S-C00055-00013418 ADDENDUM No 1 - RFP Bridge Engineering Services - Little Clat Confluence.pdf
PDF 2 MB Posted
- Attached to
- RFP Bridge Engineering & Related Svs State and local contract opportunity
- Solicitation number
- S-C00055-00013418
- Issued by
- Coos County, Oregon
About this file
This document is an Addendum No. 1 issued by Columbia County's Department of Public Works for a Request for Proposals (RFP) S-C00055-00001348 for Engineering and Related Services for Bridge Installation at the Little Clatskanie River Confluence (Apiary Road MP 8.4). The addendum, dated April 14, 2025, addresses the RFP released on April 07, 2025, and provides clarification on design plans and project budget. The design budget for the project is estimated between $180,000 and $250,000, with pricing to be determined during contract negotiations with the most qualified consultant. Planholders are required to sign and acknowledge this addendum and include it with their submitted proposal.
The addendum indicates that 30% design plans have already been completed and will form the basis for the final design crossing. These plans were not originally included in the initial RFP but are now attached for reference. The project involves bridge installation with specific technical requirements, including precast prestressed slabs, steel pile foundations, and specific hydraulic considerations. The document notes that utility relocations will be required, including CenturyLink communication lines and West Oregon Electric lines, which will be handled by others. The project is being undertaken by the Columbia County Soil & Water Conservation District and is designed in accordance with 2017 AASHTO LRFD Bridge Design Specifications and 2021 Oregon Standard Specifications.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| HE1649-25 Oregon Buys Posting Page.pdf | ||
| RFP Bridge Engineering Selection - FINAL.pdf | ||
| S-C00055-00013418 ADDENDUM No 2 - RFP Bridge Engineering Services - Little Clat Confluence.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Extg. ground @ 40' Lt.
Extg. ground @ 40' Rt.
Extg. ground @ ℄ Roadway
ELEVATION
Scale: 1" = 10'-0"
Pin
Std. guardrail transition, typ. all four corners, see Dwg. BR203
Bent 1
85'-714" ±Type "F" concrete bridge rail, see Dwg. BR200
Pin
OHW El. 614
Scour prism: 28.5' wide x 1.1' below downstream thalwegCIP Scour wall, typ.
Wingwall, typ.
Bent 2
Note:
Elevations shown are based on North American Vertical Datum 1988 (NAVD88).
Low chord El. 624.86
Finish grade, typ.
HP14x89 steel piles in prebored holes, extend 10' into bedrock, typ.
Embed bottom of wingwall and scour wall 12" into bedrock or to Elev. 610.5, whichever is shallower
Design flood El. 617.3
El ev at io n in fe et
3'-0" Low flow channel
1' -0
Backfill scour wall excavation with Class 100 riprap placed outside the scour prism, typ.
2'-0" deep native streambed gravels inside scour prism
Reconstruct low flow channel to meet the following points:
Offset 62.5' Elevation 611.0 Offset 37' Elevation 610.7 If bedrock is encountered at a higher elevation, contact the engineer for direction.
Grade to match existing channel thalweg at ROW.
10H:1V, Typ.
1.5' Deep Class 100 riprap along upstream wingwalls, 2' Deep Class 200 riprap along downstream wingwalls
20'-4" Std. Bridge End panel with drainage curb, see Dwg. BR165, typ.
CenturyLink communication lines to be relocated (by others)
L itt le
Cl at sk an ie Ri ve r
Sta. 12+96.51 ℄ Bent 1
Sta. 13+40.51 ℄ Bent 2 Overhead West Oregon
Electric line to be relocated (by others)
S26°34'54"W
℄ Roadway
Apiary Road
Extg. contours
44'-0" Ctr. to ctr. end bents 9 - 15" Precast Prestressed Slabs, See Dwg. BR420
PLAN
Scale: 1" = 10'-0"
0" La ne
0"
La ne
4' -8
Sh ld r.
4' -8
Sh ld r.
Std. guardrail transition, typ. all four corners, see Dwg. BR203
0" O ut
O ut
Existing culverts to be removed
Type "F" concrete bridge rail, typ. See Dwg. BR200
Class 200 riprap placed outside scour prism along downstream wingwalls, typ.
90°Typ.
Class 100 riprap placed along face of bent and upstream wingwalls
PLAN AND ELEVATION JA01
Makenzie Ellett
Jim Culpepper
Amanda Blankenship
Craig Shike
P
R
OJE
C
T
MAXIMUMDESIGN BASE PROBABLEUNITS
617.30
618.14
0.02
619.03
0.00
- 1.33 1.12 years feet feet feet
FLOODFLOOD FLOOD
ft. /s3 524 674 850
LOCATION MAP
No Scale
SEC. 22, T.6N., R.3W., W.M.
LAT. 45.98832, LONG. -123.03960
HYDRAULIC DATA
RECURRENCE INTERVAL
BACKWATER
SCOUR DEPTH
HIGH WATER ELEVATION
AT UPSTREAM FACE OF
BRIDGE ALONG
EMBANKMENT
ITEMS
DISCHARGE
Reviewer:
Checker:Drafter:
Designer:
SHEET NO.
STRUCTURE NO.
BDS DWG NO.
CALC. BOOK
HWY:
M.P.: 8.4
DATE
12/2020
COUNTY
Columbia
DESIGN ACCEPTANCE
PLANS
INFORMATION ONLY
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
COLUMBIA COUNTY SOIL & WATER
CONSERVATION DISTRICT
APIARY RD CULVERT MILEPOST 8.4 REPLACEMENT
APIARY ROAD
LITTLE CLATSKANIE RIVER, APIARY ROAD
COLUMBIA COUNTY
530 Center Street N.E., Suite 605
Salem Oregon 97301
Phone: 503.361.8635
\\deainc.com\files\PROJECT\C\CMCDSWCD0001\0400CAD\SHEETS\JA01-CMCDSWCD01-PE01.dwg 12/9/2020 2:51 PM Dustin Altenburg
Notes:
At the location of the new bridge, the ROW is located at approximately 40' lt. and rt. offset from ℄ Roadway.
The proposed bridge span exceeds the required width of
1.5 times Active Channel Width, which is equal to the scour prism width of 28.5 feet.
12'-0" Lane
4'-8" Shld.
36'-0" Out - Out
12'-0" Lane
4'-8" Shld.
3" Min. ACWS 2% Sl. 2% Sl.
TYPICAL SECTION
Scale: 3/16" = 1'-0"
9-15" Precast prestressed slabs, see Dwg. BR405
℄ Bridge = ℄ Roadway 1'-4" Rail
1'-4" Rail Type "F" concrete bridge rail, typ.
See Dwg. BR200
GENERAL NOTES:
Provide all materials and perform all work according to the 2021 Oregon Standard Specifications for Construction.
Bridge is designed in accordance with the 2017 AASHTO LRFD Bridge Design Specifications (including interim revisions) and the 2020 ODOT Bridge Design Manual (BDM), updated June 2020.
Gradeline diagram to be provided in the final design phase.
The structure is laid out to match existing grade.
CONSTRUCTION SEQUENCE:
Construct using staged construction.
1. Install traffic control to provide one lane, two-way traffic.
2. Install piles through existing roadway.
3. Install temporary jump spans over new abutment cap excavation. Form and pour abutment caps.
4. Close bridge to all traffic for up to four weeks.
5. Remove existing culverts and reconstruct streambed.
6. Place slabs with precast, integral concrete bridge rail.
7. Form and pour scour wall and wingwalls.
8. Construct approach guardrail and top lift paving.
9. Open to traffic.
Reviewer:
Checker:Drafter:
Designer:
SHEET NO.
STRUCTURE NO.
BDS DWG NO.
CALC. BOOK
HWY:
M.P.: 8.4
DATE
12/2020
COUNTY
Columbia
DESIGN ACCEPTANCE
PLANS
INFORMATION ONLY
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
COLUMBIA COUNTY SOIL & WATER
CONSERVATION DISTRICT
APIARY RD CULVERT MILEPOST 8.4 REPLACEMENT
APIARY ROAD
LITTLE CLATSKANIE RIVER, APIARY ROAD
COLUMBIA COUNTY
530 Center Street N.E., Suite 605
Salem Oregon 97301
Phone: 503.361.8635
\\deainc.com\files\PROJECT\C\CMCDSWCD0001\0400CAD\SHEETS\JA02-CMCDSWCD01-GN01.dwg 12/9/2020 2:51 PM Dustin Altenburg
GENERAL NOTES AND TYPICAL SECTION JA02
Makenzie Ellett
Jim Culpepper
Amanda Blankenship
Craig Shike
File details come from the government source that posted it. Updated .