S.O.W. HP3 AC.docx

DOCX document 22 KB Posted

Attached to
REPLACE AC HEAT PUMP CONDENSING UNIT Federal contract opportunity
Solicitation number
70Z02721QPCV06700
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE AC HEAT PUMP CONDENSING UNIT, newest first.
File Type Posted
RFQ 1449 Solicitation Form.pdf PDF
Commercial Services Clauses Provisions FAC 2021-04.doc DOC document
Wage Rates.txt TXT text file
SERVICE CONTRACT ACT.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK FOR

HP3 AC REPLACEMENT

CONTENTS

1. Introduction

2. Scope of Work

3. Period of Performance

4. Deliverables

5. Schedule

6. Acceptance Criteria

7. Quality Assurance

8. Technical Representative

9. Notes

1.0 INTRODUCTION

The U.S. Coast Guard, Station Ocean City, located at 610 S. Philadelphia AVE Ocean City MD 21842 AC Heat Pump 3 Condensing unit has suffered a catastrophic failure and needs replacement.

2.0 SCOPE OF WORK- The work is to be accomplished through the following task.

2.1. Contractor shall provide services, materials/parts, and equipment needed to replace the existing AC Condensing unit for Heat Pump 3 with a sufficient model to meet the existing needs and specifications of the old unit. Existing model is 4TWA3048B3000BA.

2.2. Contractor shall provide services to recover all refrigerant in the old system and dispose of properly.

2.3. Contractor will be responsible for all aspects of bringing the new unit up to operational standards to include refrigerant charging, wiring, ETC.

2.4. Contractor will be responsible for disposing of old unit.

3.0 PERIOD OF PERFORMANCE

3.1. Period of performance shall be within 3 weeks of acceptance of award to give enough time for unit to be built if needed.

4.0 DELIVERABLES

4.1. The contractor shall provide the following:

4.1.1. All associated parts to complete the repairs.

4.1.2. Equipment needed to complete repairs.

4.1.3. Portable toilet for their technicians to use while on property.

5.0 SCHEDULE. The schedule for milestones and deliverables is given in the following table.

ITEM
DESCRIPTION
QTY
DUE DATE
1
Complete replacement of HP3 condensing unit
1
NLT 3 weeks

6.0 ACCEPTANCE CRITERIA

7.1 The government reserves the right to witness the evaluation and repair processes.

7.2 The government will review the repair work in its entirety prior to issuing approval.

7.0 QUALITY ASSURANCE

7.1. All work shall be developed to commercial standards.

8.0 TECHNICAL REPRESENTATIVE

8.1. The Technical Representative at the U.S. Coast Guard Surface Forces Logistics Center will be MKC William Lee

9.0 NOTES

All Government Furnished Information and work product shall remain the property of the U.S. Coast Guard and shall not be released to any third party or published without prior approval from the COR.

File details come from the government source that posted it. Updated .