security training;

d) Successfully complete the appropriate VA privacy training and annually complete required privacy training; and

e) Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system access [to be defined by the VA program official and provided to the contracting officer for inclusion in the solicitation document – e.g., any role-based information security training required in accordance with NIST Special

Publication 800-16, Information Technology Security Training Requirements.

f) The contractor shall provide to the contracting officer and/or the COR a copy of the training certificates and certification of signing the Contractor Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required.

g) Failure to complete the mandatory annual training and sign the Rules of Behavior annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete.

4. Contractor Personnel Security Requirements - Information Systems Access

a) All contractors, subcontractors, and third-party servicers and associates working with VA information are subject…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .