S02 - Attachment 2 - VHA Required Div 01 Spec Sections.docx
DOCX document 19 KB Posted
- Attached to
- C1DA--EHRM Infrastructure Upgrades – Data Center - Ft. Harrison, MT (VA-21-00042199) Federal contract opportunity
- Solicitation number
- 36C77621R0122
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 - Attachment 6 - 01 32 16.01 EHRM Arch and Eng CPM Schedule Spec.docx | DOCX document | |
| S02 - Attachment 3 - OEHRM Site Infrastructure Requirements - 2.0.pdf | ||
| S02 - Attachment 8 - Seasonal Influenza with Vaccines.pdf | ||
| S02 - Attachment 9 - VHA Directive 1061.pdf | ||
| S02 - Attachment 11 - Past Performance Questionnaire.docx | DOCX document | |
| S02 - Attachment 4 - SOCAMES 6 Design Alert 1.pdf | ||
| 36C77621R0122.docx | DOCX document | |
| S02 - Attachment 10 - EHRM Readiness Infrastructure Self-Assessment.xlsx | XLSX spreadsheet | |
| S02 - Attachment 7 - PG 18-15 AE Submission Reqts Vol C (Ft Harrison).doc | DOC document | |
| S02 - Attachment 5 - Sensitive Infrastructure Data Classification Memo.pdf | ||
| S02 - Attachment 1 - AE Design SOW.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements