S01 RFQ 36C25922Q0577.docx

DOCX document 159 KB Posted

Attached to
S209-- Laundry and Cleaning Services Federal contract opportunity
Solicitation number
36C25922Q0577
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This is a solicitation for laundry and cleaning services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is seeking these services for the Salt Lake City VA Medical Center. The contractor will provide all labor, supervision, equipment, supplies, transportation, and facilities necessary to process approximately 800,000 pounds of soiled hospital laundry, uniforms, patient clothing, and 37,000 pounds of hospitality linens on an annual basis. Services include weekly pickup and delivery. The base period of performance is from October 7, 2022 to October 6, 2023 with four optional one-year extensions. The solicitation includes a performance work statement outlining requirements, a price schedule through the potential option years, and standard clauses for commercial services contracts with the federal government.

View the file

Other files for this federal contract opportunity

Other files attached to S209-- Laundry and Cleaning Services, newest first.
File Type Posted
Sol Amendment 36C25922Q0577 0001.docx DOCX document
P07 Wage Determination.pdf PDF
36C25922Q0577_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25922Q0577

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

UEI:

EFT:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

660-23-1-5053-0005 36C25922Q0577 8-04 -2022 Jerry Danso 303-712-5761 08-19-2022

1:00 PM

MDT

36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 X X Y 812320 $6 Million N/A X Department of Veterans Affairs 554/741 - Denver VHA 742 - Denver/HAC 70 554/741 - Denver VHA 742 - Denver/HAC 70 Salt Lake City UT 84148 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111

Department of Veterans Affairs Financial Service Center PO Box 149971 Austin TX 78714-9971 1-877-353-9791 512-460-5221 See CONTINUATION Page The contractor shall furnish the physical laundry plant (at an off-site location), all labor, supervision, management, management support, supplies, ancillary equipmen vehicles and materials necessary for accomplishment of complete laundry/linen services, in accordance with PWS.

U.S. Dept. of Labor Wage Determination # 2015-5489 , rev 19 is applicable to this acquisition and resulting contract.

All correspondence and offers must be sent to:

Jerry.danso@va.gov. Offers are due by 1pm MT on 08/19/2022 See Section C7 for Subcontracting Plan. Failure to complete subcontracting plan will be deemed noncompliant to the RFQ.

The FORM must be filled-out and signed by all vendors.

SEE SECTION

C3

FOR PERIOD OF PERFORMANCE

See CONTINUATION Page X X X Timothy Myers Table of Contents

SECTION B - CONTINUATION OF SF 1449 BLOCKS4
B.1 CONTRACT ADMINISTRATION DATA4
B.2 STATEMENT OF WORK5
6.1.Applicable Regulations, Manuals and Specifications21
Method – Type of Surveillance Reduction When AQL Exceeded25
Deduction Amount25
B.3 PRICE/COST SCHEDULE32
ITEM INFORMATION32
SECTION C - CONTRACT CLAUSES39
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)39
C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)45
C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)45
C.4 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION)46
C.5 SUPPLEMENTAL INSURANCE REQUIREMENTS46
C.6 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020)47
C.7 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)49
C.8 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION)49
C.9 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)51
C.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)51
C.11 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2022) (JUL 2020) (DEVIATION)52
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS61
SECTION E - SOLICITATION PROVISIONS62
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)62
E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)66
E.3 52.216-1 TYPE OF CONTRACT (APR 1984)69
E.4 52.233-2 SERVICE OF PROTEST (SEP 2006)69
E.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)70
E.6 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)71
E.7 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2022) (JUL 2020) (DEVIATION)72

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

B.1.1.1. CONTRACTOR:Name:
Title:
Company:
Duns Number:
Address:
Telephone:
FAX #:
E-mail address:
B.1.1.2. GOVERNMENT:Contracting Officer 36C259
Timothy Myers
Email: Timothy.Myers5@va.gov
Phone: 303-712-5280
Contract Specialist 36C259
Jerry Danso, jerry.danso@va.gov, 303-712-5761
Department of Veterans Affairs
Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300
Greenwood Village CO 80111
B.1.1.3. GOVERNMENT:Program Office Representatives: TBD
Email:
Phone:
Department of Veterans Affairs
Salt Lake City Veterans Health Care
500 Foothill Drive
Salt Lake City UT 84148

b. GOVERNMENT: Contracting Officer 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[X] – Monthly in Arrears

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

B.2 STATEMENT OF WORK

Section 1 - GENERAL INFORMATION

1.1. Scope of Work

1.1.1. This document contains the technical provisions for laundry/linen services that are to be provided to the Salt Lake City VA Medical Center.

1.1.1.1.1. The work required by this Performance Work Statement (PWS), consists of furnishing the physical laundry plant (at an off-site location), all labor, supervision, management, management support, supplies, ancillary equipment, vehicles and materials necessary for accomplishment of complete laundry/linen services, as described in Section 5.

1.1.1.1.2. All workmanship shall be in accordance with practices established by the Association for Linen Management (ALM), Dry Cleaning and Laundry Institute International (DLI), and accepted industry standards. It is intended that services shall include all processes necessary for the laundering of the articles even though every step involved is not specifically mentioned. All work shall be performed under sanitary conditions as specified by the Joint Commission (JC). Physical separation, through the presence of a barrier wall and the use of pass-through equipment is required to maintain positive air pressure in the clean section relative to a negative air pressure in the soiled section. In no case shall clean and soiled linen share the same physical space. Plants in which the work is done shall be open to inspection of sanitary conditions by Government representatives. After processing, laundered articles shall be in serviceable and sanitary condition, meeting established quality and performance requirement standards as shown in Section 7.

*The Laundry Plant layout/design should incorporate a “design for asepsis” whereby clean linen does not come into contact with soiled linens nor share the same physical space, thus avoiding cross-contamination or reintroduction of bacteria once processed.

1.1.1.1.3. Hospitality linens from the Fisher House must be processed separately from general hospital linens and employee uniforms.

1.1.1.4. The Contractor will deliver processed linens in covered carts that have been cleaned and sanitized. Carts will contain like items.

1.1.2. Any change of function by the Government, which may affect this contract as contemplated by this paragraph, and which requires permanent adjustments in frequency or type of performance, will be coordinated with the Contractor by the COR and CO prior to initiation of such a change to assure adequate contractual coverage.

1.1.3. Notwithstanding the provisions of the contract covering inspection, acceptance, and deduction from payment, any items found to have been unsatisfactorily cleaned per quality and performance standards established in Section 7, shall be re-cleaned at no additional cost to the Government. Such items shall be identified, for contractor recognition, by the COR when they are returned on the next scheduled pickup after an unsatisfactory condition is discovered. These items are to be kept separate from the normal laundry items for separate processing. Re-cleaned items will be identified separately and not charged to the Government.

1.1.4. Scheduled services are to be accomplished subject to emergency situations, which may require alteration of schedules. Emergency situations will be defined by the COR. In the event of Medical Facility emergencies, disaster, or drills, the Contractor shall perform all laundry/linen services required by the Medical Facility.

1.1.5. This specification is intended to produce minimal acceptable level of performance. The Government does recognize the possibility of the Contractor achieving the same or improved results due to innovative approaches, advances in the state-of-the-art materials, equipment and supplies. Accordingly, provision is hereby made for alterations when a Contractor demonstrates the ability to maintain the standards established herein through use of improved techniques, materials, scheduling, etc. All changes are contingent upon the recommendations of the COR and the approval of the CO or other management official as may be deemed appropriate.

1.2. Contractor Experience.

The Contractor shall have experience in providing Medical Center laundry/linen services. The firm must have gained this experience as a result of being primarily engaged in the business of providing laundry/linen services in Medical Center environments (e.g., inpatient and outpatient medical treatment facilities) for a minimum of three consecutive years prior to submitting proposal.

1.3. Supervision By Contractor:

1.3.1. The Contractor shall assign an on-site manager at their laundry processing plant who shall be physically present during prescribed work hours. The on-site manager is solely responsible to supervise the provision of these laundry/linen services to SLCVA and serves as the primary point of contact with the Government. The Contractor shall designate a qualified alternate to substitute for the on-site manager in his absence or during periods of work performed after normal work hours. The Contractor’s Plant Manager (CPM) must meet the following requirements:

1.3.1.1. Certified by ALM or graduate of an independently controlled management-training program emphasizing institutional laundry.

1.3.1.2. CPM shall have at least three years of specialized experience in this capacity. This specialized experience maybe substituted for certification.

1.3.2. The CO and COR must be provided with the name, address and telephone number where the CPM is to be reached during normal business hours and off duty hours within 15 days after award. The same information will be provided for a qualified alternate when the CPM is not available.

1.3.3. The Contractor is responsible for the effective implementation of their Quality Control program, and shall be responsive to the requirements of the Government’s Quality Assurance Plan conducted by the COR.

1.3.4. CPM or alternate shall respond in person, or by telephone, within 1 hour of notification by the COR. The CPM and any designated alternate shall have full authority to contractually commit the Contractor for prompt action on matters pertaining to the contract.

1.4. Personnel Qualifications and Requirements for Contract Service:

1.4.1. Employment:

1.4.1.1. The CPM and qualified alternate must be able to read, write, speak and understand the English language.

1.4.1.2. The Contractor shall provide sufficient and adequately trained personnel, who are paid at the prevailing rate, as necessary to perform the services required by this contract and shall meet all variations, shift schedules, and changes as may be required to assure prompt response to the requirements of contract.

1.4.2. Training:

1.4.2.1. No contractor personnel may be assigned to work under the contract until initial orientation and training, as specified in the Contractor’s procedures manual is completed. Documentation verifying the content of the training and a list of the personnel who attended shall be maintained by the Contractor. When the Government exercises one or more of the option years to the contract, the Contractor shall provide, to the COR, documentation that personnel have had refresher training.

1.4.2.2. Initial intensive training covering the topics below shall be completed prior to initial start-up for all personnel. Initial training plan, including topics, with a brief statement of content and method of training shall be available for review. Initial training will include but not limited to the following topics:

1.4.2.2.1. A general orientation of basic bacteriological concepts, including the basics of how disease is caused and transmitted.

1.4.2.2.2. Infection control orientation, relating duty functions to how infections can be prevented, reduced, or contained through proper environmental sanitation methods and to the technical provisions of this specification.

1.4.2.2.3. Proper use and handling of supplies and equipment.

1.4.2.2.4. Care and maintenance of Contractor and Government-furnished property.

1.4.2.2.5. Familiarization with local fire prevention and safety procedures.

1.4.2.2.6. Familiarization with equipment operational manuals.

1.4.2.2.7. Individual duties and responsibilities.

1.4.2.2.8. Procedures for replenishing supplies and obtaining equipment repair.

1.4.2.2.9. Role of Contractor personnel and their impact on patient care.

1.4.2.2.10. Techniques or methods for measuring the quality of work performance.

1.4.2.2.11. A general orientation of laundry operating procedures and policies.

1.4.2.2.12. Hazard communication, including location and access to the Safety Data Sheets (SDS).

1.4.2.2.13. Compliance with Occupational Safety and Health Administration (OSHA)’s Bloodborne Pathogen Standard 29 CFR 1910.1030, which covers Universal precautions and use of PPE (Personal Protective Equipment).

1.4.2.2.14. Hepatitis B Virus (HBV) requirement.

1.4.2.3. Safety or protective clothing or equipment shall be provided and maintained by the contractor at the Contractor’s own expense.

1.4.2.4. Personal Hygiene. Contractor personnel shall be clean and neat in appearance.

1.4.2.5. Exposure to Hazardous Working Conditions. Contractor personnel are required to perform work under potentially hazardous conditions. Contractor personnel shall be informed of potentially hazardous situations by Contractor, trained by Contractor in techniques required to recognize and deal with potentially hazardous situations in a manner which will minimize personal risk, and required to adhere to standard techniques for personal who become injured or ill on the job at no cost to the Government.

1.4.2.6. Physical Examinations:

1.4.2.6.1. The contractor will be responsible for any physical examinations and emergency medical care of personnel.

1.4.2.6.2. Contractor’s personnel who acquire a communicable illness must not perform service under the contract and must be free of illness before returning to work.

1.4.2.7. Miscellaneous:

The Contractor is responsible for compliance with all appropriate JC, FDA, VA, and other regulatory agencies record keeping requirements.

1.5. Quality Control and Quality Assurance for Contract Service:

1.5.1. Quality Control. The Contractor shall have a Quality Control program to assure that the requirements of the contract are provided as specified. One copy of the Contractor’s basic Quality Control Program shall be available for review by the COR. Subsequent changes to the approved Quality Control Program must also be reviewed and approved by the COR. The program shall include, but not be limited to the following:

1.5.1.1. An inspection system covering the performance indicators given in Section 7, of the Quality Assurance/Performance Requirements summary.

1.5.1.2. A method for identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable.

1.5.1.3. A file of all quality control inspections, inspection results, and any corrective action required shall be maintained by the Contractor throughout the duration of this contract. This file shall be the property of the Government and shall be available to the COR during normal working hours. The file shall be turned over to the Government within 14 days of completion of termination of the contract.

1.5.2. Quality Assurance. The Government will monitor the Contractor’s performance under this contract using the Quality Assurance Procedures outlined in Section 7. Assessments may be made monthly by the Government in accordance with stated limits on discrepancies.

1.5.3. Pre-Award Survey. The Contractor shall have management officials, of an appropriate level, represent the firm. The Contractor shall also be prepared to present a briefing regarding the manner in which these contractual obligations are to be accomplished. As a minimum, the Contractor shall address the following items of information in the presentation:

1.5.3.1. Start-up and phase-in schedule.

1.5.3.2. Procedures to secure Government property while under Contractor’s jurisdiction.

1.5.3.3. Availability of labor force (manning chart), plan for recruiting, type, and extent of training.

1.5.3.4. The role of the CPM and extent of authority.

1.5.3.5. A copy of the Contractor’s Policy and Procedure Manual.

1.5.3.6. Plans and management procedures for logistical administrative support of all functions; that is receipt, processing, packaging and delivery of clean linens.

1.5.3.7. Procedures to be used to ensure contract requirements are met (Quality Control Program).

1.5.3.8. Certification that Contractor’s scales used for weighing soiled and clean linens have been calibrated on a regular basis (i.e. quarterly).

1.6. Government Representative.

The COR is responsible for providing technical assistance to the CO in administration of the contract. This responsibility involves quality assurance inspection, surveillance reporting and monthly certification of the Contractor’s performance by the COR. The CO will furnish the name of the COR prior to the start date of the contract. The Contractor shall be advised of the extent of the authority of the COR. The COR shall have access to plant facilities, without necessity of prior notification to Contractor. Each phase of the services rendered under this contract is subject to Government inspection during both the Contractor’s operation and after completion of tasks. The Government’s program is not a substitute for quality control by the Contractor.

1.7. Performance Evaluation Meetings:

1.7.1. The CPM shall meet with the COR on a frequency of once each month if needed as determined by the COR or as often as necessary according to schedule established by the COR.

1.7.2. The issuance of a Contract Discrepancy Report (CDR) may be cause for the scheduling of additional meeting(s) between the CPM and the COR. A mutual effort will be made to resolve all problems identified. The COR will prepare written minutes of these meetings. Should the CPM not concur with the minutes, a written statement will be presented to the CO, and the CPM will be notified of the decision in writing by the CO.

1.8. Correspondence.

All correspondence relative to this contract shall bear the VA contract number, title, and name of the VA medical center, and shall be addressed to the COR with a copy to the CO.

1.9. Security.

It is the responsibility of the Contractor to ensure that all extraneous articles, except trash, found in linens or in areas under the jurisdiction of the Contractor (i.e., medical instruments and personal items) are turned in to the COR daily (M - F). A note will accompany the articles returned identifying the area or origination, and the type of linen or item it was found on (ex: general, OR, special).

1.10. Safety and Fire Prevention:

1.10.1. In the performance of this contract, the Contractor must take such safety precautions as necessary to protect the lives and health of individuals within the laundry plant and transportation vehicles.

1.10.2. Fire and safety deficiencies, which exist and are part of the responsibility of the Contractor, must be corrected immediately. If the Contractor fails or refuses to correct deficiencies promptly, the CO may issue an order stopping all or any part of the work and hold the Contractor in default of the contract.

1.10.3. The Contractor will comply with Federal, State, and local safety and fire regulations and codes. The Contractor shall keep abreast of and comply with changes in these regulations and codes.

1.10.4. Contractor’s personnel shall follow policies concerning fire/disaster programs.

1.10.5. The Contractor shall display approved warning devices in all areas where operations may cause traffic obstruction or personnel hazard.

1.11. Damage and Equipment loss:

1.11.1. All tasks accomplished by Contractor’s personnel shall be performed to preclude damage or disfigurement of Government-owned furnishings, fixtures, equipment, and architectural or building structures. The Contractor shall verbally report immediately to the COR, any damage or disfigurement to these items when caused by Contractor’s personnel.

1.11.2. When the Contractor has caused damage or loss of government property, or performance is determined to be unsatisfactory; the COR will issue a CDR. The Contractor will reply in writing, to the COR within 10 working days, stating the reason for the unsatisfactory condition, the corrective measures which have been taken, and preventive procedures initiated.

1.11.3. Any damage caused to Government property during the course of the Contractor’s performance of work under the contract shall be repaired or replaced to preexisting conditions at Contractor’s own expense.

1.12. Linen Control

1.12.1. Contractor shall comply with all Government request and policies relative to linen control.

1.12.2. Contractor shall participate, as required by VA policy, in inventories of Government-provided specialty linen.

1.12.3. Any articles billed for, but missing, shall be supplied by the Contractor in the next regularly scheduled delivery at no additional cost to the Government.

1.12.4. VA owned items lost or badly damaged while under the control of the Contractor must be replaced within a 30-day period at the Contractor’s cost.

1.12.5. Unusual losses, including suspected pilferage, shall be reported at once to the COR, who will take immediate action to investigate the loss. If the loss is not recovered, the cost of replacement will be negotiated with the Contracting Officer, along with the approval of the COR, on a quarterly basis. The Vendor will supply an itemized list (by location) of linen that will be replaced, (including item description, quantity and unit cost).

1.12.6. Claim of Patients and Employees. The Contractor shall establish procedures for the settlement of claims for loss or damage to property of patients and employees while in Contractor’s possession, The procedures must be established, and a copy provided to the Contracting Officer for approval, within 20 calendar days after the contract award date.

1.13. Delivery Requirements:

1.13.1. The Contractor shall provide the COR with a written report of all soiled linen processed and all clean linen delivered, showing cart number and weight. The information must be recorded on a daily basis and delivered to the COR at the end of the current workweek. The reports of soiled linen received and clean linen delivered must show date, the name of the item, number of pieces received or delivered per Schedule Line Item number, pounds received or delivered per Schedule Line Item number, cart number/ weight and where they were delivered.

1.13.2. The COR will verify the deliveries daily and discuss any discrepancies with the CPM.

1.13.3. The Contractor shall disinfect carts after removing soiled linen from them and before placing clean linen in them, with a Tuberculocidal Germicide, which has been approved by the COR. Carts containing clean linen being returned shall be covered with clean covers to protect them against contamination while in transit between the laundry plant and the Medical Center. Laundry bags or liners, used to transport soiled laundry, must be laundered after use.

1.13.4. Clean linen and specialty items shall be available for transport Monday - Friday except for federal holidays. Soiled linen and specialty items will be available for processing Monday - Friday except for federal holidays.

1.13.5. Clean linen will be processed and packaged as specified in Section 5.

1.13.6. Contractor’s personnel shall clean the linen transport vehicle with a tuberculocidal germicide/disinfectant, which has been approved by the COR.

1.13.7. Clean linen delivery and soiled linen pickup shall be between 6:00 am and 9:00am daily, Monday, Wednesday, and Friday, or as established by the COR.

1.14. Phase-out Plan.

The Contractor shall have a phase out plan. This plan shall describe the Contractor’s methods and procedures to ensure smooth and uninterrupted service at contract expiration date for a period not to exceed 90 days. The Contractor shall fully cooperate with the successor Contractor and the Government so as not to interfere with their work or duties.

1.15. Circumstances to be reported.

The Contractor shall report any circumstances, which may affect the performance of the work and unhealthy or hazardous conditions or any delays or interference with work. Such reports shall be made immediately upon discovery by the Contractor to the COR.

1.16. Contingency Plan, Contractor shall furnish with his proposal a written Contingency Plan indicating that services can be continued in the event of Contractor’s equipment and /or production facility failure. This Contingency Plan must also include transportation vehicle failure.

Section 2 - Definitions/Acronyms

2.1. Definitions. Definitions used throughout this Performance Work Statement shall have the following meanings as set forth below:

Ancillary Equipment. Equipment required for Contractor’s operations but not directly related to laundry production, e.g., cleaning equipment.

AQL (Acceptable Quality Level). The maximum percent of defective work, or number of defects that will be allowed before work is considered unsatisfactory. An AQL does not imply that the Contractor has knowingly performed in an unsatisfactory way. It implies that the Government recognizes that unsatisfactory performance sometimes happens unintentionally. As long as unsatisfactory performance does not exceed the AQL, the service will not be subject to payment reduction by the Government. The Contractor, however, must correct all unsatisfactory work unless excused by the COR.

CDR (Contract Discrepancy Report). Government formal documentation of Contractor’s failure to provide services as required under the terms of the contract. The CDR requires the Contractor to explain in writing why performance was unsatisfactory, how performance will be returned to satisfactory levels, and how recurrence of the problem will be prevented in the future.

Clean. Laundered articles are dry and free of visible soil, lint and objectionable odor. Spots and stains are removed where practical without fabric damage. No residual harmful chemicals are present.

Consumable Supplies. Those supplies used in the day-to-day operation of the laundry, e.g., detergent, bleach, and alkali.

Contractor. An individual, partnership, or organization having a contractual relationship with the Government for provision of service.

CO (Contracting Officer). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.

COR (Contracting Officer’s Technical Representative). Any person or persons authorized to act for the Contracting Officer within authority limits.

CPM (Contractor’s Plant Manager). Contractor’s representative having supervisory responsibility and authority for total performance of work under the contract.

Cure Notice. A formal notification to Contractor to correct a deficient situation or risk termination of contract.

Defect. Each instance of noncompliance with a contract requirement. A defect may be caused by either nonperformance or poor performance. Each defect is subject to deductions, as set forth in Section VII.

Delivery Point. Point which soiled linen is picked up for processing by the Contractor and clean linen delivered to the Medical Facility.

Department of Veterans Affairs. Government agency requiring services under the terms of the contract.

Emergency. An unforeseen combination of circumstances, or the resulting state, which requires immediate action. An emergency situation shall be declared by the COR.

Fair Wear and Tear Condition. That which is worn out by normal usage with no negligent misuse involved and cannot be used for its intended purpose.

Federal Holidays. The date of observance by the Federal Government of the following holidays: New Year’s Day (1 January), King’s Birthday (3rd Monday in January), Washington’s Birthday (3rd Monday in February), Memorial Day (Last Monday in May), Juneteenth (19th of June), Independence Day (4th of July), Labor Day (1st Monday in September), Columbus Day (2nd Monday in October), Veteran’s Day (11 November), Thanksgiving Day (4th Thursday in November), and Christmas Day (25 December). When such holiday falls on first non-workday, the preceding workday will be considered a holiday. When such holiday falls on the second non-workday, the next workday will be considered a holiday.

General Linens. Linens which are commercially available, such as, sheets, towels, blankets, bedspreads, pillowcases, washcloths, bath blankets, pajamas, bathrobes, mattress pads, bed pads, fitted sheets, surgical linen and other items identified in Section 5. Contractor supplied linens do not have to have a logo.

Government. The United States Government, Headquarters, VA, VAMC, and the term used to refer to the officials designated to administer the contract or their designated representatives.

Infection Control Committee. The group designated for implementation and monitoring of the infection control program for the Medical Center as prescribed by JC and the VA.

JC (Joint Commission). A national organization dedicated to improving the care, safety, and treatment of patients in health care facilities.

Launder. To clean by chemical and mechanical action materials composed of natural or synthetic fibers. For the purposes of the contract the terms include tumble-drying, ironing, folding, and all other industry standard processes, which textile products undergo while in the laundry.

Linen. Reusable textile items composed, in whole or in part, of natural, synthetic or blended fibers.

Linen Inventory. An itemized listing of quantities and values for accounting purposes of linen items in circulation at the Medical Center(s).

Manning Chart. A survey chart or inventory for scheduling manpower requirements in an industrial plant showing each operation with number of workers.

Medical Center Director (s). The person with final responsibility for the mission of the Medical Center. A Medical Center Director may have final authority over more than one Medical Center.

Must. This word is used in connection with the Contractor and specifies that the provision is binding.

Packaging. Packaging is the process by which cleaned garments and linen are returned to the Medical Center. Linen is delivered in linen carts by quotas according to established arrangement agreed upon by the COR and CPM, All linen is packaged securely to prevent possible contamination.

Patient Clothing. Personal property of patients, e.g., pants, shirts, underwear.

Personal Property. All Government property, except real property and expendable property.

Procedures Manual. A Contractor’s written document describing in detail the methods normally used to accomplish tasks required by the contract, proper operation of equipment, and normal fire/ safety precautions.

PWS (Performance Work Statement). A document that describes accurately the essential technical requirements for services, including the standards used to determine whether the requirements have been met.

Quality Assurance. Those actions taken by the government to check goods or services to determine that they meet the requirements of the PWS.

Quality Assurance Evaluator. Government employee(s) assigned to monitor and evaluate the quality and compliance with the Performance Work Statement requirements.

Quality Control. Those actions taken by the Contractor to control the production of goods or services so that they will meet the requirements of the PWS.

Sanitary. In a clean state, protected from the contamination of pathogenic organisms.

Satisfactory Performance. Within limits of the AQL, adherence to the requirements of the PWS.

Separation. Physical separation of contaminated materials from other materials or personnel to prevent the spread of contamination.

Service. A job performed to the standard and within the acceptable quality level. The Contractor must do the specific job, meet the standard, and meet the acceptable quality level before performance is acceptable and the Contractor is paid.

Serviceable Articles. Articles usable in their current condition, or restorable by economically justified repair methods to usable condition.

Shall. This word is used in connection with the Contractor and specifies that the provision is binding.

Specialty Items. All textile items not classified as general linens. Example – soap free linen, restraints, cubicle curtains, etc.

Standard. A Government acknowledged measure of comparison.

Start Date. The date work under the contract is scheduled to begin.

Surgical Linen. Linen utilized by surgical and / or specialized units. Normally blue or green linen.

Surveillance Plan. An organized written document used for quality assurance surveillance.

Task and Frequency Chart. Displays the required tasks and the minimum frequencies of performance.

Textile Care Processing Facility. A facility designed to render soiled linens clean, sanitary and aesthetically acceptable for reuse, in an efficient and non-damaging manner.

Trash. Rubbish or refuse.

Uniforms. Government owned clothing worn by VA employees as a means of identification.

Unsatisfactory Performance. Failure to meet the AQL.

Unserviceable Item. An item, which can no longer be used for its intended purpose.

VA (Department of Veterans Affairs). The Government agency requiring services under the terms of the contract.

VAMC. Veterans Affairs Medical Center

Headquarter. Veterans Affairs Central Office.

Will. This word is used in connection with the Government and specifies that the provision is binding.

2.2. Commonly used Acronyms

AQL
Acceptable Quality Level
CDR
Contracting Discrepancy Report
CO
Contracting Officer
COR
Contracting Officer’s Representative
CPM
Contractor’s Plant Manager
FW&T
Fair Wear and Tear
IAW
In Accordance With
DLI
Dry Cleaning and Laundry Institute International (DLI)
IG
Inspector General
JC
Joint Commission
MCD
Medical Center Director
MIL-STD-105D
Specification for sampling procedures and tables for inspections by attributes.
N/A
Not Allowable
ALM
Association for Linen Management
PWS
Performance Work Statement
M - F
Monday thru Friday
QAE
Quality Assurance Evaluator
QC
Quality Control
RS
Random Sampling
VA
Department of Veterans Affairs

Section 3 - Government Furnished Property and Services

3.1. Materials:

3.1.1. The Government will provide forms, publications and services specifically identified in this contract as Government furnished.

3.1.2. Fair/wear/tear or unserviceable condition of specialty items will be determined by the COR.

3.1.3. The Government will provide restroom and hand washing facilities for Contractor employees to wash their hands following exposure to blood or other body fluids while at the Medical Facility.

3.1.4. The Government will provide facility passes for Contractor’s employees as necessary to fulfill provisions of this contract.

3.1.5. The Government will provide a detailed list of specialty items to be laundered.

Section 4 - Contractor Furnished Items

4.1. Materials. Contractor shall furnish all materials necessary to perform the tasks specified in the contract except to the extent specified in Section III. The Contractor shall secure all materials and supplies that comply with Local, State and Federal environmental laws.

4.2. Vehicles. The Contractor shall provide all required vehicles, vehicle fuels, lubricants, and repairs necessary to perform services under this contract. All vehicles to be used under this contract must be maintained in a safe and serviceable condition during duration of this contract. In addition, the vehicles must be kept clean (exterior and interior) with no unsightly residue of dirt, mud, trash, and other debris. Vehicle efficiency is solely the responsibility of Contractor and Contractor shall not be relieved of his contract responsibilities due to vehicle breakdown or failure of vehicles to operate.

4.3. Carts. Contractor shall maintain bulk delivery linen carts in good repair for employee safety/ergonomics. Replacement or additional cart requirements shall be the responsibility of the Contractor. All carts shall be numbered and have empty weight indicated on both ends.

4.4. Rags. If available, salvaged items and or items to be used as rags when requested by the COR. i.e.: terry material

4.5. Reports and Data. The Contractor shall provide, in writing, to the COR the data and reports identified in Technical Exhibit 3.

4.6. Miscellaneous. The Contractor shall furnish other items as identified within this contract, such as, orientation and training, medical exams, procedures manual, quality control program, required data.

Section 5 - Specific Tasks

5.1. The Contractor shall accept for processing all soiled linens, uniforms, patient clothing, mops, etc. After processing all items are to be finished and delivered to the Medical Center in accordance with the terms outlined below.

Note: Hospitality linens from the Fisher House must be processed separately from general hospital linens and employee uniforms.

5.1.1. Flatwork items that must be conditioned, ironed, and folded:

5.1.1.1.Apron, cook
5.1.1.2.Pillowcases, regular
5.1.1.3.Pillowcases, surgical
5.1.1.4.Sheets, poly/cotton, bed
5.1.1.5.Tablecloth
5.1.1.6.Wrappers, surgical and misc. surgical linen: Small, Medium, and Large.
5.1.1.7.Misc. Items: Small, Medium, and Large.
5.1.1.8.Doctor Coats

5.1.2. Items that must be finished and placed on hangers:

5.1.2.1.Patient personal clothing (shirts / pants)
5.1.2.2.Shirt, uniform
5.1.2.3.Trouser, uniform
5.1.2.4.Smock, knee length long coats
5.1.2.5.Coveralls
5.1.2.6.Coat, short
5.1.2.7.Pantsuit, top
5.1.2.8.Pantsuit, bottom
5.1.2.9.Scrubs used as a uniform

5.1.3. Items that must be tumbled dried and folded:

5.1.3.1.Bathrobe
5.1.3.2.Blankets, bath
5.1.3.3.Blankets, bedspread
5.1.3.4.Cover, mattress
5.1.3.5.Curtains, shower
5.1.3.6.Curtains, cubicle
5.1.3.7.Gown, operating
5.1.3.8.Gown, patient
5.1.3.9.Gown, isolation
5.1.3.10.Pads, absorbent
5.1.3.11.Pads, mattress
5.1.3.12.Pajamas
5.1.3.13.Coat (non-Doctor)
5.1.3.14.Trousers
5.1.3.15.Towel, kitchen
5.1.3.16.Towel, huck
5.1.3.17.Towel, bath
5.1.3.18.Misc. items: Small, Medium, and Large.
5.1.3.19.Warm-up jacket

5.1.4. Items that must be cleaned, dried, and returned in bulk:

5.1.4.1.Mops, wet
5.1.4.2.Mops, dust
5.1.4.3 Mops Microfiber

5.1.5. Items that must be dried and placed in laundry bags:

5.1.5.1.Linen bags
5.1.5.2.Cloth, wash
5.1.5.3.Rags

5.1.6. Items that must be finished folded, identified by patient name/number, if any, and put in protective packaging:

5.1.6.1. Patient’s Personal Clothing, which is not on hangers.

5.2. Packaging:

1. Linen is packaged in bulk by item per quotas and established arrangement.

2. Items finished and placed on hangers are returned in a cart with a coat bar. They are placed on the hanger so identification number and size is showing, if any.

5.3. Additional Guidance. To eliminate the need for separate listing of items that are received infrequently, the item “Miscellaneous: Small, Medium, large” is shown at the end of each lot. This should be interpreted as follows:

5.3.1. Laundry:

Small: An item requiring the approximate time, effort and cost to process as a pillowcase or wrapper.

Medium: An item requiring the approximate time, effort and cost to process as a sheet or spread.

Large: An item requiring the approximate time, effort and cost to process as a blanket.

Section 6 - Applicable Regulations, Manuals, Specifications and Technical Exhibits

6.1. Applicable Regulations, Manuals and Specifications

Documents applicable to the PWS are listed below. These documents are mandatory. At the start of the contract the Government shall provide one copy of all mandatory regulations, manuals and specifications listed below to the Contractor. Supplements and amendments thereto, shall be updated and shall be in full force and effective immediately upon receipt by the Contractor. The policies and procedures of mandatory directives shall be adhered to at all times. It is the Contractor’s responsibility to ensure that all mandatory publications are posted and up to date:

MIL-STD-105D

Security Clearances or Access Controls
Facility Policies concerning fire/disaster programs
Parking
Infection Control Manual
Facility Policy on Laundry, Linen, Uniform Management
ANSI/AAMI ST65:2000
Other applicable regulations, manuals and specifications as identified locally.

6.2. Technical Exhibits

6.2.1. Technical Exhibit #1: Annual Workload Information by Medical Center:

6.2.1.1. The workload stated in the following schedule of services is approximate, based on the volume handled in FY21, and in no way is to be construed as a guarantee by the government as to work that will be processed under contract. In this regard, the workload is subject to changes resulting from many factors, i.e. hospital admissions, weather, mission changes, product changes (new light weight fabrics), etc.

6.2.1.1.1. SLCVA Medical Center

Total Clean Pounds
720000
Total Soiled Pounds
800000

*Includes the Following:

OR Linen
50163
Uniforms
8477
Mops (wet/dust)
84533
Patient clothing
279
General Linen
627566
Hospitality (Fisher House)
28983

**Includes standard items and station unique items not identified such as restraints, cubical curtains, spreads, and special hospitality items for our Fisher House (Duvet covers.)

6.2.2.Technical Exhibit #2:

Contractor Furnished Reports

6.2.2.1. Damage to Government property.

6.2.2.2. Monthly report of washroom chemical titration and Ph.

6.2.2.3. ALM, IFI laboratory test piece report (monthly unless a problem develops) or independent Textile Laboratories.

6.2.2.4.Weekly Soiled Linen per Medical Facility(s) Report to include:
Pounds per Schedule Line Item Received from Medical Facility(s)
Number of Pieces per Schedule Line Item Received from Medical Facility(s)

6.2.2.5. Weekly report of clean linen shipped to delivery points, showing pounds and pieces.

6.2.2.6. Detailed monthly statement of charges as stated in the Contract Terms and Conditions FAR Section 52.212-4. Invoice will also include a total dollar value of current textile inventory replacement costs and total dollar value of unexplained textile losses for the facility(s). The latter 2 items shall be provided as a notation on the total bill; however, payment will not be made without the required information.

6.2.2.7. Textile Care production information and cost report as found in VHA Handbook 1850.3 appendix B.

6.2.2.8. Other reports as required by the COR.

6.2.3. Technical Exhibit #3:

Designated Pick-Up and Delivery Locations

Salt Lake City VA Medical Center

Laundry is picked up at Building 7 Loading Dock and Delivered at Building 7 Loading Dock.

SECTION 7. QUALITY ASSURANCE EVALUATOR (QAE) SURVEILLANCE PLAN

7.1. INTRODUCTION

7.1.1. This QAE Plan has been developed for in-house operations or to implement a service contract. It is designed to aid the Government's QAE in providing effective and systematic surveillance of all aspects of laundry services. This plan provides for monitoring all contract requirements through a combination of methods. These are:

7.1.1.1. Sampling guides
7.1.1.2. Customer complaint surveillance guides; and
7.1.1.3. Surveillance activity checklist.

7.1.2. The objective of this surveillance plan is to evaluate how the Government or Contractor is performing in key areas. We are primarily interested in the final product or service being provided and not in the details of accomplishment.

7.1.3. The principal method of surveillance will be the random sampling of the quantity and quality of laundered items processed. The plan contains sampling guides for use in random sampling. It contains random sampling (tally) checklists which are used to record information about the random samples.

7.1.4. Tasks not surveyed by random sampling will be covered by daily observation in some cases or by use or periodic checklist inspections. Appropriate checklists are provided for recording observations in this type of surveillance.

7.2. HOW TO USE THE SURVEILLANCE PLAN

7.2.1. This surveillance plan has been organized to facilitate use by the QAE. It is the QAE’s responsibility to develop a monthly schedule for activities based on the surveillance plan’s requirements. The monthly schedule will be completed by the last workday of the preceding month and a copy will be submitted to a CO or other management official for information and review by an assigned workday of the month.

7.2.2. To build the inspection schedule, the QAE will select areas and times for the random sampling using the procedures shown in the surveillance plan. Periodic checklist items to be surveyed during the month will be programmed into the schedule to facilitate their accomplishment. This monthly schedule should show what the QAE is monitoring each day. Changes will be posted weekly, and copies sent to appropriate officials. The reasons for changes will be fully documented and explained. Actual surveillance activity must be comparable to the monthly schedule. The responsible management official must be able to observe a QAE’s performance by using the monthly schedule, as updated. One should be able to conduct a complete audit trail from the monthly schedule by observing the QAE perform sampling or other checklist surveillance, and completion of tally and other checklists. An auditor should be able to track from the above items to the management’s actions (payment deductions or other actions as necessary if contract service is being performed), described on a CDR.

7.2.3. Monthly tally checklists will be prepared for each sampling guide and will be used to record information on observations and defects. Each observation in the sampling will be recorded on the tally checklists. These documents will then become a formal record for later reference. The tally of observations and defects at the end of each month will be compared to the acceptable number of defects appearing in the relevant sampling guide. Any errors detected during the course of the surveillance, even if not of sufficient degree to render the service unsatisfactory in terms of the AQL parameters, will require corrective action by the VA for in-house operations and the Contractor for contracted services. Errors detected by the QAE in the course of surveillance will be transmitted to the Contractor or in-house management for correction. Notification of errors will take place within 1 working day. Specifics concerning any errors should be recorded on the tally checklist. The Contractor or in-house management, as applicable, should be asked to initial this record.

7.2.4. If the sampling guide indicates that the number of defects is too high, the current month’s service will be considered unsatisfactory.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .